Sobha Realty · Sobha Sanctuary
The Brooks at Sobha Sanctuary Construction Updates
The DLD Register Record for 185 Villas, Opened at a Pre-Construction Baseline
The Brooks at Sobha Sanctuary carries a 0% DLD register reading dated 15 July 2026, the pre-construction baseline that readings after the listed 2027 start will extend.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
The Brooks at Sobha Sanctuary at a Glance
The Brooks at Sobha Sanctuary is Sobha Realty's cluster of 185 villas in Sobha Sanctuary, the master community off Dubai-Al Ain Road (E66) in the Dubailand area, held in the Dubai Land Department register as project 4532. Its file opens in an order worth noting: the only inspection, at 0% on 15 July 2026, was recorded before the 30 July 2026 registration and before the 1 January 2027 start date the register lists, so the anchors below describe a baseline rather than a build history. With 110 four-bedroom and 75 five-bedroom villas spread across two and three floors, the record that follows will cover a cluster of low-rise homes rather than a single structure, which is why every figure here carries its date.
4532
Active
1 January 2027 (DLD register)
185 villas (DLD record: 110 four-bedroom, 75 five-bedroom)
59,369,247.78 sq m
31 August 2030 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
The Brooks at Sobha Sanctuary Construction Update Timeline
One inspection makes up the record for The Brooks so far: 0% on 15 July 2026, taken when no construction activity was recorded on site and logged in the inspection report with a progress status of N/A. It is the single dot on the track below and the single entry in the table, which links its July 2026 update; each later reading for the 185 villas joins it here with its own date.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| July 2026 | 0% | 15 July 2026 | View the July 2026 update |
Pace Analysis
How Fast The Brooks at Sobha Sanctuary Has Been Built
Pace is measured between two dated readings, and The Brooks has one. Until a second is recorded, its file holds two fixed reference points rather than a curve:
- 15 Jul 2026: first DLD register reading, report status N/A0% baseline
- 1 Jan 2027 listed start to 31 Aug 2030 registered completionRegister window
Nothing in the July 2026 entry can be read as speed. When RERA inspected the plot on 15 July 2026 it recorded no construction activity, and the register gives 1 January 2027 as the start date, after both that inspection and the 30 July 2026 registration. The first figure worth reading for velocity is therefore the first non-zero reading after the listed start, set against this baseline; from that pair onward, this section will carry measured figures for the G+1 and G+2 villas. For an end user, the practical point today is that the time-linked 60/40 plan runs on its own calendar, so instalments can fall due before the first works are recorded; for an investor, the July baseline fixes the exact point from which every later figure for these 185 villas will be judged.
Get the Next Inspection Figure First
Tell me you are tracking The Brooks at Sobha Sanctuary and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About The Brooks at Sobha Sanctuary
A baseline reading only makes sense next to what is planned for the plot. The project guide sets out the villas this record will follow:

The Brooks at Sobha Sanctuary: 185 Villas on the Central Green Spine
The Brooks at Sobha Sanctuary is Sobha Realty's 185-villa cluster, 110 four-bedroom and 75 five-bedroom residences on the DLD record.
View the The Brooks at Sobha Sanctuary Project GuideConsidering a Pre-Construction Entry?
A purchase at The Brooks today starts the full time-linked schedule from your own booking date, with handover expected in Q3 2030. Availability across the Garden and Courtyard Villas changes between releases, so if this record is what brought you here, ask me what is open now before you compare layouts.
Ask About Remaining Availability on WhatsAppStage Record
The Brooks at Sobha Sanctuary Build Stages, Mapped to the Inspections
Each stage below is pinned to the register dates for The Brooks rather than to a generic sequence. At the 0% reading of 15 July 2026 only the first stage has a dated entry; the others carry the window the register gives them, or stay open until an inspection records them.
Pre-Construction Baseline
Recorded at 0% on 15 July 2026 with no construction activity on site and a report status of N/A; the project was registered on 30 July 2026.
First Works on the Plot
The register lists 1 January 2027 as the start date; the first inspection after it is the earliest that can lift The Brooks above its July 2026 baseline.
Villa Frames, G+1 and G+2
The inspection report describes 185 villas on two and three floors; this stage gets its dates from the readings that record those frames standing.
Finishes, Gardens and Green Spine Links
Interiors, private gardens and landscaping toward the central green spine across the 110 four-bedroom and 75 five-bedroom villas, dated by later inspections.
Completion and Handover
Handover, expected in Q3 2030, and the registered completion date of 31 August 2030 both lie ahead; this stage closes only when a final inspection records 100%.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on The Brooks at Sobha Sanctuary's own record.
Buyer Position
Tracking Your Position at The Brooks at Sobha Sanctuary
This page is one of four project resources that together cover a The Brooks at Sobha Sanctuary purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

The Brooks at Sobha Sanctuary Construction Updates
This page: The Brooks register record, opened by a 0% reading on 15 July 2026.

The Brooks Golden Visa: Garden and Courtyard Villas Above the Threshold
At The Brooks at Sobha Sanctuary by Sobha Realty, both 4 and 5 bedroom villa types clear the AED 2M threshold.
Read the The Brooks at Sobha Sanctuary Golden Visa Guide
The Brooks Escrow Account at Dubai Islamic Bank, DLD Project 4532
The Brooks at Sobha Sanctuary, DLD project 4532, escrows 185 villas at Dubai Islamic Bank and read 0% in July 2026.
Verify the The Brooks at Sobha Sanctuary Escrow AccountApproaching Handover
Between 0% and Handover: What The Brooks at Sobha Sanctuary Buyers Should Do Now
The Brooks reads 0% from 15 July 2026 and the register lists its start date as 1 January 2027, so the useful work for a buyer right now happens on paper rather than on site. Because the 60/40 plan is time-linked, the instalments due 6 and 12 months from booking can arrive before any reading moves off that baseline, which is why the three steps below come first rather than after the first works appear.
First, confirm where your money goes: The Brooks at Sobha Sanctuary escrow account page shows how to match the Dubai Islamic Bank trust account to project 4532 before any transfer.
Second, if residency is part of the plan, check how both villa types relate to the property threshold in The Brooks at Sobha Sanctuary Golden Visa guide before you settle on a layout.
Third, keep the record in view: The Brooks July 2026 baseline inspection update holds the 15 July 2026 entry at 0%, and each later reading joins the timeline above as it is recorded.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore Sobha Sanctuary Structure
A baseline record reads best beside its surroundings: the homes already listed across Sobha Sanctuary, the planned community The Brooks belongs to, and the developer responsible for it. These three pages give that context:

Sobha Sanctuary Properties for Sale
Browse garden villas, estate villas and 1 to 2 bedroom apartments for sale across this community, with current availability and pricing.
See Sobha Sanctuary Properties for Sale
Sobha Sanctuary Dubai: Forest Community, Villas, Apartments and Masterplan
Sobha Sanctuary by Sobha Realty is a master-planned Dubailand community featuring forest-inspired villas, apartments, green corridors and residential clusters.
Explore the Sobha Sanctuary Community
Sobha Realty: In-House Construction, From High-Grade Materials to the Façade Panels
Sobha Realty controls every stage of construction itself, from producing high-grade materials to the marble flooring and façade panels.
View the Sobha Realty Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
The Brooks at Sobha Sanctuary Construction Updates Frequently Asked Questions
The Brooks at Sobha Sanctuary is an active DLD-registered project (number 4532) at the pre-construction stage, with a register reading of 0% from the inspection of 15 July 2026, when no construction activity was recorded on site. That single reading is the whole of the inspection timeline above.
The 15 July 2026 inspection, the first on file for The Brooks at Sobha Sanctuary, put 0% on the DLD register, and its report gives the progress status as N/A, no progress recorded. With no earlier reading there is no point change to state; the full July entry is in The Brooks July 2026 construction update.
Four dates frame the record for project 4532: the 0% inspection on 15 July 2026, registration on 30 July 2026, a construction start date listed as 1 January 2027, and completion registered for 31 August 2030. The inspection is the earliest of the four, and this page prints each date exactly as the register records it.
Handover for The Brooks at Sobha Sanctuary is expected in Q3 2030, a quarter that contains 31 August 2030, the completion date registered with the DLD, so the two values agree as of the 15 July 2026 record. Both remain future dates, and this page is updated if the register shows a revised date or a closing inspection.
The Brooks at Sobha Sanctuary comprises 185 villas: the DLD record lists 110 four-bedroom and 75 five-bedroom residences, and the 15 July 2026 inspection report describes them as G+1 and G+2 floor villas. Per the developer's floor plans, the 4 Bedroom Garden Villas are the G+1 homes with roof access and the 5 Bedroom Courtyard Villas are the G+2 homes with a rooftop terrace.
A pace figure for The Brooks at Sobha Sanctuary needs two dated readings, and the register holds one: 0% on 15 July 2026. With the construction start date listed as 1 January 2027, the first pair able to show work on site will include a reading recorded after that date, so the pace section above carries no figure until then.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the The Brooks at Sobha Sanctuary construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.