Sera 1 at Rashid Yachts & Marina by Emaar Properties in Rashid Yachts & Marina project rendering used for the June 2026 construction update showing planned landscaped lawn pool cabana seating palm trees and residential buildings in Dubai - Presented by Tohid Fetrat

Emaar Properties · Rashid Yachts & Marina · Construction Update

Sera 1 at Rashid Yachts & Marina Construction Update - June 2026

June 2026 Inspection Records Sera 1 at 0.04% Construction Progress With Enabling Works Progressing in Mina Rashid

Site mobilisation and enabling works define activity at Sera 1 this cycle, with RERA certifying 0.04 percent progress at the 02 June 2026 inspection date.

Direct advisor access. Every message answered personally, never by a call center.

0.04%Construction Progress
02 June 2026Inspection Date
Q4 2029Expected Completion
4031DLD Project Number

Verified DLD Inspection Data

Sera 1 Construction Snapshot

A 0.04 point movement from 0% previously is the first certified progress on the Sera 1 record, which places the project in the enabling works band, the stage where an inspection can find mobilisation but no built element yet.

Project Name

Sera 1 at Rashid Yachts & Marina

Project Number

4031

Project Status

Active

Construction Progress

0.04%

Inspection Date

02 June 2026

Construction Start

26 February 2026

Total Units

203 residential units

Total Built Area

21,420.98 sq m

Expected Completion

30 November 2029

Data source: RERA inspection conducted on 02 June 2026, tracked against DLD inspection records and the independent progress monitoring report for project 4031. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: September 2026.

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

This Inspection Cycle

Sera 1 Construction Progress Summary

Construction start for Sera 1 was registered on 26 February 2026, so the inspection of 02 June 2026 is the first cycle to certify any figure at all: 0.04%, moved from 0% at the previous reading. That movement is mobilisation being recorded rather than structure being measured, and the register states the stage plainly as Enabling Works - Progressing.

Completed
  • Project registration with the DLD on 25 August 2025
  • Construction start recorded in the register on 26 February 2026
  • Escrow trust account on record with First Abu Dhabi Bank P.J.S.C.
In Progress at 0.04%
  • Mobilisation on site, per the 02 June 2026 inspection notes
  • Enabling works, carrying the status Enabling Works - Progressing
  • The first certified movement in the register, 0.04% against 0%
Ahead of Handover
  • Substructure, then superstructure for the two buildings
  • Every remaining RERA inspection cycle from 0.04% toward 100%
  • Completion procedures ahead of the registered date of 30 November 2029
Next inspectionPublished in the DLD project register after the next RERA site visit; this page updates with each cycle.
Completion target30 November 2029 per the current DLD record, roughly three and a half years from this inspection date.
Remaining distance99.96 percentage points separate the June 2026 reading from handover readiness.
Project description on recordTwo buildings holding 203 units: Tower A at G+P+7 with 96 units and Tower B at G+P+8 with 107 units, per the independent progress monitoring report.

Payment Linked Progress

What 0.04% Progress Means for Sera 1 Buyers

Every instalment on the Sera 1 schedule carries a calendar date, and five of them also carry a construction-completion tag, the earliest being the March 2027 instalment tagged to 10% completion. Read against a certified 0.04% on 02 June 2026, that is the gap worth understanding: the payment calendar keeps its own time while the site is still at mobilisation. Four actions matter most at this stage.

Before Your Next Instalment

Verify the escrow account

Every payment ahead of handover should go only to the DLD regulated escrow account registered for project 4031, and at 0.04% that account holds far more of your money than the site does. Sera 1 escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.

Before the October 2026 Instalment

Reread your SPA milestone schedule

Check which of your instalments are dated and which are tied to certified construction, then read both against 0.04% on 02 June 2026 and against a registered completion of 30 November 2029. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the certified milestones.

Within the First Year

Confirm your Oqood registration

At this stage the interim registration of the sale in the Oqood system is the record that proves your position long before a title deed exists. Confirm the entry shows your name, your unit and project 4031, and keep the payment receipts that sit behind it in one place from the first instalment onward.

Every Cycle

Track the early cycles closely

The move off mobilisation into substructure is the first reading that tells a buyer anything about pace, and it is worth watching cycle by cycle. Sera 1 construction updates hub collects each certified figure as it publishes.

General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.

Buying at 0.04%?

Entering at the first certified reading buys the whole payment runway and the widest choice of stock, and pays for it in time: the register puts completion at 30 November 2029, so this is a purchase held through years of cycles rather than months. Every payment goes to the DLD-registered escrow account for project 4031, released against certified construction progress.

Entering Now at 0.04%
  • The full 80/20 runway ahead of you, not the tail of it
  • Developer stock at 17 units, with floor and layout still a choice
  • Completion registered for 30 November 2029, held through every cycle
Typical Late Stage Entry
  • Construction risk largely resolved and visible in the record
  • A short wait, with most of the price due close to handover
  • Whatever stock is left, priced against progress already certified
AED 2.11M ≈ USD 574KStarting Price
80/20 Plan20% Due at Completion
From Q4 2029Expected Handover
Ask What Is Available at Sera 1

17 units listed available on the project page as of this update; availability shifts between cycles.

About the Development

Sera 1 Project Details

Sera 1 at Rashid Yachts & Marina by Emaar evening pool view with cabanas palm trees illuminated residential buildings and leisure areas in Dubai - Presented by Tohid Fetrat
Rashid Yachts & Marina · Emaar Properties

Certified at 0.04% on 02 June 2026, Sera 1 is a two building development of 203 one to three bedroom apartments still at mobilisation on plot 653. Starting prices: AED 2.11M ≈ USD 574K.

Entering here means the longest runway Emaar offers in this community and the trade that comes with it: handover is set for Q4 2029, so the asset is a schedule of payments long before it is a set of keys.

Sera 1 at Rashid Yachts & Marina Project Guide

Site Context This Cycle

Explore Sera 1 Location on Dubai Map

Sera 1 occupies plot 653 in Madinat Dubai Almelaheyah, set back from the berths of Rashid Yachts & Marina and turned inward toward the water garden rather than the water itself. At mobilisation that inland position matters in a practical way: the work this cycle is spread flat across the whole plot as site establishment and access, so there is nothing yet standing above ground for an inspection to measure on either building footprint.

Mina Rashid is a converted working port rather than a greenfield district, which means Sera 1 is starting inside an area that already has its road network, its cruise terminal and the berthed Queen Elizabeth 2 on the waterfront, while the masterplan amenities around the plot arrive on their own schedules between now and the late 2020s. For a buyer entering at 0.04%, the district is the mature part of the equation and the building is the part still to be proved. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Sera 1 at Rashid Yachts & Marina on Dubai Map

Buyer Resources for This Project

Investing in Sera 1 During Early Construction Progress

The enabling works band is where payment protection, residency planning and record keeping matter more than anything visible on site. Each resource below is matched to where Sera 1 stands right now.

Sera 1 at Rashid Yachts & Marina by Emaar Properties in Rashid Yachts & Marina construction updates cover image featuring a project rendering of residential buildings around pools landscaped gardens and leisure areas in Dubai - Presented by Tohid Fetrat
You Are Here

Sera 1 Construction Updates

This page: the verified June 2026 inspection record for Sera 1, from mobilisation to registered completion.

Sera 1 at Rashid Yachts & Marina by Emaar Properties in Rashid Yachts & Marina Golden Visa card graphic above a palm lined pedestrian promenade with pool cabanas and residential buildings in Dubai - Presented by Tohid Fetrat

Sera 1 at Rashid Yachts & Marina Golden Visa From 1 Bedroom

All three tiers at Sera 1 at Rashid Yachts & Marina, Emaar's 203-apartment release, qualify, so no second property is needed.

Read Sera 1 Golden Visa Guide
Sera 1 at Rashid Yachts & Marina by Emaar Properties in Rashid Yachts & Marina escrow account protection concept with shield and padlock icons above landscaped lawns seating areas and residential buildings in Dubai - Presented by Tohid Fetrat

Sera 1 at Rashid Yachts & Marina: The 203-Apartment Escrow Record

Sera 1 at Rashid Yachts & Marina, DLD project 4031: 203 units, First Abu Dhabi Bank escrow, 0.04% certified June 2026.

Verify Sera 1 Escrow Account

Update Timeline

Other Sera 1 Construction Updates

June 2026 is the first published inspection reading for Sera 1, so there is no earlier cycle to compare it against yet. Every reading from here is added to the hub as it is certified, which is what turns a single figure into a record of pace.

All Sera 1 Construction Updates

FAQs

Sera 1 at Rashid Yachts & Marina Construction Progress in June 2026: Frequently Asked Questions

As of the RERA inspection carried out on 02 June 2026, Sera 1 is recorded at 0.04% construction progress in the DLD project register, against 0% at the previous reading. The register describes the stage as Enabling Works - Progressing, and the inspection notes record mobilisation on site.

Yes. The completion date held in the DLD project register can be revised between inspection cycles, and a project this early in its programme has the longest window in which that can happen. The date shown here is the record as of the 02 June 2026 inspection, and any revision would appear in a later cycle on the Sera 1 construction updates hub.

Enabling works are the preparatory activities that come before permanent construction: site establishment, hoarding and access routes, surveys, temporary services, and the excavation or shoring a substructure needs. Progressing means the inspector recorded that work as under way rather than complete. At Sera 1 the 02 June 2026 inspection notes record mobilisation on site, which is the opening phase of that stage.

Construction start was registered on 26 February 2026, a little over three months before the 02 June 2026 inspection, and the certified percentage is weighted across the whole build programme. Mobilisation and enabling works carry very little of that weight, so a project can be genuinely active on site and still register a fraction of one percent. The figure describes where the programme has reached, not whether it is behind.

The sequence that normally follows enabling works is substructure: excavation, shoring where ground conditions require it, piling and pile caps, then the slabs that carry the two buildings the project register describes as Tower A at G+P+7 and Tower B at G+P+8. Certified percentages usually begin moving in larger steps once vertical superstructure starts, because that is where the weighted programme concentrates the work.

No. The image on this page is a developer render of the completed scheme, published as design intent for a Q4 2029 handover rather than as a record of site conditions. No site photograph is published for the June 2026 cycle. The photographs referenced in the independent progress monitoring report remain inside that report, held by RERA and the appointed inspector.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the June 2026 inspection record for Sera 1 at Rashid Yachts & Marina correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts