South Beach at Emaar Beachfront by Emaar Properties in Emaar Beachfront project rendering used for the February 2023 construction update showing the planned beachfront promenade, sandy beach and residential balconies in Dubai - Presented by Tohid Fetrat

Emaar Properties · Emaar Beachfront · Construction Update

South Beach at Emaar Beachfront Construction Update - February 2023

February 2023 DLD Register Reading Records 100% for the Registration That Includes South Beach

Inspectors on 23 February 2023 found building works substantially complete, DEWA meters connected and finishing and cleaning under way across the two-tower registration that includes South Beach.

Direct advisor access. Every message answered personally, never by a call center.

100%DLD Register Reading
23 February 2023Inspection Date
ReadyHandover Status
2094DLD Project Number

DLD Register and Inspection Data

South Beach at Emaar Beachfront Construction Snapshot

A 5.94 point rise from the previous register reading carried the registration that includes South Beach to 100% on 23 February 2023, the close of the handover preparation band. South Beach is Tower 1 of the project the Dubai Land Department lists as "Marina Vista", project 2094; the registration also covers the taller second tower, marketed as Marina Vista, so every register figure on this page belongs to the two towers together.

Project Name

Marina Vista

Project Number

2094

Project Status

Finished

Construction Progress

100%

Inspection Date

23 February 2023

Construction Start

27 December 2018

Total Units

270 apartments (South Beach)

Total Built Area

60,083.29 sq m

Expected Completion

30 March 2023

Data source: the Dubai Land Department project register (Dubai REST) reading of 23 February 2023 and the RERA Independent Progress Monitoring Report of the same date, which gives the Progress Status as Completed but prints no percentage. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. This is a historical record: the reading was 1,316 days old on 1 October 2026, so check project 2094 on Dubai REST before relying on it. The image at the top of this page is a project rendering, not a photograph from this inspection. Last updated: February 2023.

Want to hear if the register entry for project 2094 changes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

This Inspection Cycle

South Beach at Emaar Beachfront Construction Progress Summary

Before this inspection the register held a reading of 94.06% for the registration; on 23 February 2023 it moved to 100%, a 5.94 point step. Because that earlier reading carries no date, the step cannot be turned into a monthly rate. What the February record does show is a shift from finishing a building to closing one out, with the main approvals already in hand before the visit.

Completed
  • All building construction activities, recorded as substantially completed
  • Shared podium G+1UG+1M+6P, Tower 1 (South Beach) G+27F+1LR+R and Tower 2 G+37F+R+1UR, as the IPMR describes them
  • DCD (Dubai Civil Defence) received on 21 September 2022
  • Building Completion Certificate received by DDA on 9 December 2022
  • All DEWA meters installed and connected
Still Under Way at 100%
  • Finishing and cleaning works, recorded as progressing at site on the inspection day
Ahead of Handover
  • Registered completion date of 30 March 2023, 35 days after this reading
  • Handover to buyers after completion; South Beach is offered today as Ready
  • Register status moving to Finished, as Dubai REST now shows
Next inspectionNone scheduled: with the Progress Status recorded as Completed, this is the closing reading for project 2094.
Completion target30 March 2023 in the DLD record, 35 days after the 23 February 2023 inspection; now a historical date.
Remaining distance0 percentage points: the February 2023 reading is the full 100%.

Buying After Completion

What 100% Progress Means for South Beach Buyers

On an off plan purchase, a 100% reading is where the last construction linked obligations fall due. South Beach is now sold as Ready, so for a buyer today the February 2023 record plays a different role: it is the evidence file behind a finished tower, and four checks follow from it.

Before Any Transfer

Check the register entry yourself

On Dubai REST, search project 2094, listed as "Marina Vista", not "South Beach"; the lookup itself takes about two minutes against the official DLD project record. South Beach escrow account verification explains which Dubai Islamic Bank account held buyer money while the tower was being built.

Before You Sign

Read the sale agreement against the record

Check how your sale and purchase agreement describes the unit, its furnishing and the transfer timetable, and set those terms beside the completed register entry. Not sure how your purchase terms map to this record? Send me your SPA schedule and I will map it against the recorded milestones.

Window Open Now

Book the snagging inspection

With the tower recorded at 100%, the inspection that matters is the one on your own apartment before transfer, covering finishes, systems and any furniture inventory. South Beach snagging inspection guide sets out what to check in a ready unit.

Each Register Change

Follow the record, not the calendar

No further readings are expected for a Finished registration, so the useful habit is confirming the entry still matches what a seller tells you. South Beach construction updates hub keeps the full register history in one place.

General framework, not legal advice: transfer terms, notice periods, and fee obligations are set by your individual sale agreement and the DLD record, and both should be read directly.

Buying at 100%?

Entering South Beach now means choosing a finished apartment rather than a construction timeline: the February 2023 record closed the build, and what remains is the choice between the units on the market and the condition of each. During construction, buyer payments went to the DLD-registered escrow account for project 2094, released against recorded construction progress.

Entering Now at 100%
  • Completed tower: the register reads 100% and the IPMR names a Building Completion Certificate
  • Handover status Ready, with no construction wait before keys
  • Ready purchase basis, settled at transfer rather than through an instalment schedule
Typical Launch Entry
  • Build risk held from groundworks through to completion
  • A wait of several years is the usual launch horizon
  • Payments spread across the build at launch pricing
AED 2.19M ≈ USD 596KStarting Price
Ready PurchaseNo Off Plan Schedule
ReadyHandover Status
Ask What Is Available at South Beach

Limited Units Available on the South Beach project page at the time of writing; availability shifts between cycles.

About the Development

South Beach at Emaar Beachfront Project Details

Balconies at South Beach in Emaar Beachfront overlooking the marina with yachts and the illuminated skyline at night. Presented by Tohid Fetrat.
Emaar Beachfront · Emaar Properties

Recorded at 100% in February 2023, South Beach is Tower 1 of its registration: 27 residential floors above a shared podium, holding 270 furnished 1, 2 and 3 bedroom apartments sold as holiday homes. Starting prices: AED 2.19M ≈ USD 596K.

Buying after completion gives up the long instalment runway of a launch in exchange for a finished unit you can inspect first; handover status is Ready, and the furnishing specified at launch is worth checking unit by unit.

South Beach at Emaar Beachfront Project Guide

Site Context This Cycle

Explore South Beach at Emaar Beachfront Location on Dubai Map

South Beach stands on the Emaar Beachfront peninsula at Dubai Harbour, between Dubai Marina and Palm Jumeirah, on the plot the register records as 3659 in Marsa Dubai. Because it shares a podium with the second tower, the February 2023 inspection read both buildings as one site, which is why the closing record, its approvals and its utility connections cover the pair rather than South Beach alone.

For a buyer weighing a ready holiday home, the road links count for more than the inspection history: the developer brochure puts Sheikh Zayed Road, Dubai Marina and The Palm about five minutes away, with Downtown Dubai and both international airports about 25 minutes by car. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view South Beach at Emaar Beachfront on Dubai Map

Buyer Resources for This Project

Investing in South Beach at Emaar Beachfront After Completion

Once the record closes at 100%, the useful questions move from build progress to residency, the money trail and the condition of each unit. Each resource below is matched to South Beach as a Ready tower.

South Beach at Emaar Beachfront by Emaar Properties in Emaar Beachfront construction updates cover image featuring a project rendering of waterfront residential towers with a yacht and marina in Dubai - Presented by Tohid Fetrat
You Are Here

South Beach Construction Updates

This page: the 23 February 2023 register reading and inspection notes for South Beach at 100%.

South Beach at Emaar Beachfront by Emaar Properties in Emaar Beachfront Golden Visa graphic with a gold visa card above a pool, residential buildings and skyline view in Dubai - Presented by Tohid Fetrat

South Beach at Emaar Beachfront Golden Visa: One Apartment Is Enough

South Beach at Emaar Beachfront, Emaar's 270-apartment holiday-home tower, qualifies at all three layouts on a single title.

Read South Beach Golden Visa Guide
South Beach at Emaar Beachfront by Emaar Properties in Emaar Beachfront escrow account protection concept with shield and padlock icons above a night marina and illuminated pool view in Dubai - Presented by Tohid Fetrat

South Beach at Emaar Beachfront Escrow: Where Instalments Were Held

Every instalment toward South Beach at Emaar Beachfront, a finished Emaar release, was paid into one Dubai Islamic Bank escrow account.

Verify South Beach Escrow Account
South Beach at Emaar Beachfront by Emaar Properties in Emaar Beachfront snagging inspection graphic over an open plan living, dining and kitchen interior with large windows in Dubai - Presented by Tohid Fetrat

South Beach at Emaar Beachfront Snagging for a Furnished Holiday-Home Tower

South Beach at Emaar Beachfront has 270 furnished apartments over 27 residential floors, on a podium shared with a taller tower.

Book South Beach Snagging

Update Timeline

Other South Beach Construction Updates

February 2023 is the only monthly record for South Beach: the registration reached 100% at this inspection, so the hub carries the full register history instead of a run of monthly pages.

All South Beach Construction Updates

FAQs

South Beach at Emaar Beachfront Construction Progress in February 2023: Frequently Asked Questions

The Dubai Land Department register reading of 23 February 2023 puts the registration that includes South Beach at 100%. DLD files South Beach under project 2094, named "Marina Vista", because South Beach is Tower 1 of that two-tower registration; the taller second tower, marketed as Marina Vista, sits on the same record, so the 100% belongs to both towers together rather than to South Beach alone.

It moved 5.94 points, from a previous register reading of 94.06% to 100% on 23 February 2023. The register gives no date for that earlier reading, so the period it spans is unknown and no monthly rate can be worked out from it: the figure is a step, not a speed.

The register records a completion date of 30 March 2023, and the 100% reading of 23 February 2023 came 35 days before it. The inspection report of that day gives the Progress Status as Completed and Dubai REST now shows the project as Finished, so the registered date is a historical marker rather than a target; South Beach is offered today with a handover status of Ready.

The RERA Independent Progress Monitoring Report of 23 February 2023 recorded all building construction activities as substantially completed, a Building Completion Certificate received by DDA on 9 December 2022, DCD (Dubai Civil Defence) received on 21 September 2022, all DEWA meters installed and connected, and finishing and cleaning works still progressing at site. Each note describes the whole registration, not South Beach on its own.

The inspection report carries four photographs: a finished, empty apartment with floor-to-ceiling glazing and a marina and skyline view, an electrical switchgear room with its panels installed, a completed tower facade seen from the base, and two completed towers with landscaping and palms at ground level. They are record images of the registration and are not reproduced here; the image at the top of this page is a project rendering, not a site photograph.

It shows the building was recorded complete, with its Building Completion Certificate and utility connections in place, more than three and a half years ago; it says nothing about the condition of any individual apartment now. The reading was 1,316 days old on 1 October 2026, so the current entry for project 2094 on Dubai REST and the state of the specific unit both need checking before transfer. How to read the register entry is covered on the South Beach construction updates hub.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the February 2023 inspection record for South Beach at Emaar Beachfront correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts