Sobha Realty · Sobha Sanctuary · Construction Update
The Woods Serenity at Sobha Sanctuary Construction Update - May 2026
May 2026 DLD Inspection Sets a 0% Baseline for the Registration That Includes The Woods Serenity
No construction activity was recorded on site at the 21 May 2026 inspection of The Woods, the six-tower registration that includes The Woods Serenity.
Direct advisor access. Every message answered personally, never by a call center.
DLD Register Record
The Woods Serenity Construction Snapshot
A 0% reading on 21 May 2026, with no inspection before it, places The Woods Serenity at the pre-construction baseline, the band where paperwork and escrow matter more than anything on site. One detail shapes every register figure on this page: The Woods Serenity is a single residential building within Sobha Realty's The Woods development in Sobha Sanctuary, and the DLD does not register the buildings of that development one by one. It lists the development under the single project name The Woods (project 4485), so a buyer checking the record searches for The Woods, not The Woods Serenity, and each reading covers the whole registration rather than this building alone.
The Woods Serenity at Sobha Sanctuary
4485, registered as The Woods
Active
0%
21 May 2026
30 December 2026
1264
83,633.85 sq m (joint DLD register)
Q4 2030
Data source: DLD project register entry for project 4485, The Woods, and the Independent Progress Monitoring Report for the inspection conducted on 21 May 2026; register dates are shown as the DLD record lists them. The Woods development counts 1,264 residences on the DLD record (748 one-bedroom and 516 two-bedroom), a figure for the whole registration rather than for The Woods Serenity. The image at the top of this page is a developer rendering of the planned buildings, not a site photograph. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: May 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
The Woods Serenity Construction Progress Summary
The monitoring report for the 21 May 2026 visit describes the registration as a residential and commercial development of six towers, each with a basement, ground floor, 14 floors and a roof, and gives its Progress Status as N/A. That visit came before the register's other dates: The Woods was registered on 17 July 2026 and its listed construction start date is 30 December 2026, so this cycle records a starting line for the whole registration rather than a measurement of works.
- Baseline DLD inspection at 0% on 21 May 2026
- Registration of The Woods on the DLD register on 17 July 2026
- Trust account bank listed on the monitoring report: Dubai Islamic Bank
- IPMR Progress Status: N/A, no progress recorded
- Inspector's note: no construction activities on site at the time of the visit
- Inspection photographs held on the DLD record, not published here
- Construction start date listed on the register: 30 December 2026
- Works on the six towers of basement, ground, 14 floors and roof described in the report
- Registered completion date of 30 December 2030, inside the Q4 2030 handover expectation
Payment Linked Progress
What 0% Progress Means for The Woods Serenity Buyers
Under the 20/20/60 plan for The Woods Serenity, 20% is paid at booking, 20% during construction as scheduled in each SPA and 60% at handover, so most of the price moves well after this reading. A 0% register reading does not by itself say when any instalment falls due; your SPA does. What it does confirm is that buyers at this stage rely on documents and escrow rather than on anything built, and four actions matter most now.
Verify the escrow account
Your booking payment and every instalment before handover should go only to the DLD regulated escrow account of project 4485, held with Dubai Islamic Bank for the whole The Woods registration. The Woods Serenity escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Read the SPA instalment schedule
The published plan does not say when the construction-stage 20% falls due, so check how your sale and purchase agreement schedules it, along with the handover notice terms, and set both against the Q4 2030 handover expectation. Not sure how your schedule lines up with a register still at 0%? Send me your SPA schedule and I will map it against the DLD register record.
Confirm your Oqood registration
Off-plan sales are recorded on the DLD interim register known as Oqood. With The Woods registered on 17 July 2026, check that your Oqood record shows project 4485 and your own unit before the next instalment leaves your account.
Watch the readings after the start date
The register lists a construction start date of 30 December 2026, so the inspections that follow it are the ones that will show works moving on site. The Woods Serenity construction updates hub logs each dated reading for The Woods registration as it appears.
General framework, not legal advice: payment dates, notice periods, and registration steps are set by your individual SPA and the DLD record, and both should be read directly.
Buying at the 0% Baseline?
Entering before works begin trades certainty for runway: nothing is built yet, handover is expected in Q4 2030, and the payment plan holds most of the price back until the keys. Every payment goes to the DLD-registered escrow account for project 4485, released against construction progress.
- No works recorded yet: the 21 May 2026 register reading is the full risk picture
- 40% of the price paid before handover, 60% at handover under the 20/20/60 plan
- The whole build still ahead of the Q4 2030 handover expectation
- Structure already visible in the inspection record
- A short wait between purchase and handover
- Most of the price due within months rather than years
Limited Units Available on the project page as of this update; availability shifts between cycles.
About the Development
The Woods Serenity Project Details

With no works recorded at the 21 May 2026 inspection, The Woods Serenity is still a pre-construction building of 1 and 2 bedroom apartments, 540 to 964 sq ft, on the central boulevard of The Woods in Sobha Sanctuary. Starting prices: AED 1.00M ≈ USD 272K.
Entering ahead of the listed start date of 30 December 2026 means the longest wait for keys, set against a plan that holds 60% of the price back until handover, which Sobha Realty expects in Q4 2030.
The Woods Serenity at Sobha Sanctuary Project GuideSite Context This Cycle
Explore The Woods Serenity Location on Dubai Map
The developer's site plan places The Woods Serenity directly beside the central landscaped boulevard of The Woods, on a plot Sobha Realty's brochure describes as framed by parks at the front and rear, with townhouse communities alongside. With no construction activity on that plot at the 21 May 2026 inspection, the building's position is for now a question of outlook and of its walk to the shared courtyards, rather than of how works will be sequenced across the six towers that share one site and one register reading.
Sobha Sanctuary lies in the Dubailand area off Dubai-Al Ain Road (E66), about 30 minutes' drive from Downtown Dubai on commonly quoted area figures that are approximate and not timed from the building, and most of what the masterplan sets around the plot, from the approximately 800,000 sq ft park to the leisure and wellness loops, is still planned rather than built. Buyers at this stage are therefore judging the neighbourhood the Q4 2030 handover will arrive into, not the one visible today. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in The Woods Serenity Before Construction Begins
Before works begin, the questions that matter are about protection, residency and how the record will be followed. Each resource below is matched to where The Woods Serenity stands at the 0% baseline.

The Woods Serenity Construction Updates
This page: the 21 May 2026 DLD baseline reading, interpreted for buyers at The Woods Serenity.

The Woods Serenity Golden Visa: Both Apartment Types Below the Property Threshold
At The Woods Serenity, Sobha Realty's building in The Woods, both apartment types sit below the AED 2M Golden Visa threshold.
Read The Woods Serenity Golden Visa Guide
The Woods Serenity Escrow: Instalments Held at Dubai Islamic Bank
The Woods Serenity escrows instalments at Dubai Islamic Bank under DLD project 4485, which read 0% in May 2026.
Verify The Woods Serenity Escrow AccountUpdate Timeline
More Construction Updates for The Woods Serenity
The May 2026 reading is the first entry in this record. Later inspections for The Woods registration are added to the hub as they appear on the DLD register, so the building's story can be followed reading by reading from this baseline.
Where This Update Fits
Explore The Woods Serenity Structure
This May 2026 record is one layer of a wider picture: the Sobha Sanctuary listings it competes with, the master community planned around it, and Sobha Realty as its developer.

Sobha Sanctuary Properties for Sale
Browse garden villas, estate villas and 1 to 2 bedroom apartments for sale across this community, with current availability and pricing.
See Sobha Sanctuary Properties for Sale
Sobha Sanctuary Dubai: Forest Community, Villas, Apartments and Masterplan
Sobha Sanctuary by Sobha Realty is a master-planned Dubailand community featuring forest-inspired villas, apartments, green corridors and residential clusters.
Explore the Sobha Sanctuary Community
Sobha Realty: In-House Construction, From High-Grade Materials to the Façade Panels
Sobha Realty controls every stage of construction itself, from producing high-grade materials to the marble flooring and façade panels.
View the Sobha Realty Developer ProfileFAQs
The Woods Serenity Construction Progress in May 2026: Frequently Asked Questions
The DLD register shows 0% Current Progress for project 4485, The Woods, at the inspection of 21 May 2026. That figure covers the whole registration, which includes The Woods Serenity alongside the other towers of the development, rather than this building alone, and because it is the first inspection on record there is no earlier reading to measure a change against.
Yes. A completion date on the DLD project register can be revised between inspection cycles, and this one belongs to the whole The Woods registration (project 4485), not to The Woods Serenity on its own. As listed for this update it sits inside Q4 2030, the quarter in which Sobha Realty expects handover of The Woods Serenity; any revision would show up in a later update.
The Independent Progress Monitoring Report for the 21 May 2026 visit gives no progress figure, entering N/A, and its inspection note states that no construction activities were taking place on site at the time; the DLD register records the same visit as 0%. The report describes the registration as a residential and commercial development of six towers, each with a basement, ground floor, 14 floors and a roof, so the N/A applies across all six rather than to one building.
The record does not give a reason, and none is assumed here. It shows the order of events: a 0% inspection on 21 May 2026, registration of The Woods on 17 July 2026, and a listed construction start date of 30 December 2026. The May reading therefore works as a dated baseline taken before any works, and this page prints each date exactly as the register lists it.
No. It is a developer rendering of planned residential buildings beside a landscaped park with people exercising, used to illustrate the update; it shows the intended design, not the state of the site. The 21 May 2026 inspection recorded no construction activity, and the inspection photographs held on the DLD record are not reproduced on this page.
It was the only inspection on the record used for this update, but inspections are added cycle by cycle, so a newer entry may already exist. Later readings for project 4485 appear on the DLD project register, viewable through the Dubai REST app, and each dated reading is logged on The Woods Serenity construction updates hub; check the register before relying on the May 2026 figure.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the May 2026 inspection record for The Woods Serenity at Sobha Sanctuary correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.