Verve City Walk Construction Updates

The Dated Register Record for Tower A and Tower B at City Walk

Verve City Walk read 13.71% in the DLD register on 04 August 2026, the first dated entry of a record tracing foundations for two City Walk towers.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

13.71%Construction Progress
04 August 2026Latest RERA Inspection
436 residential unitsTotal Units
Project 3152DLD Registration

Construction Snapshot

Verve City Walk at a Glance

Verve City Walk is Meraas's 436-residence, two-tower project at the north-east corner of City Walk, registered with the DLD as project 3152 on 03 July 2024 and recorded as starting construction on 15 November 2024. By the 04 August 2026 inspection the register read 13.71%, with handover estimated for Q3 2028. Tower A is designed eight floors taller than Tower B (G + 36 against G + 28), so later readings will blend two structures rising to different heights into a single project figure.

DLD Project Number

3152

Project Status

Active

Construction Start

15 November 2024

Total Units

436 residential units

Total Built-Up Area

52,621.79 sq m

Registered Completion Date

15 September 2028 (DLD)

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

Verve City Walk Construction Update Timeline

The Verve City Walk record holds one dated reading so far: 13.71% in the DLD register at the 04 August 2026 inspection, 627 days after the 15 November 2024 construction start. The same register screen shows a previous inspection at 10.74% without a date, so that figure sits on the track below as an unlabelled dot rather than a table row; each new dated reading will join the table with a link to its monthly update.

Inspection MonthConstruction ProgressInspection DateFull Update
August 202613.71%04 August 2026View the August 2026 update

Pace Analysis

How Fast Verve City Walk Has Been Built

With a single dated register reading on file, the pace of Verve City Walk cannot yet be measured between two inspections, so each figure below is arithmetic on the recorded dates, not a forecast:

  • 15 Nov 2024 to 04 Aug 2026: recorded start to 13.71%, over 627 daysAbout 0.66 points per month
  • Previous inspection (date not recorded) to 04 Aug 2026: 10.74% to 13.71%2.97 points, no monthly rate
  • 04 Aug 2026 to 15 Sep 2028: 86.29 points left to the registered completion date, over 773 daysAbout 3.35 points per month needed
  • 04 Aug 2026 to 30 Sep 2028: 86.29 points left to the end of Q3 2028, over 788 daysAbout 3.29 points per month needed

Set side by side, those four lines frame the real question for Verve. Averaged across the 627 days since 15 November 2024, the build has added about 0.66 points per 30-day month, and holding the Q3 2028 estimate would take a monthly rate roughly five times higher across the remaining 86.29 points. That gap does not by itself show the date moving: the 04 August 2026 inspection found enabling, foundation, substructure and superstructure works running at once, and the frame of two towers reaching G + 36 and G + 28 usually adds percentage points faster than the enabling work that fills the opening months of a record. For an end user, the next two or three DLD readings are the ones that show whether the rate is lifting toward 3.35 points a month; for an investor, they are the first hard evidence of how Meraas is pacing this build. Either way, confirm the handover estimate with Meraas and watch each new row as it joins the timeline above.

Get the Next Inspection Figure First

Tell me you are tracking Verve City Walk and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About Verve City Walk at City Walk

A reading of 13.71% on 04 August 2026 only means something next to what Meraas is delivering. The full project guide covers the finished product this record is tracking toward:

Verve City Walk by Meraas in City Walk project rendering of sculptural high-rise residential towers beside palm trees and landscaped streets in Dubai - Presented by Tohid Fetrat

Verve City Walk: Twin Meraas Towers Over a Retail Podium

Verve City Walk is a Meraas project of two towers with 436 units, from one bedroom apartments to five bedroom penthouses.

View the Verve City Walk Project Guide

Considering an Early-Stage Entry?

Buying while Verve is still in its foundation and substructure stage means a longer wait to Q3 2028, and the units Meraas releases change as the towers rise. If this record is what brought you here, ask me which units are available now and how the payment schedule applies to a purchase today.

Ask About Remaining Availability on WhatsApp

Stage Record

Verve City Walk Build Stages, Mapped to the Inspections

Each stage below is pinned to the dates in Verve City Walk's own record, from the 03 July 2024 registration to the single dated reading of 13.71% on 04 August 2026, so later inspections can be slotted into the stage they actually reach.

Jul 2024 to Nov 2024

Registration and Mobilisation

Project 3152 entered the DLD register on 03 July 2024, and construction was recorded as starting on 15 November 2024 on the City Walk corner plot beside Coca-Cola Arena.

Current PhaseNov 2024 onward, 13.71% at 04 Aug 2026

Enabling Works, Foundations and Basements

Recorded at 13.71% on 04 August 2026, when the inspection found enabling, foundation and substructure works progressing for two towers that each sit on two basement levels.

Under way by Aug 2026

Tower A and Tower B Superstructure

Superstructure works were already progressing at the 04 August 2026 inspection; Tower A climbs to G + 36 and Tower B to G + 28, and future readings will date this stage.

Following the frame

Podium, Retail Level and Envelope

The shared podium, the ground-floor retail hub and the facades of both towers follow the frame; no reading on record reaches this stage as of 04 August 2026.

Toward Q3 2028

Finishing, Commissioning and Handover

Fit-out of the 436 residences and their building systems leads to handover, estimated for Q3 2028, with the registered completion date of 15 September 2028 in the same quarter.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Verve City Walk's own record.

Buyer Position

Tracking Your Position at Verve City Walk

This page is one of four project resources that together cover a Verve City Walk purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Verve City Walk by Meraas in City Walk construction updates cover image featuring a project rendering of glass-fronted residential towers and outdoor planted terraces in Dubai - Presented by Tohid Fetrat
You Are Here

Verve City Walk Construction Updates

This page: the dated DLD register record for Verve City Walk, from 2024 groundbreaking to handover.

Verve City Walk by Meraas in City Walk Golden Visa concept graphic featuring a gold card over a rooftop terrace and broad urban view in Dubai - Presented by Tohid Fetrat

Verve City Walk Golden Visa: From the Entry 1 Bedroom

Verve City Walk, Meraas's 436 residences in two high-rise towers, qualifies at all five tiers, the 1 bedroom included.

Read the Verve City Walk Golden Visa Guide
Verve City Walk by Meraas in City Walk escrow account concept image featuring a shield and padlock over a landscaped podium garden by residential buildings in Dubai - Presented by Tohid Fetrat

Verve City Walk Escrow: Meraas's Abu Dhabi Commercial Bank Account

Meraas's Verve City Walk, DLD project 3152, escrows 440 units at Abu Dhabi Commercial Bank, 13.71% certified August 2026.

Verify the Verve City Walk Escrow Account

Approaching Handover

Between 13.71% and Handover: What Verve City Walk Buyers Should Do Now

At 13.71% on 04 August 2026, Verve City Walk is still in its foundation and substructure stage, so what matters for buyers now is payment discipline and paperwork rather than inspecting finished homes. The next dated instalment on the developer's launch schedule, 10% in November 2026, arrives long before handover, and your own SPA sets the dates that apply to you, so the three steps below belong in the coming weeks rather than in 2028.

First, confirm that every remaining instalment goes only to the escrow account Abu Dhabi Commercial Bank holds for project 3152; the Verve City Walk escrow account page shows how to check it against the DLD record before you transfer.

Second, if residency is part of your plan, settle eligibility early through the Verve City Walk Golden Visa guide, which sets out what an off-plan purchase allows before the Q3 2028 handover.

Third, read each register reading as it lands: the Verve City Walk August 2026 construction update holds the full detail of the 13.71% reading, and every later dated reading will join the timeline above as a new row.

Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore City Walk Structure

A build record reads better against what already stands around it. These three pages set Verve's progress in its resale market, community and developer context:

Aerial view of City Walk properties for sale in Dubai showing modern residential buildings, landscaped community spaces and surrounding urban development, Presented by Tohid Fetrat

City Walk: Crestlane Apartments in the Meraas Lifestyle District Facing Downtown Dubai

City Walk is the Meraas lifestyle district in Al Wasl facing Downtown Dubai, with Crestlane apartments on a 75/25 payment plan.

See City Walk Properties for Sale
Aerial view of City Walk community in Dubai showing modern residential buildings, landscaped public spaces and the surrounding city skyline, Presented by Tohid Fetrat

City Walk: Meraas's Urban Quarter With Coca-Cola Arena and Central Park

City Walk is an urban district in Al Wasl with low and mid-rise residences, 236 retail outlets and Burj Khalifa views.

Explore the City Walk Community
Meraas developer Dubai – luxury residential towers including Atélis, Jumeirah Residences, The Edit, Verve City Walk, and Bluewaters Bay

Meraas: Lifestyle Destinations From City Walk to Port de La Mer

Meraas is the name behind City Walk, Bluewaters Island and Madinat Jumeirah Living, from beachfront communities to luxury mixed-use districts.

View the Meraas Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

Verve City Walk Construction Updates Frequently Asked Questions

Verve City Walk is an active DLD-registered project (number 3152) with its main contract listed as progressing, and the Dubai Land Department register showed 13.71% at the inspection of 04 August 2026. At that inspection, enabling, foundation, substructure and superstructure works were all under way. The full record is in the Verve City Walk inspection timeline above.

The register reading dated 04 August 2026 put Verve City Walk at 13.71%, up 2.97 points from the previous inspection reading of 10.74%, whose date the register screen does not show. The RERA report from the same visit lists the works but prints no percentage, and the full breakdown sits in the Verve City Walk construction update for August 2026.

The DLD register lists 15 September 2028 as the registered completion date for project 3152, which falls inside Q3 2028, the handover estimate for Verve City Walk, so as of the 04 August 2026 record the two point to the same quarter. The registered date has not passed, and this page's record is updated whenever a new reading or a revised date appears in the register.

Verve City Walk comprises 436 residential units. The RERA project description from the 04 August 2026 inspection sets out the two towers: Tower A at 2B + G + 36 floors and Tower B at 2B + G + 28 floors, meaning two basement levels and a ground floor beneath the upper floors, with retail on the ground floor and residences on the typical floors. Unit types and layouts are in the Verve City Walk by Meraas project overview.

The DLD register records construction at Verve City Walk as starting on 15 November 2024, 135 days after the project's registration on 03 July 2024. The first dated reading on this page's record is 13.71% at the inspection of 04 August 2026, 627 days after that start.

As arithmetic, not a forecast: from the 13.71% reading of 04 August 2026, the remaining 86.29 points would need about 3.29 points per 30-day month to finish by the end of Q3 2028, or about 3.35 to reach the registered completion date of 15 September 2028. The whole-build average so far is about 0.66 points per month (13.71 points over 627 days), and structural works usually add points faster than enabling works. The working is set out in the Verve City Walk pace analysis above.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the Verve City Walk construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

WhatsApp +971543443597
Get the Latest Status