The Highgrove by Ellington in Meydan Horizon project rendering used for the August 2026 construction update showing the planned residential tower overlooking a turquoise pool and palms in Dubai - Presented by Tohid Fetrat

Ellington · Meydan Horizon · Construction Update

The Highgrove Construction Update - August 2026

August 2026 DLD Register Reading Places The Highgrove at 7% Construction Progress in Meydan Horizon

Enabling, piling and foundation works were progressing at The Highgrove when RERA inspected the Meydan Horizon site on 6 August 2026, with the DLD register reading 7%.

Direct advisor access. Every message answered personally, never by a call center.

7%DLD Register Progress
6 August 2026Inspection Date
Q4 2028Expected Handover
4037DLD Project Number

DLD Register Inspection Data

The Highgrove Construction Snapshot

A 2.69 point rise on the previous DLD reading, which the register shows without a date, brings The Highgrove to 7% and keeps it in the enabling and foundations band, the stage where escrow checks and the payment schedule matter more than anything visible on the skyline.

Project Name

The Highgrove by Ellington

Project Number

4037

Project Status

Active

Construction Progress

7%

Inspection Date

6 August 2026

Construction Start

1 September 2025

Total Units

291 Residences

Total Built Area

27,470.59 sq m

Expected Completion

Q4 2028

Data source: DLD project register reading recorded on 6 August 2026 for project 4037, read with the RERA Independent Progress Monitoring Report of the same date; the register records construction start on 1 September 2025 and project registration on 12 September 2025. The image at the top of this page is a developer rendering of the planned tower, not a photograph of the site. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: August 2026.

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

This Inspection Cycle

The Highgrove Construction Progress Summary

RERA's report for 6 August 2026 found enabling, piling and foundation works progressing at The Highgrove and shows the main contract as progressing. The 7% reading therefore measures groundwork: the four podium levels, the 31 residential floors and the roof levels of this G + 4P + 31F + R + UR tower were all still ahead on that date.

Recorded to Date
  • Construction start recorded on 1 September 2025
  • Project registered with the DLD on 12 September 2025
  • Escrow trust account on record with First Abu Dhabi Bank (FAB)
In Progress at 7%
  • Enabling works across the site
  • Piling works for the tower
  • Foundation works
  • Main contract recorded as progressing
Ahead of Handover
  • Four podium levels above the ground floor
  • 31 residential floors, roof and upper roof
  • First construction-linked instalment at 20% construction
  • Handover expected in Q4 2028
Next inspectionPosted to the DLD project register after RERA's next site visit; the register gives no date for it in advance.
Completion targetHandover expected in Q4 2028; the DLD register records a completion date of 31-12-2028 as of the 6 August 2026 reading.
Remaining distance93 percentage points separate the 6 August 2026 reading from 100%.

Payment Linked Progress

What 7% Progress Means for The Highgrove Buyers

The Highgrove's 70/30 plan ties five instalments to each buyer's own reservation date and four 5% instalments to construction stages from 20% upward, so a reading of 7% decides which payments the build has and has not yet triggered. At this stage of The Highgrove, four actions matter most.

Before Your Next Instalment

Verify the escrow account

Any reservation-date instalment still ahead should go only to the DLD regulated escrow account registered for project 4037 with First Abu Dhabi Bank (FAB). The Highgrove escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.

Before the 20% Milestone

Reread your SPA payment schedule

Check how your sale and purchase agreement words the four construction-linked instalments and the 30% due on completion, and map them against the 7% reading and the Q4 2028 expected handover. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.

After Booking

Confirm your Oqood registration

An off-plan unit at The Highgrove is normally recorded on the DLD's Oqood interim register long before any title deed exists, so check that your unit appears there under project 4037 in your name. If residency is part of the plan, The Highgrove Golden Visa guide sets out how the AED 2M ≈ USD 545K threshold applies to each unit type.

Every Cycle

Track the coming readings

The next register readings will show when the build reaches 20% construction, the point at which the first construction-linked instalment falls due. The Highgrove construction updates hub adds each new dated reading as it is posted.

General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.

Buying at 7%?

Entering The Highgrove at the enabling and foundations stage trades certainty for runway: the tower is still in groundworks, the wait to handover is at its longest, and the whole construction-linked part of the 70/30 plan is still ahead of you. Every payment goes to the DLD-registered escrow account for project 4037, released against construction progress on the DLD record.

Entering Now at 7%
  • 70% of the 70/30 plan spread across the build, 30% on completion
  • No construction-linked instalment triggered by the 6 August 2026 reading
  • Handover expected in Q4 2028
Typical Near-Completion Entry
  • Frame and facade visible on site before you commit
  • A shorter wait between signing and handover
  • Less instalment runway, with most of the price due sooner
AED 1.90M ≈ USD 517KStarting Price
70/30 Plan30% Due on Completion
Q4 2028Expected Handover
Ask What Is Available at The Highgrove

Limited Units Available on the project page as of this update; availability shifts between cycles.

About the Development

The Highgrove Project Details

The Highgrove by Ellington in Meydan Horizon project rendering of the slender residential tower beside landscaped waterways with the city skyline beyond in Dubai - Presented by Tohid Fetrat
Meydan Horizon · Ellington

With enabling, piling and foundation works under way at the 6 August 2026 inspection, The Highgrove is a groundworks-stage tower of 291 residences, from 1 Bedroom Apartments to the 3 Bedroom Penthouse tier, planned above a four-level podium. Starting prices: AED 1.90M ≈ USD 517K.

For buyers entering at this stage, the trade off is the longest instalment runway on the 70/30 plan against the longest wait for the keys, with handover expected in Q4 2028.

The Highgrove by Ellington Project Guide

Site Context This Cycle

Explore The Highgrove Location on Dubai Map

According to the developer documents, The Highgrove's plot lies beside the Meydan Horizon community lagoon, and its outlooks, which vary by unit, take in the lagoon, the wildlife sanctuary at Ras Al Khor and the Downtown Dubai skyline. At the 6 August 2026 inspection that position was still being fixed in the ground: the enabling, piling and foundation works recorded this cycle set the tower's footprint before any podium level rises.

On the developer's map, Al Ain-Dubai Road and E44 Ras Al Khor Road run close to the site, and the developer's location guide lists a proposed metro line about 1 minute's drive away, a link whose status and timing buyers should confirm. For a buyer weighing a Q4 2028 handover at 7%, the useful question is which of those links exist today and which are still plans. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view The Highgrove by Ellington on Dubai Map

Buyer Resources for This Project

Investing in The Highgrove During Early Construction

At the enabling and foundations stage, the questions that decide a purchase are where your instalments are held and whether a unit fits a residency plan. Each resource below is matched to where The Highgrove stands right now.

The Highgrove by Ellington in Meydan Horizon construction updates cover image featuring a project rendering of the tall residential tower beside landscaped waterways in Dubai - Presented by Tohid Fetrat
You Are Here

The Highgrove Construction Updates

This page: the 6 August 2026 register reading for The Highgrove during enabling and foundation works.

The Highgrove by Ellington in Meydan Horizon Golden Visa concept graphic with a gold visa card above a rendering of the residential tower and landscaped waterfront in Dubai - Presented by Tohid Fetrat

The Highgrove Golden Visa: From the 2 Bedroom Tier Upward

The Highgrove, Ellington's lagoon-side tower in Meydan Horizon, reaches the AED 2M Golden Visa threshold from the 2 bedroom tier upward.

Read The Highgrove Golden Visa Guide
The Highgrove by Ellington in Meydan Horizon escrow concept graphic with shield and padlock icons above the rendered residential tower and Dubai skyline in Dubai - Presented by Tohid Fetrat

The Highgrove Escrow Account at First Abu Dhabi Bank, Project 4037

The Highgrove, DLD project 4037, escrows 291 residences at First Abu Dhabi Bank for Ellington, certified at 7% in August 2026.

Verify The Highgrove Escrow Account

Update Timeline

Other The Highgrove Construction Updates

The monthly record for The Highgrove starts with this 6 August 2026 reading; each new register reading joins the hub timeline as its inspection cycle is posted.

All The Highgrove Construction Updates

FAQs

The Highgrove Construction Progress in August 2026: Frequently Asked Questions

The DLD project register shows The Highgrove, project 4037, at 7% construction progress in the inspection report dated 6 August 2026. The RERA Independent Progress Monitoring Report of the same date prints no percentage of its own, so 7% is the register's reading; the report records the main contract as progressing.

No change was recorded. As of the 6 August 2026 reading, the DLD register still listed a registered completion date of 31-12-2028, and handover remains expected in Q4 2028. Registered dates can be revised between inspection cycles, so buyers should confirm the current construction timetable with the developer in writing.

The register shows a previous inspection reading of 4.31% beside the 7% current figure, but it does not show the date of that earlier inspection. Without that date, no monthly pace can be measured between the two readings; the build record from the September 2025 construction start is set out on The Highgrove construction updates hub.

According to the RERA report dated 6 August 2026, enabling, piling and foundation works were progressing at the site. That is groundwork for a tower recorded as G + 4P + 31F + R + UR (ground floor, four podium levels, 31 residential floors, roof and upper roof), so the podium and residential floors were still ahead on that date. The report carries inspection photographs, which this page does not reproduce.

None of the four construction-linked instalments. Under the developer's 70/30 plan those 5% payments fall due on completion of 20%, 30%, 40% and 50% construction, so the 6 August 2026 reading of 7% had not reached the first of them. The five reservation-date instalments run on each buyer's own reservation date; as an example, a buyer who reserved more than 360 days before the reading would by then have had 50% of the price fall due (20%, 10%, 10%, 5% and 5%).

No. It is a developer rendering of the planned tower overlooking a pool and palms, used to illustrate this update, and it is not evidence of progress on site. The dated evidence for August 2026 is the DLD register reading of 7% and the RERA report's notes on enabling, piling and foundation works.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the August 2026 inspection record for The Highgrove correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts