Sunridge at Rashid Yachts & Marina Construction Update - March 2026
March 2026 Inspection Records Sunridge at 100% Construction Progress in Rashid Yachts & Marina
Snagging works, connected utility meters, and completion certificates on file define Sunridge in March 2026, verified at 100 percent in the 17 March RERA inspection.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Sunridge at Rashid Yachts & Marina Construction Snapshot
A final 2.12 point step, from the previous register reading of 97.88% to 100%, closes the Sunridge progress record at its ceiling and moves the building into the handover preparation band, where the questions turn to notice terms, final payments, and defect checks.
Sunridge by Emaar
2678
Finished
100%
17 March 2026
30 September 2023
130 residential units
11,981.15 sq m
Feb 2027
Data source: RERA inspection conducted on 17 March 2026, about six months before this update, and its Independent Progress Monitoring Report, tracked against DLD inspection records; the register shows the previous reading of 97.88% without a date. The image at the top of this page is a developer rendering, not a photograph of the site. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: September 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Sunridge Construction Progress Summary
The Independent Progress Monitoring Report behind the 17 March 2026 reading describes Sunridge as a B+G+5+R residential building, a concrete structure with blockwork and internal and external finishes, and records all of it as built, with the Civil Defence certificate dated 08 December 2025 and the building completion certificate dated 29 December 2025. What the report leaves open before the Feb 2027 handover is snagging, not construction.
- Concrete structure and blockwork from basement to roof
- Internal and external finishes across the 130 apartments
- Civil Defence and building completion certificates received
- Water, electrical, and gas meters connected
- Snagging works, listed as ongoing in the 17 March 2026 report
- Handover programme for the 1 and 2 bedroom apartments, scheduled for Feb 2027
- Handover notice to buyers under the terms of each SPA
- Buyer inspection and acceptance of each apartment
- Key collection from the scheduled Feb 2027 handover
Payment Linked Progress
What 100% Progress Means for Sunridge Buyers
The Sunridge launch schedule tied its later instalments to estimated construction stages from 20% up to 100% completion, so a certified 100% reading is the milestone the final step of that schedule was written around, recorded here about eleven months before its Feb 2027 date. Your own SPA decides what that means for you; at this stage of Sunridge, four actions matter most.
Verify the escrow account
Any payment still ahead of handover should go only to the DLD regulated escrow account registered for project 2678, held with Emirates Islamic Bank according to the March 2026 report. Sunridge escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA handover clauses
Check how your sale and purchase agreement defines the completion linked instalment, the handover notice period, and the date from which service charges start, then set those clauses against the Feb 2027 handover. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the certified milestones.
Book the snagging inspection
With construction recorded complete on 17 March 2026 and handover scheduled for Feb 2027, Sunridge is inside the booking window for an independent pre handover inspection. Sunridge snagging inspection guide covers timing, scope, and what to document before acceptance.
Watch for handover changes
With the progress figure at its ceiling, the record items still worth watching are the handover notice and any change to the Feb 2027 date. Sunridge construction updates hub carries each new register entry for project 2678.
General framework, not legal advice: completion definitions, notice periods, service charge start dates, and payment obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 100%?
Entering Sunridge now means buying a building the inspection record already treats as built: there is no construction left to wait through, and the choice comes down to layout, floor, and the units still available. Every payment goes to the DLD-registered escrow account for project 2678, released against certified construction progress.
- All construction activities recorded complete on 17 March 2026
- Building completion certificate dated 29 December 2025
- Handover scheduled for Feb 2027, with no build stage left to certify
- Build risk held from the first site works to the final certificate
- Several years between reservation and keys is common
- Instalments spread over the build, at launch pricing
Limited units listed available on the project page as of this update; availability shifts between cycles.
About the Development
Sunridge Project Details

With every construction activity recorded complete in March 2026, Sunridge is a finished B+G+5+R building of 130 apartments in 1 and 2 bedroom layouts beside the canal pool at Rashid Yachts & Marina. Starting prices: AED 1.66M ≈ USD 452K.
For buyers entering at this stage, the trade off is a late position in the launch payment schedule against a building with no construction left to finish, with handover scheduled for Feb 2027.
Sunridge at Rashid Yachts & Marina Project GuideSite Context This Cycle
Explore Sunridge Location on Dubai Map
Sunridge occupies plot 445 in Madinat Dubai Almelaheyah, the DLD location name for this part of Mina Rashid, on the Burj View axis of Rashid Yachts & Marina with the canal pool alongside and the high street of shops and cafes in front. Set in the middle of the residential clusters on a compact low rise footprint, its March 2026 items are internal rather than frontage works: snagging inside the building and water, electrical, and gas meters connected.
Around it, Rashid Yachts & Marina is still filling in: the other apartment buildings listed in the community remain off plan, while the masterplan is organised around a marina of 430 wet berths, the promenade, and the canal pool. For buyers, that means a finished building ahead of much of its neighbourhood, with Sheikh Zayed Road about 10 minutes away by car. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Sunridge Between Completion and Handover
Between recorded completion and a Feb 2027 handover, the useful questions move from construction risk to residency, payment safety, and defect records. Each resource below answers one of them for Sunridge as it stands now.

Sunridge Construction Updates
This page: the March 2026 inspection recording Sunridge at 100%, with handover set for Feb 2027.

Sunridge at Rashid Yachts & Marina Golden Visa: The Two Bedroom
Sunridge at Rashid Yachts & Marina, 130 Emaar apartments, qualifies only at the 2 bedroom; the 1 bedroom starts below.
Read the Sunridge Golden Visa Guide
Sunridge at Rashid Yachts & Marina: A Fully Certified Marina Escrow
Sunridge at Rashid Yachts & Marina read 100% certified March 2026; DLD project 2678 held 130 units' money at Emirates Islamic.
Verify the Sunridge Escrow Account
Sunridge at Rashid Yachts & Marina Snagging Beside the Canal Pool
Sunridge at Rashid Yachts & Marina is a B+G+5+R Emaar building of 130 apartments beside the community park and canal pool.
Book a Sunridge Snagging InspectionUpdate Timeline
Other Sunridge Construction Updates
This March 2026 report is the first monthly page for Sunridge; the construction updates hub holds the full register history from the 30 September 2023 construction start and will carry any later entry.
Where This Update Fits
Explore Sunridge Structure
A finished building is judged against its surroundings: the Rashid Yachts & Marina community it opens into, the Emaar pipeline around it, and the apartments that compete with it for buyers and tenants.

Mina Rashid Properties for Sale
Browse waterfront apartments for sale at Rashid Yachts & Marina, with projects, prices and payment plans.
See Mina Rashid Properties for Sale
Mina Rashid Community Overview
Read the Rashid Yachts & Marina guide: Emaar's transformation of historic Port Rashid into a marina lifestyle community.
Explore the Mina Rashid Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileFAQs
Sunridge at Rashid Yachts & Marina Construction Progress in March 2026: Frequently Asked Questions
The RERA inspection of 17 March 2026 recorded Sunridge, DLD project 2678, at 100% construction progress, and the Independent Progress Monitoring Report for that visit sets its progress status to Completed. The DLD record lists the previous reading as 97.88% without a date, so the final step was 2.12 percentage points. The reading was about six months old when this page was last updated in September 2026, so the live DLD record is the place to confirm it before any decision.
The 17 March 2026 inspection report does not address handover, and as of this update handover remains scheduled for Feb 2027 even though construction was recorded complete at that visit. The handover date can still change, because it is set by the developer's handover programme and the notice terms in each buyer's SPA rather than by the progress reading. Each later record for the project is summarised on the Sunridge construction updates hub.
The Independent Progress Monitoring Report dated 17 March 2026 states that all construction activities are completed, that the building completion certificate was received from Ports, Customs and Free Zone Corporation dated 29 December 2025, and that the Dubai Civil Defence certificate was received dated 08 December 2025. It also records water, electrical and gas meters as connected and snagging works as ongoing at that date. The same report describes the building as B+G+5+R residential: a concrete structure with blockwork and internal and external finishes.
The 17 March 2026 report shows the building finished and certified, while the same report still lists snagging works as ongoing, and handover follows the developer's own programme rather than the inspection date. The launch payment schedule had dated its final instalment, tied to an estimated 100% construction completion, to Feb 2027, so the build was recorded complete well ahead of the date that schedule anticipated. Whether any payment or notice term moves with the earlier recorded completion is set by each individual SPA, not by the inspection record.
No. The image at the top of this page is a developer rendering of the planned waterfront residences and marina setting, used to identify the project, and it shows nothing about the condition of the site in March 2026. The evidence for this update is the 17 March 2026 inspection record itself; the 11 inspection photographs attached to that record are not reproduced here.
With construction recorded complete on 17 March 2026, the remaining steps sit between each buyer and the developer rather than on site: confirming that any payment still due goes to the DLD-registered escrow account for project 2678, reading the handover notice terms in the SPA ahead of Feb 2027, and arranging an independent snagging inspection before accepting the apartment. None of these steps waits on a further progress reading, since 100% is the top of the RERA progress indicator.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the March 2026 inspection record for Sunridge at Rashid Yachts & Marina correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.