The Woods Abode by Sobha in Sobha Sanctuary construction updates cover image featuring a project rendering of an aerial residential masterplan with landscaped pathways and water features in Dubai - Presented by Tohid Fetrat

Sobha Realty · Sobha Sanctuary

The Woods Abode at Sobha Sanctuary Construction Updates

Tracking an Apartment Building of The Woods From Its First Register Reading

The Woods Abode sits within The Woods registration, recorded at 0% on 21 May 2026, a pre-construction baseline taken before the register's listed 30 December 2026 start.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

0%Construction Progress
21 May 2026Latest RERA Inspection
1267Total Units
Project 4485 (The Woods), ActiveDLD Registration

Construction Snapshot

The Woods Abode at Sobha Sanctuary at a Glance

The Woods Abode is one of the residential buildings of Sobha Realty's The Woods development in Sobha Sanctuary, a building of 1 and 2 bedroom apartments. The Dubai Land Department does not register those buildings one by one: it lists the whole development under the single project name The Woods, project 4485, so anyone checking the register searches for The Woods rather than The Woods Abode, and every register figure below covers the full six-tower registration, not this building alone. That registration counts 1,264 residences, and its record so far holds one dated reading, 0% on 21 May 2026, logged almost two months before the project was registered on 17 July 2026.

DLD Project Number

4485 (The Woods), Active

Project Status

Active

Construction Start

30 December 2026 (register)

Total Units

1267

Total Built-Up Area

83,633.85 sq m (joint DLD register)

Registered Completion Date

30 December 2030 (DLD)

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

The Woods Abode at Sobha Sanctuary Construction Update Timeline

The record for The Woods registration holds a single inspection: 21 May 2026, logged at 0% on the DLD register, with the inspection report of that date giving a Progress Status of N/A and noting no construction activity on site. That reading is the one dot on the track below, sitting at the starting line seven months ahead of the listed 30 December 2026 start date, and the table row links the May 2026 update that covers it. Each later inspection joins this record as it is published.

Inspection MonthConstruction ProgressInspection DateFull Update
May 20260%21 May 2026View the May 2026 update

Pace Analysis

How Fast The Woods Abode at Sobha Sanctuary Has Been Built

With one reading on record there is nothing yet to measure a construction rate against. What the register does fix is the window The Woods registration is working to, in four dated entries:

  • 21 May 2026: first DLD inspection of The Woods registration0%, no earlier reading
  • 17 July 2026: registered with the DLD as The Woods, project 4485Registered
  • 30 December 2026: construction start date listed on the registerListed start
  • 30 December 2030: registered completion date for the whole registrationInside Q4 2030

Those dates are printed in the order the register holds them: the 0% inspection of 21 May 2026 came first, registration followed on 17 July 2026, and the listed start date falls after both. The register gives no reason for that sequence and none is assumed here. Between the listed start and the registered completion, The Woods registration has a four-year window, and Sobha Realty's Q4 2030 handover for The Woods Abode lands in the same quarter as that completion date, so the developer's date and the register's date agree. A measured rate needs two dated readings with work recorded between them; until an inspection logs progress above the May 2026 baseline, any per-month figure would be invented, which is why this section reports the register's own dates instead.

Get the Next Inspection Figure First

Tell me you are tracking The Woods Abode at Sobha Sanctuary and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About The Woods Abode at Sobha Sanctuary

A baseline reading only means something next to what is planned for the plot. The full project guide covers what buyers at The Woods Abode are waiting on:

The Woods Abode by Sobha in Sobha Sanctuary project rendering of residential buildings beside a tree-lined street with pedestrians, cars and a cyclist in Dubai - Presented by Tohid Fetrat

The Woods Abode: Sobha Sanctuary Apartments Set Among Parks and Courtyards

The Woods Abode at Sobha Sanctuary is a Sobha Realty building of 1 and 2 bedroom apartments within The Woods enclave.

View the The Woods Abode at Sobha Sanctuary Project Guide

Considering a Pre-Construction Entry?

Availability at The Woods Abode moves between inspection cycles, and at the May 2026 baseline the decision rests on the plan and the escrow protection rather than on visible works. If the record on this page is what brought you here, ask me what is currently available before you commit to a reservation.

Ask About Remaining Availability on WhatsApp

Stage Record

The Woods Abode at Sobha Sanctuary Build Stages, Mapped to the Inspections

Only the first stage below carries a reading; the rest are bounded by the dates the register already gives for The Woods registration, from the 30 December 2026 listed start to the 30 December 2030 registered completion, so you can see how much of the record is still ahead.

21 May 2026 at 0%

Baseline Inspection Recorded

The first DLD inspection of The Woods registration logged 0%, and the inspection report of the same date noted no construction activity on site.

Current Phase17 Jul 2026 to 30 Dec 2026 (listed start)

Registered, Awaiting the Listed Start

Registered with the DLD as The Woods on 17 July 2026, with 30 December 2026 listed as the construction start date; the latest reading on record at the time of writing is the 0% of 21 May 2026.

From 30 Dec 2026, no reading yet

Structure Across Six Towers

The inspection report describes six towers of basement, ground, 14 floors and roof; this stage appears here only once a later inspection records it.

Before 30 Dec 2030, no reading yet

Facades, Fit-Out and Courtyards

The developer's site plan shows courtyard pools and a central landscaped boulevard between the buildings of The Woods, planned and subject to final design.

Registered completion 30 Dec 2030

Completion and Handover

Sobha Realty's handover for The Woods Abode is Q4 2030, the same quarter as the registered completion date of the whole The Woods registration.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on The Woods Abode at Sobha Sanctuary's own record.

Buyer Position

Tracking Your Position at The Woods Abode at Sobha Sanctuary

This page is one of four project resources that together cover a The Woods Abode at Sobha Sanctuary purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

The Woods Abode by Sobha in Sobha Sanctuary construction updates cover image featuring a project rendering of an aerial residential masterplan with landscaped pathways and water features in Dubai - Presented by Tohid Fetrat
You Are Here

The Woods Abode at Sobha Sanctuary Construction Updates

This page: The Woods Abode's DLD inspection record, from the 0% May 2026 baseline to handover.

The Woods Abode by Sobha in Sobha Sanctuary Golden Visa concept graphic featuring a gold card above a rendered outdoor swimming pool with families and sun loungers in Dubai - Presented by Tohid Fetrat

The Woods Abode Golden Visa: 2 Bedroom Falls Short of AED 2M

At The Woods Abode by Sobha Realty in Sobha Sanctuary, neither apartment type reaches the AED 2M Golden Visa threshold.

Read the The Woods Abode at Sobha Sanctuary Golden Visa Guide
The Woods Abode by Sobha in Sobha Sanctuary escrow account concept graphic featuring a shield and padlock above a rendered landscaped community park with residents and a pond in Dubai - Presented by Tohid Fetrat

The Woods Abode Escrow Under DLD Project 4485, Registered as The Woods

The Woods Abode escrows at Dubai Islamic Bank under DLD project 4485, registered as The Woods, at 0% in May 2026.

Verify the The Woods Abode at Sobha Sanctuary Escrow Account

Approaching Handover

Between 0% and Handover: What The Woods Abode at Sobha Sanctuary Buyers Should Do Now

With 30 December 2026 listed as the start date and no construction recorded at the 21 May 2026 inspection, the decisions that matter at The Woods Abode happen at booking, when the 20% due on booking is paid before any work appears on the register. Bookings are taken ahead of the first reading above the baseline, so the three checks below come before the transfer, not after it.

First, confirm where your money goes: The Woods Abode escrow account page shows how to match the Dubai Islamic Bank account registered to The Woods, project 4485, before the transfer.

Second, settle the residency question before pricing it into the purchase: The Woods Abode Golden Visa guide explains why neither the 1 bedroom nor the 2 bedroom apartments reach the AED 2M property threshold at the listed prices.

Third, follow the record rather than the calendar: your SPA sets when the 20% construction-stage payment falls due, and the May 2026 construction update for The Woods Abode is the baseline every later reading on this page will be measured from.

Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore Sobha Sanctuary Structure

A register reading is only half the picture; the other half is the community planned around it. These three pages put The Woods Abode's record in its market, community and developer context:

Aerial view of Sobha Sanctuary properties for sale in Dubai showing modern residences, landscaped green spaces and contemporary buildings, Presented by Tohid Fetrat

Sobha Sanctuary Properties for Sale

Browse garden villas, estate villas and 1 to 2 bedroom apartments for sale across this community, with current availability and pricing.

See Sobha Sanctuary Properties for Sale
Aerial view of Sobha Sanctuary community in Dubai showing residential neighborhoods, landscaped green spaces and modern buildings, Presented by Tohid Fetrat

Sobha Sanctuary Dubai: Forest Community, Villas, Apartments and Masterplan

Sobha Sanctuary by Sobha Realty is a master-planned Dubailand community featuring forest-inspired villas, apartments, green corridors and residential clusters.

Explore the Sobha Sanctuary Community
Sobha Developer Dubai – luxury skyscraper with rooftop pool and skyline view of Burj Khalifa

Sobha Realty: In-House Construction, From High-Grade Materials to the Façade Panels

Sobha Realty controls every stage of construction itself, from producing high-grade materials to the marble flooring and façade panels.

View the Sobha Realty Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

The Woods Abode at Sobha Sanctuary Construction Updates Frequently Asked Questions

The Woods Abode is at the pre-construction stage: the only reading on the DLD register is 0%, dated 21 May 2026, for project 4485, which covers the whole The Woods registration, and the register lists 30 December 2026 as the construction start date. The full record is in the inspection timeline above.

It cannot be compared yet: the 0% recorded on 21 May 2026 is the first reading on the register for The Woods, so there is no earlier figure and no point change to state. The inspection report of the same date gives a Progress Status of N/A, and the May 2026 construction update covers that inspection in full.

They agree: Sobha Realty's handover for The Woods Abode is Q4 2030, and the registered completion date for the whole The Woods registration, project 4485, is 30 December 2030, inside that quarter. Both are future dates measured against a 0% reading of 21 May 2026, and this page's record is updated as each later inspection is recorded.

The DLD record counts 1,264 residences across the whole The Woods development: 748 one-bedroom and 516 two-bedroom. That figure belongs to the full registration, which the inspection report describes as six towers; The Woods Abode is one of those buildings, and the register does not give a separate count for it.

Progress for The Woods Abode is read from the DLD register under project 4485, The Woods, where one percentage is recorded for the whole development rather than for each building. A reading such as the 0% of 21 May 2026 therefore applies to all six towers of the registration at once, and the register dates above use the same registration-wide record.

Four dates sit on the register for The Woods registration: the 0% inspection of 21 May 2026, registration on 17 July 2026, a listed construction start date of 30 December 2026 and a registered completion date of 30 December 2030. They are shown exactly as recorded, and the listed start and the registered completion are four years apart.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the The Woods Abode at Sobha Sanctuary construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

WhatsApp +971543443597
Get the Latest Status