Sobha Realty · Sobha Sanctuary
The Grove at Sobha Sanctuary Construction Updates
The Register Record for 166 Estate Villas, Opened at the Baseline
The Grove at Sobha Sanctuary recorded 0% at its 20 May 2026 RERA inspection, a pre-construction baseline for 166 Estate Villas before the register's listed start.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
The Grove at Sobha Sanctuary at a Glance
The Grove at Sobha Sanctuary is Sobha Realty's cluster of 166 Estate Villas inside Sobha Sanctuary, the master community in the Dubailand area off Dubai-Al Ain Road (E66). Its register record opens with a single RERA inspection at 0% on 20 May 2026, taken before the project was registered on 5 August 2026 and before the 1 January 2027 start date the register lists. Because one project number covers 166 separate G+1 and G+2 villas rather than a single structure, every later reading will be one figure for the whole cluster, measured from the anchors below.
4366
Active, registered 5 August 2026
1 January 2027 (DLD register)
166 Estate Villas
81,873.31 sq m
31 August 2030 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
The Grove at Sobha Sanctuary Construction Update Timeline
One inspection makes up The Grove's record so far: RERA's visit of 20 May 2026, logged at 0% in the DLD register, with the inspection report showing a progress status of N/A and no construction activity on site. The single dot on the track below therefore sits on the start line, and the one table row links the full May 2026 update; the next dated reading will be the first that this baseline is compared against.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| May 2026 | 0% | 20 May 2026 | View the May 2026 update |
Pace Analysis
How Fast The Grove at Sobha Sanctuary Has Been Built
A pace reading needs two dated inspections, and The Grove's record holds exactly one. What the register does supply is a fixed sequence of dates that the first measured readings will fall between:
- 20 May 2026: RERA inspection, no construction activity on site0% recorded
- 5 August 2026: DLD registration as project 4366Registered
- 1 January 2027: construction start date listed on the registerListed start
- 31 August 2030: registered completion, inside the Q3 2030 handover quarterRegistered completion
The Grove's record has no curve yet, and the order of its dates explains why. RERA's only visit found no construction activity on site, the DLD registration followed on 5 August 2026, and the register lists a construction start date of 1 January 2027. Until a second inspection records something above 0% after that start, any rate quoted for this villa cluster would be invented rather than measured, so this page publishes none. What the dates do show is the order buyers will live through: under the time-linked 60/40 plan, 60% falls due within 30 months of booking on the calendar, while the build has yet to produce a reading to compare against. For an end user, that makes the first inspections after the listed start the readings to watch; for an investor, it means an entry at The Grove today is priced on the plan and the register dates, not on observed build speed.
Get the Next Inspection Figure First
Tell me you are tracking The Grove at Sobha Sanctuary and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About The Grove at Sobha Sanctuary
A 0% reading only means something next to what is planned for the land. The full project guide covers the villas, prices and payment plan that this record tracks toward:

The Grove at Sobha Sanctuary: Estate Villas, Each With a Private Pool
The Grove at Sobha Sanctuary is a low-rise Sobha Realty cluster of 166 Estate Villas with 4, 5 and 6 bedrooms.
View the The Grove at Sobha Sanctuary Project GuideConsidering a Pre-Construction Entry?
Availability at The Grove shifts from one Sobha Realty release to the next, and entering before the listed 1 January 2027 start keeps the whole 60/40 calendar in front of you. If the record on this page brought you here, ask me which villa types are currently available before you choose between the 4, 5 and 6 bedroom layouts.
Ask About Remaining Availability on WhatsAppStage Record
The Grove at Sobha Sanctuary Build Stages, Mapped to the Inspections
Only the first window below holds an inspection so far; the other four are pinned to dates the DLD register already lists for project 4366, so you can see where The Grove sits between its 0% baseline of 20 May 2026 and the 31 August 2030 registered completion.
Baseline Inspection
RERA's 20 May 2026 visit logged 0% in the DLD register, with an inspection report status of N/A and no construction activity on site.
Registration and Pre-Construction
Project 4366 was registered on 5 August 2026, and the latest reading on record is still the 0% of 20 May 2026.
Listed Start of Works
The DLD register lists 1 January 2027 as the construction start date; readings above the 0% baseline are expected once works begin on site.
Villa Structures at G+1 and G+2
The inspection report describes 166 villas at G+1 and G+2; their structural readings will fill this window, which holds no inspection so far.
Completion and Handover
Sobha Realty's handover is Q3 2030, and the register's 31 August 2030 completion date falls inside that quarter; neither has a reading attached yet.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on The Grove at Sobha Sanctuary's own record.
Buyer Position
Tracking Your Position at The Grove at Sobha Sanctuary
This page is one of four project resources that together cover a The Grove at Sobha Sanctuary purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

The Grove at Sobha Sanctuary Construction Updates
This page: every dated register reading for The Grove, from the 0% May 2026 baseline onward.

The Grove Golden Visa: Every Estate Villa Well Clear of AED 2M
At The Grove at Sobha Sanctuary, Sobha Realty's cluster of Estate Villas, every villa type sits above the AED 2M threshold.
Read the The Grove at Sobha Sanctuary Golden Visa Guide
The Grove Escrow at Dubai Islamic Bank, Before Work on Site Begins
The Grove at Sobha Sanctuary, DLD project 4366, escrows 166 villas at Dubai Islamic Bank and read 0% in May 2026.
Verify the The Grove at Sobha Sanctuary Escrow AccountApproaching Handover
Between 0% and Handover: What The Grove at Sobha Sanctuary Buyers Should Do Now
With The Grove at 0% on 20 May 2026 and the register listing 1 January 2027 as its start date, nothing a buyer does now concerns handover; it concerns where the money goes and how the record will be read. The calendar sets the first deadlines here, not the site: 20% falls due on booking and the first 10% instalment six months later, whether or not a reading above 0% has been recorded by then, so the three steps below come before the first transfer.
First, confirm that every payment goes to the DLD-registered trust account with Dubai Islamic Bank for project 4366; the escrow account guide for The Grove at Sobha Sanctuary shows how to check it against the register.
Second, if residency is part of your plan, settle eligibility before you reserve: every Estate Villa type is priced above the AED 2M ≈ USD 545K threshold, and the Golden Visa guide for The Grove at Sobha Sanctuary explains how timing at the pre-construction stage affects the application route.
Third, keep the 0% baseline as your reference point: The Grove's May 2026 construction update records that visit in full, and the first reading after the listed start will join the timeline above as a new dated row.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore Sobha Sanctuary Structure
A register record for one cluster is only part of the picture; the rest is the master community that is planned around it. These three pages put The Grove's baseline in its community, market and developer context:

Sobha Sanctuary Properties for Sale
Browse garden villas, estate villas and 1 to 2 bedroom apartments for sale across this community, with current availability and pricing.
See Sobha Sanctuary Properties for Sale
Sobha Sanctuary Dubai: Forest Community, Villas, Apartments and Masterplan
Sobha Sanctuary by Sobha Realty is a master-planned Dubailand community featuring forest-inspired villas, apartments, green corridors and residential clusters.
Explore the Sobha Sanctuary Community
Sobha Realty: In-House Construction, From High-Grade Materials to the Façade Panels
Sobha Realty controls every stage of construction itself, from producing high-grade materials to the marble flooring and façade panels.
View the Sobha Realty Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
The Grove at Sobha Sanctuary Construction Updates Frequently Asked Questions
The Grove at Sobha Sanctuary is an active DLD-registered project (number 4366) at the pre-construction stage, recorded at 0% at the RERA inspection of 20 May 2026, when no construction activity was found on site. The register lists a construction start date of 1 January 2027, and the full record is in the inspection timeline above.
One. The RERA inspection of 20 May 2026 recorded 0% for The Grove in the DLD register, and no earlier reading exists, so there is no change between readings to state. That visit is documented in the May 2026 construction update for The Grove at Sobha Sanctuary, and each later inspection will be added to this record as a new dated row.
They agree. Sobha Realty's handover for The Grove at Sobha Sanctuary is Q3 2030, and the DLD register lists a completion date of 31 August 2030 for project 4366, which falls inside that quarter. Both dates lie ahead of the 0% reading of 20 May 2026, and this page's record is updated when later inspections or register revisions are recorded.
The DLD register lists 166 units for project 4366, and the RERA inspection report of 20 May 2026 describes the same scope as 166 proposed villas. Sobha Realty offers them as 4, 5 and 6 Bedroom Estate Villas, and all 166 sit inside the single project percentage that each later inspection records.
G+1 and G+2 are the floor configurations on the 20 May 2026 inspection report for The Grove at Sobha Sanctuary: ground plus one upper floor, and ground plus two upper floors. In the floor plans, the 4 and 5 bedroom villas are ground plus one with a roof level, while the 6 bedroom villas are ground plus two with a private lift.
The DLD register lists a construction start date of 1 January 2027 for project 4366. The first tracked reading, 0% on 20 May 2026, came before that date and before the 5 August 2026 registration, so it stands as the baseline; the order of all three dates is laid out in the stage record above.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the The Grove at Sobha Sanctuary construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.