TALIA at The Valley by Emaar project rendering used for the December 2024 construction update showing planned modern townhouse facades with covered parking and landscaped frontage in Dubai - Presented by Tohid Fetrat

Emaar Properties · The Valley · Construction Update

TALIA at The Valley Construction Update - December 2024

The 24 December 2024 Inspection Records TALIA at The Valley as Completed, with the DLD Register Reading 100 Percent

The December 2024 inspection recorded enabling, foundation, substructure and superstructure works complete at TALIA, with the Dubai Land Department project register reading 100 percent.

Direct advisor access. Every message answered personally, never by a call center.

100%DLD Register Reading
24 December 2024Inspection Date
31 March 2025Registered Completion
2303DLD Project Number

Verified DLD Register Data

TALIA at The Valley Construction Snapshot

A 6.34 point step above the previous register reading carries TALIA at The Valley to a full reading of 100%, the point at which the record stops describing a building site and starts describing finished townhouses.

Project Name

TALIA at The Valley by Emaar

Project Number

2303

Project Status

Finished

Construction Progress

100%

Inspection Date

24 December 2024

Construction Start

20 February 2022

Total Units

330 townhouses

Total Built Area

66,349.12 sq m

Expected Completion

31 March 2025

Data source: the RERA Independent Progress Monitoring Report for the inspection conducted on 24 December 2024, read alongside the Dubai Land Department project register entry for project 2303, which is where both percentage readings on this page come from. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: September 2026.

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

This Inspection Cycle

TALIA at The Valley Construction Progress Summary

The project register moved TALIA at The Valley from 93.66% to 100%, a step of 6.34 points, and it carries no date against that earlier figure, so the span the step covers is not on the record. What the 24 December 2024 report does put on the record is the shape of the work: every main inspection item recorded complete across a concrete structure and block development of 330 townhouses at ground plus one.

Completed
  • Enabling works and foundations across plot 274 at Al Yufrah 1
  • Substructure beneath the full townhouse grid
  • Superstructure on all 330 townhouses at ground plus one
Recorded at 100%
  • Internal and external finishes on the concrete and block shells
  • All remaining works in the main inspection items, recorded complete
  • Fitted interiors in the inspection photographs: flooring, wardrobe joinery and doors
  • Bathrooms finished and utility metering installed at unit level
After This Reading
  • The registered completion date of 31 March 2025, since passed
  • Handover to buyers, which the project record now shows as ready
  • Independent inspection and written acceptance by each buyer
Next inspectionNone is scheduled on the record. The register carries project 2303 as Finished with a Progress Status of Completed, so no further reading is expected.
Completion target31 March 2025 is the registered completion date in the DLD record, and that date has passed.
Remaining distanceZero percentage points separate the 24 December 2024 reading from a full register reading.

Payment Linked Progress

What 100% Progress Means for TALIA at The Valley Buyers

TALIA was sold on a 60/40 launch plan whose closing 40 percent fell due on 100 percent construction completion, so this reading is the moment that condition was satisfied rather than a step toward it. For anyone looking at a TALIA townhouse now, the open questions move from build risk to money, paperwork and acceptance. Four actions matter most.

Before Any Transfer

Verify the escrow account

Any money you send the developer for a TALIA townhouse belongs in the DLD regulated escrow account registered for project 2303. TALIA at The Valley escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.

Before You Sign

Read your SPA acceptance clauses

Check how your sale and purchase agreement defines acceptance, the notice you are given before keys, and the obligations that fall due at registration, then read those clauses against the registered completion date of 31 March 2025. Not sure how your schedule maps to this reading? Send me your SPA schedule and I will map it against the recorded milestones.

Window Open Now

Book the pre acceptance inspection

With the register showing TALIA finished and handover ready, an independent defect inspection belongs before you sign acceptance rather than after. Two storeys, a private garden and a covered parking bay each carry items a single walkthrough will miss.

Every Cycle

Track the register entry

A delivered project still holds a live register entry, and readings can be republished or restated. TALIA at The Valley construction updates hub keeps each published reading with the date it was current.

General framework, not legal advice: acceptance terms, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.

Buying at 100%?

Entering a project at a full register reading takes the construction question off the table completely: what is left is the house itself, the paperwork, and the choice between the units still available. Any balance still due to the developer goes to the DLD registered escrow account for project 2303, released against recorded construction progress held by the Dubai Land Department.

Entering Now at 100%
  • The register carries project 2303 as Finished, so build risk is closed
  • The registered completion date of 31 March 2025 has already passed
  • You inspect a standing townhouse instead of a specification sheet
Typical Launch Entry
  • Build risk sits with the buyer from excavation through to keys
  • A delivery horizon usually counted in years rather than weeks
  • A longer instalment runway in exchange for launch level pricing
AED 2.85M ≈ USD 776KStarting Price
60/40 Launch PlanSchedule of Record
ReadyHandover
Ask What Is Available at TALIA

Limited units available as listed on the project page at this update; availability shifts between cycles.

About the Development

TALIA at The Valley Project Details

TALIA at The Valley by Emaar modern townhouse facades with landscaped garden pathway greenery and pedestrian walkway in Dubai - Presented by Tohid Fetrat
The Valley · Emaar Properties

With every main item recorded complete at the December 2024 inspection, TALIA is a finished neighbourhood of 330 townhouses at ground plus one, built in three designs: Pharo, Cyrus and Elio. Three bedroom homes start from AED 2.85M ≈ USD 776K, four bedroom homes from AED 3.34M ≈ USD 910K.

For a buyer entering here the trade off runs opposite to an off plan purchase: no construction runway and no milestone schedule left to ride, in exchange for a townhouse that can be walked through and inspected before anything is signed.

TALIA at The Valley Project Guide

Site Context This Cycle

Explore TALIA at The Valley Location on Dubai Map

TALIA occupies plot 274 at Al Yufrah 1, on the Golden Beach side of The Valley between NARA and the Dubai - Al Ain Road, and nothing on the plot rises above ground plus one. That low horizontal layout is why the December 2024 report reads as a single completed set of works rather than a floor by floor sequence: external finishes, boundary treatments and the landscaped sikkas between rows all had to land together before any of the 330 homes could be recorded complete.

The surrounding community was already running by the time this reading was taken, which is the practical difference for a buyer here: Golden Beach is footsteps away, The Pavilion minutes off, and the Rugby Sevens Stadium five minutes by car with Dubai Outlet Mall at eight, so a finished TALIA townhouse is habitable on the day keys change hands rather than dependent on the next delivery phase. See the project position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view TALIA at The Valley by Emaar on Dubai Map

Buyer Resources for This Project

Buying Into TALIA at The Valley After Completion

A delivered project moves the buyer question from construction risk to residency, payment protection and acceptance. Each resource below is matched to where TALIA at The Valley stands right now.

TALIA at The Valley by Emaar construction updates cover image featuring a project rendering of a modern townhouse exterior with covered parking and landscaped frontage in Dubai - Presented by Tohid Fetrat
You Are Here

TALIA at The Valley Construction Updates

This page: the 24 December 2024 register reading and inspection record behind TALIA's completed status.

TALIA at The Valley by Emaar Golden Visa concept with a Golden Visa card above a project rendering of modern townhouse facades and landscaped frontage in Dubai - Presented by Tohid Fetrat

TALIA at The Valley Golden Visa: 330 Townhouses on Title Deed

TALIA at The Valley is Emaar's 330-townhouse neighbourhood on title deed transfer, and both 3 and 4 bedroom typologies qualify individually.

Read the TALIA at The Valley Golden Visa Guide
TALIA at The Valley by Emaar escrow account protection concept with shield and padlock icons above a project rendering of a modern townhouse exterior with parked cars in Dubai - Presented by Tohid Fetrat

TALIA at The Valley Escrow: Emirates NBD's Fully Certified Valley Account

TALIA at The Valley, DLD project 2303, escrowed 330 units with Emirates NBD and read 100% certified December 2024.

Verify the TALIA at The Valley Escrow Account
TALIA at The Valley by Emaar snagging inspection concept featuring a modern living room interior with dining area large glazing and townhouse view in Dubai - Presented by Tohid Fetrat

TALIA at The Valley Snagging: Pharo, Cyrus and Elio Townhouses

TALIA at The Valley is Emaar's neighbourhood of 330 attached townhouses around pocket parks, a short walk from Golden Beach.

Book the TALIA at The Valley Snagging Inspection

Update Timeline

Other TALIA at The Valley Construction Updates

December 2024 is the only dated inspection reading published for TALIA at The Valley so far, and the hub carries each reading as it is added to the record.

All TALIA at The Valley Construction Updates

FAQs

TALIA at The Valley Construction Progress in December 2024: Frequently Asked Questions

The Dubai Land Department project register records TALIA at The Valley at 100% on 24 December 2024, 6.34 points above the previous register reading of 93.66%. The RERA Independent Progress Monitoring Report carrying the same inspection date prints no percentage of its own: it records a Progress Status of Completed and notes that all works in the main inspection items were finished.

Registered completion dates in the DLD project register can be revised between cycles, which is why every figure is read with the date it was current. For TALIA that date has already passed and the register carries project 2303 with a status of Finished, so 31 March 2025 now reads as the registered completion date on record rather than a forward target.

The project register shows the previous inspection figure of 93.66% with no inspection date beside it, while only the current reading of 100% is dated 24 December 2024. Because the earlier figure cannot be placed on the calendar, the 6.34 point step between the two cannot honestly be turned into a monthly rate, and this page does not state one.

The inspection notes dated 24 December 2024 record enabling, foundation, substructure and superstructure works, and all other works in the main items, as completed. The project description on the same report sets out what those items cover: a residential development of 330 townhouses at ground plus one, designed with a concrete structure and block with internal and external finishes.

Progress Status is the monitoring report's own summary field, and Completed is the value recorded for TALIA at the 24 December 2024 visit. Read with the register entry, which carries project 2303 as Finished against a registered completion date of 31 March 2025, it describes a development whose construction record is closed rather than one still being tracked toward a target. How readings are published cycle by cycle is set out on the TALIA at The Valley construction updates hub.

No. The dated December 2024 image on this page is a developer rendering of the townhouse facades rather than a photograph of works on site, and it is presented that way deliberately. RERA inspectors did photograph the project at the 24 December 2024 visit, eight images listed in the project register and four reproduced in the monitoring report, showing finished interiors: a fitted living and dining space with flooring and ceiling services installed, a corridor with fitted wardrobe joinery and doors, a completed bathroom, and an installed utility meter box. Those photographs are Dubai Land Department record artefacts and are not republished here.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the December 2024 inspection record for TALIA at The Valley correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts