Skyvue Solair by Sobha Realty in Sobha Hartland 2 construction updates cover image featuring project renderings of multiple residential towers shown side by side in Dubai - Presented by Tohid Fetrat

Sobha Realty · Sobha Hartland 2

Skyvue Solair Construction Updates

The Early Build Record of a Skyvue Tower in Sobha Hartland 2

The Skyvue registration including Skyvue Solair read 10.54% on 30 July 2026, an early record that sets the baseline for this 521-residence Sobha Hartland 2 tower.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

10.54%Construction Progress
30 July 2026Latest RERA Inspection
521 residences in Skyvue SolairTotal Units
Project 3435 (registered as Skyvue)DLD Registration

Construction Snapshot

Skyvue Solair at a Glance

Sobha Realty is building Skyvue Solair as one of the towers of its Skyvue development in Sobha Hartland 2: 521 residences in the tower the developer presents as the first of the Skyvue cluster. On the Dubai Land Department register the towers have no entries of their own; all of them sit under one project name, "Skyvue", project 3435, which the inspection report describes as four buildings. A register search therefore needs "Skyvue" rather than "Skyvue Solair", and every register figure below, from the 01 April 2025 construction start to the 10.54% recorded on 30 July 2026, belongs to that whole registration rather than to the Skyvue Solair tower alone.

DLD Project Number

3435 (registered as Skyvue)

Project Status

Active

Construction Start

01 April 2025 (DLD)

Total Units

521 residences in Skyvue Solair

Total Built-Up Area

235,150.80 sq m (joint DLD register)

Registered Completion Date

31 March 2030 (DLD, whole Skyvue registration)

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

Skyvue Solair Construction Update Timeline

This record opens with a single dated entry: 10.54% for the whole Skyvue registration at the 30 July 2026 inspection, with an earlier register reading of 5.11% that carries no date. Behind both sit the DLD registration of project 3435 on 25 February 2025 and its registered construction start on 01 April 2025, so the track below labels the dated July reading and shows the undated one as a plain dot, while the card links the full July 2026 update.

Inspection MonthConstruction ProgressInspection DateFull Update
July 202610.54%30 July 2026View the July 2026 update

Pace Analysis

How Fast Skyvue Solair Has Been Built

One dated reading cannot yet give an inspection-to-inspection pace. What the Skyvue register does allow is arithmetic across the whole four-building registration, labelled here as arithmetic, not a forecast:

  • 01 Apr 2025 to 30 Jul 2026: registered start to 10.54%, 485 days, whole registrationAbout 0.65 points per month
  • 30 Jul 2026 to 31 Mar 2030: 89.46 points to the registered completion date, 1,340 daysAbout 2.00 points per month

Neither line measures the Skyvue Solair tower by itself. The first spreads 10.54 points over a stretch dominated by mobilisation, enabling works and foundations, the part of a build where recorded percentages tend to stay low because so much of the work sits at or below ground. The second is only what the remaining 89.46 points would need if spread evenly to 31 March 2030, the completion date registered for all four buildings, and the undated 5.11% entry carries no time span, so it cannot be turned into a rate. The curve gets its first real shape with the next dated reading: for an investor, that interval is the first measured pace on this record; for an end user, Sobha Realty's Q1 2029 handover quarter remains the date that applies to a Skyvue Solair unit, while these averages describe the Skyvue site as a whole.

Get the Next Inspection Figure First

Tell me you are tracking Skyvue Solair and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About Skyvue Solair at Sobha Hartland 2

A register percentage only means something next to the building it is counting toward. The project guide sets out what Skyvue Solair buyers are waiting on:

Skyvue Solair by Sobha Realty in Sobha Hartland 2 project rendering showing a residential tower overlooking landscaped greenery, a waterfront and the distant Dubai skyline in Dubai - Presented by Tohid Fetrat

Skyvue Solair: 521 Apartments by Sobha Realty in Sobha Hartland 2

Skyvue Solair is the first Skyvue tower by Sobha in Sobha Hartland 2, with 521 residences from 1 to 3.5 bedrooms.

View the Skyvue Solair Project Guide

Considering an Early-Stage Entry?

Availability at Skyvue Solair shifts between release cycles while the Skyvue registration is still at enabling and foundation works. If the record on this page is what brought you here, ask me what is open now before you settle on a unit type.

Ask About Remaining Availability on WhatsApp

Stage Record

Skyvue Solair Build Stages, Mapped to the Inspections

Each stage below is pinned to the dated entries of the Skyvue registration rather than to a generic sequence. With one dated reading so far, only the first two stages carry register entries; the other three show what still separates the 10.54% of 30 July 2026 from Skyvue Solair's handover.

25 Feb 2025 to 01 Apr 2025

Registration and Site Activation

Project 3435 "Skyvue" entered the DLD register on 25 February 2025, five weeks before its registered construction start of 01 April 2025.

Current PhaseApr 2025 onward, 10.54% on 30 Jul 2026

Mobilisation, Enabling and Foundations

An undated register reading of 5.11%, then 10.54% on 30 July 2026, with mobilisation ongoing, enabling and foundation works progressing and structure works ongoing as well across the registration.

Next, no reading yet

Podium and Tower Structure

The climb through the five podium levels and 54 upper floors in the developer's factbook; readings for this stage will still cover the whole registration.

After structure, no reading yet

Curtain Wall Facade and Fit-Out

The double-glazed, floor-to-ceiling curtain wall the developer specifies, then apartment fit-out on the residential floors from level 6 upward.

Toward the Q1 2029 handover

Commissioning and Handover

District cooling, building systems and amenity commissioning ahead of the handover Sobha Realty schedules for Skyvue Solair in Q1 2029.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Skyvue Solair's own record.

Buyer Position

Tracking Your Position at Skyvue Solair

This page is one of four project resources that together cover a Skyvue Solair purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Skyvue Solair by Sobha Realty in Sobha Hartland 2 construction updates cover image featuring project renderings of multiple residential towers shown side by side in Dubai - Presented by Tohid Fetrat
You Are Here

Skyvue Solair Construction Updates

This page: every dated Skyvue register reading, read for Skyvue Solair buyers from registration to handover.

Skyvue Solair by Sobha Realty in Sobha Hartland 2 Golden Visa concept graphic featuring a gold card in front of residential towers and a landscaped swimming pool in Dubai - Presented by Tohid Fetrat

Skyvue Solair Golden Visa: Four Apartment Types Meet the Threshold

Skyvue Solair by Sobha Realty meets the AED 2M Golden Visa threshold at the 1.5, 2, 3 and 3.5 Bedroom types.

Read the Skyvue Solair Golden Visa Guide
Skyvue Solair by Sobha Realty in Sobha Hartland 2 escrow account concept graphic featuring a shield and padlock above rendered pool terraces and landscaped seating areas in Dubai - Presented by Tohid Fetrat

Skyvue Solair Escrow Account at Dubai Islamic Bank, DLD Project 3435

Skyvue Solair's 521 apartments share the Skyvue escrow account at Dubai Islamic Bank, registered under DLD project 3435.

Verify the Skyvue Solair Escrow Account

Approaching Handover

Between 10.54% and Handover: What Skyvue Solair Buyers Should Do Now

With the Skyvue registration recorded at mobilisation, enabling and foundation works on 30 July 2026, most of the Skyvue Solair build is still ahead, and so are the construction payments each buyer's SPA schedules. Those payments fall due on the SPA's terms rather than on the register's percentage, so the three checks below belong before the next transfer, not after it.

First, before any construction payment leaves your account, check that it is going to the Skyvue Solair escrow account with Dubai Islamic Bank recorded for the Skyvue registration, so the money sits in the regulated account rather than wherever a payment request points.

Second, if residency is part of the plan, settle it through the Skyvue Solair Golden Visa eligibility guide before choosing a unit, because the 1 Bedroom type is priced below the threshold while the larger four types are above it.

Third, read each new reading as a figure for the whole Skyvue registration, starting with the Skyvue Solair July 2026 inspection update, and compare it with the payment conditions in your own SPA rather than with the percentage alone.

Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore Sobha Hartland 2 Structure

A build record reads better with its surroundings in view. These three pages place the Skyvue site within the Sobha Hartland 2 market, its masterplan and the developer building it:

Aerial view of Sobha Hartland 2 properties for sale in Dubai showing modern residential towers, landscaped community areas and the Dubai skyline, Presented by Tohid Fetrat

Sobha Hartland 2 Properties for Sale: Riverside Crescent and Skyscape Apartments

Explore Sobha Hartland 2 properties for sale, comparing Riverside Crescent and Skyscape apartments, payment plans, handover dates and availability.

See Sobha Hartland 2 Properties for Sale
Aerial night view of Sobha Hartland 2 in Dubai showing illuminated residential towers, landscaped community areas and the Dubai skyline, Presented by Tohid Fetrat

Sobha Hartland 2: A Swimmable Lagoon Master Community in Bukadra

Sobha Hartland 2 is Sobha Realty's second MBR City master community, with 15 named projects around a swimmable lagoon.

Explore the Sobha Hartland 2 Community
Sobha Developer Dubai – luxury skyscraper with rooftop pool and skyline view of Burj Khalifa

Sobha Realty: In-House Construction, From High-Grade Materials to the Façade Panels

Sobha Realty controls every stage of construction itself, from producing high-grade materials to the marble flooring and façade panels.

View the Sobha Realty Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

Skyvue Solair Construction Updates Frequently Asked Questions

Skyvue Solair is at an early stage of construction: on 30 July 2026 the DLD register recorded 10.54% for project 3435 "Skyvue", the single registration that covers Skyvue Solair together with the other Skyvue towers, with the project status Active. The inspection report of the same date lists the main contract as progressing, and every dated entry is in the Skyvue Solair inspection timeline above.

The reading for the whole Skyvue registration rose 5.43 points, from 5.11% at the previous inspection to 10.54% on 30 July 2026. The register shows the 5.11% reading without a date, so the interval between the two readings cannot be measured; the 30 July 2026 inspection is set out in full in the Skyvue Solair July 2026 construction update.

Sobha Realty schedules the handover of Skyvue Solair for Q1 2029, while the DLD register gives 31 March 2030 as the completion date of the whole Skyvue registration. That registered date covers all four buildings of project 3435 and sits about a year after the Q1 2029 quarter; the register gives no separate completion date for Skyvue Solair, and registered dates can be revised. This page is updated as each new register reading is published.

Skyvue Solair has 521 residences across 1, 1.5, 2, 3 and 3.5 Bedroom apartments, a total given for the tower by Sobha Realty. The DLD registration it belongs to, project 3435 "Skyvue", covers four buildings, so the unit and area totals on the register describe the whole registration rather than Skyvue Solair, and this page prints no built-up area for the tower. Layouts and unit types are in the Skyvue Solair project guide.

Across the whole Skyvue registration, the 10.54% recorded on 30 July 2026 averages about 0.65 percentage points per month over the 485 days since the registered construction start of 01 April 2025. Reaching 100% by the registered completion date of 31 March 2030 would take about 2.00 points per month over the remaining 1,340 days. Both figures are arithmetic, not a forecast, and neither describes the Skyvue Solair tower alone; the working is in the Skyvue Solair pace analysis above.

The DLD registered project 3435 "Skyvue" on 25 February 2025 and records its construction start as 01 April 2025, five weeks later. The first dated reading tracked on this site is 10.54% on 30 July 2026, preceded on the register by a 5.11% reading shown without a date; how those entries map to build stages is in the Skyvue Solair stage record.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the Skyvue Solair construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

WhatsApp +971543443597
Get the Latest Status