Emaar · Dubai Hills Estate · Construction Update
Vida Residences Club Point Construction Update - April 2026
April 2026 Inspection Confirms Vida Residences Club Point Reaches 36.5% Construction Progress in Dubai Hills Estate
Structure works, external envelope, MEP, and internal finishes now advance together across both nineteen storey towers, verified at 36.5 percent in the April 2026 RERA inspection.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Vida Residences Club Point Construction Snapshot
A 13.6 point rise since the previous inspection puts Vida Residences Club Point past a third of the way through its programme, the superstructure band where certified readings begin driving milestone linked installments rather than describing early groundworks.
Vida Residences Club Point by Emaar
3309
Active
36.5%
22 April 2026
05 November 2024
672 residential units
61,115.19 sq m
Q1 2029
Data source: RERA inspection conducted on 22 April 2026, tracked against DLD inspection records. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: July 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Vida Residences Club Point Construction Progress Summary
Vida Residences Club Point moved from a previous recorded 22.9% to 36.5% at the 22 April 2026 inspection, a gain of 13.6 points. The character of that gain matters more than its size: the inspector recorded five separate work packages progressing at once, which is what a project looks like when it stops building foundations and starts building floors.
- Enabling works across plot 5367
- Piling beneath both towers and the shared podium
- Foundation works recorded complete at this inspection
- Structure works rising through the G+19 frames of both buildings
- External envelope packages on completed structural floors
- MEP first fix: mechanical, electrical, and plumbing distribution
- Internal works and internal finishes on the earliest handed over levels
- Remaining RERA inspection cycles across 63.5 points
- Podium amenity deck, pools, and landscaped gardens
- Building completion certificate procedures
- Handover from the Q1 2029 window
Payment Linked Progress
What 36.5% Progress Means for Vida Residences Club Point Buyers
The Vida Residences Club Point schedule is milestone linked rather than purely calendar based, so a verified 36.5% is not just a status line: it tells you which construction thresholds the register has already crossed and which one your next installment is measured against. Four actions matter at this stage.
Verify the escrow account
Every installment ahead of handover should go only to the DLD regulated escrow account registered for project 3309, held with First Abu Dhabi Bank per the RERA record. Vida Residences Club Point escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Map your SPA against the certified thresholds
Check how your sale and purchase agreement defines each construction linked installment and whether the trigger is the certified percentage, the calendar date, or both. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the certified milestones.
Confirm your Oqood registration
An off plan purchase is recorded in the DLD interim register through Oqood, which is what protects your position years before a title deed exists. At 36.5% there is a long stretch of programme ahead, so confirm the registration is issued and the details match your SPA rather than assuming it was handled at booking.
Track the remaining cycles
Several inspection readings separate this cycle from completion certification, and each one is what a milestone linked plan is actually measured against. The Vida Residences Club Point construction updates hub keeps the full record in one place.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 36.5%?
Entering a project past the superstructure threshold trades launch pricing for a structure you can see certified in the register rather than promised in a brochure. Every payment goes to the DLD-registered escrow account for project 3309, released against certified construction progress.
- Enabling, piling, and foundations already recorded complete
- The 20% and 30% construction thresholds sit behind the certified reading
- Most of the 80/20 plan still spread across the remaining programme
- Construction risk carried from excavation to handover
- Two to four years of waiting is the usual delivery horizon
- Longer installment runway, priced at launch levels
Limited units listed available on the project page as of this update; availability shifts between cycles.
About the Development
Vida Residences Club Point Project Details

With enabling, piling, and foundations recorded complete, Vida Residences Club Point is a superstructure stage development of 672 apartments in two G+19 towers above a shared podium, overlooking the Dubai Hills golf course. Starting prices: AED 1.61M ≈ USD 438K.
For buyers entering at this stage, the trade off is a longer wait against a payment runway that still has most of its threshold linked installments ahead, with handover expected from Q1 2029.
Site Context This Cycle
Explore Vida Residences Club Point Location on Dubai Map
Vida Residences Club Point sits on plot 5367 in Hadaeq Sheikh Mohammed Bin Rashid, with two towers set on a shared basement, ground, and two level podium and turned toward the championship golf course and the low rise villa grain beyond it. That arrangement is visible in this cycle: the podium is a single continuous structure carrying both buildings, so structure, envelope, and internal packages advance across one site rather than as two independent towers.
Dubai Hills Estate is already an operating community rather than an emerging one, with the mall, the golf club, the park, and King’s College Hospital all delivered and in use, which means Vida Residences Club Point is being built into finished surroundings and its buyers are underwriting construction risk rather than community risk across the years to Q1 2029. See the project’s position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Vida Residences Club Point During Superstructure Progress
The superstructure band is where payment protection and residency planning start doing real work, years before handover paperwork appears. Each resource below is matched to where Vida Residences Club Point stands right now.

Vida Residences Club Point Construction Updates
This page: the verified April 2026 inspection record for Vida Residences Club Point at 36.5%.

Vida Residences Club Point at Dubai Hills Estate Golden Visa: 672 Apartments
Two and three bedroom apartments at Vida Residences Club Point at Dubai Hills Estate qualify individually; the one bedroom needs combination.
Read Vida Residences Club Point Golden Visa Guide
Vida Residences Club Point at Dubai Hills Estate: Its Escrow File
Vida Residences Club Point at Dubai Hills Estate escrows 672 units at First Abu Dhabi Bank, 36.5% certified April 2026.
Verify Vida Residences Club Point Escrow AccountUpdate Timeline
Other Vida Residences Club Point Construction Updates
Follow the full inspection history to see how Vida Residences Club Point moves through each construction phase, reading by reading.
Where This Update Fits
Explore Vida Residences Club Point Structure
This monthly report is one node in the wider record: the community that surrounds the site, the developer delivering it, and the listings competing with it.

Dubai Hills Estate Properties for Sale
Compare the Emaar projects for sale in this community, with current prices, payment plans and handover dates.
See Dubai Hills Estate Properties for Sale
Dubai Hills Estate Community Overview
Read the Dubai Hills Estate guide: 2,700 acres of parks, an 18-hole championship golf course and Dubai Hills Mall.
Explore the Dubai Hills Estate Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileFAQs
Vida Residences Club Point Construction Progress in April 2026: Frequently Asked Questions
As of the RERA inspection conducted on 22 April 2026, Vida Residences Club Point stands at 36.5% construction progress in the DLD project register, with the progress status recorded as main contract progressing.
The register moved from a previous inspection reading of 22.9% to 36.5% on 22 April 2026, a gain of 13.6 points. That movement sits almost entirely in the vertical structure of the two G+19 towers, with the first external envelope and internal finishing packages opening behind it.
The 22 April 2026 inspection records enabling, piling, and foundation works as completed. Structure works, internal works, external envelope, MEP, and internal finishes are all recorded as progressing, which is why several trades now overlap on the same site rather than following one another.
The published schedule ties installments to construction completion thresholds of 20%, 30%, 50%, 70%, and 90%. At 36.5% recorded on 22 April 2026 the 20% and 30% thresholds already sit behind the certified reading, so 50% is the next threshold the register will cross. Your individual SPA governs the actual trigger and due date, so read it against the DLD record rather than the marketing schedule.
The April 2026 record shows no slippage against the Q1 2029 handover window, with 63.5 percentage points between the 22 April 2026 reading and full certification and roughly two and a half years of programme remaining. How inspection cycles and completion certification work is covered on the Vida Residences Club Point construction updates hub.
Yes. Anticipated completion dates in the DLD project register are revised between inspection cycles as programme conditions change, and a project this far from completion has more cycles ahead in which a revision could appear. The window shown here reflects the record as of April 2026; any revision would appear in a later update on this cluster.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the April 2026 inspection record for Vida Residences Club Point at Dubai Hills Estate correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.