Vision Mercedes-Maybach Ultimate Luxury by Binghatti in Mercedes-Benz Places | Binghatti City construction updates cover image featuring a project rendering of residential towers with illuminated façades, landscaped grounds, and palm-lined podium areas in Dubai - Presented by Tohid Fetrat

Binghatti · Mercedes-Benz Places | Binghatti City

Vision Maybach Ultimate Luxury Residences Construction Updates

The Dated Register Record for Towers 2 and 3, Starting From Zero in Nad Al Sheba

Vision Mercedes-Maybach Ultimate Luxury entered the DLD register at 0% on 29 December 2025, the starting line every later Towers 2 and 3 reading is measured from.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

0%Construction Progress
29 December 2025Latest RERA Inspection
1,204 residential unitsTotal Units
Project 4320DLD Registration

Construction Snapshot

Vision Maybach Ultimate Luxury Residences at a Glance

Vision Mercedes-Maybach Ultimate Luxury is Binghatti's 1,204-residence collection in Towers 2 and 3 of Mercedes-Benz Places | Binghatti City, listed in the Dubai Land Department register as project 4320. Its record opens in an unusual order: the only inspection so far, on 29 December 2025, sits 16 days ahead of the 14 January 2026 date the register gives for both registration and construction start, and the cards below print each date exactly as recorded. Because these are two of the twelve towers planned for the city, the readings that follow will also show how quickly this part of the Nad Al Sheba masterplan moves from an empty plot to standing structure.

DLD Project Number

4320

Project Status

Active

Construction Start

14 January 2026

Total Units

1,204 residential units

Total Built-Up Area

62,053.26 sq m

Registered Completion Date

31 August 2027 (DLD)

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

Vision Maybach Ultimate Luxury Residences Construction Update Timeline

This record holds one dated reading: 29 December 2025, when the DLD register logged project 4320 at 0% and the RERA inspection report noted no construction activities on site. The track below therefore carries a single dot at its left edge and the table a single row, linked to the full December 2025 update; every later dated reading for Towers 2 and 3 joins both as it is recorded.

Inspection MonthConstruction ProgressInspection DateFull Update
December 20250%29 December 2025View the December 2025 update

Pace Analysis

How Fast Vision Maybach Ultimate Luxury Residences Has Been Built

A pace figure divides the change between two dated readings by the time between them, and Maybach Ultimate Luxury has one. What the record does hold is a short sequence of dated register events:

  • 29 Dec 2025: first DLD register reading, no site activity noted in the inspection report0% baseline
  • 14 Jan 2026: project registration and construction start, both as the register records them16 days after the reading
  • 31 Aug 2027: registered completion date listed in the DLD register for project 4320Register date
  • Q2 2028: expected handover for Vision Mercedes-Maybach Ultimate LuxuryExpected handover

Read together, those four entries describe a project at its starting line rather than a curve. The 0% logged on 29 December 2025 measures no work at all, so any points-per-month number calculated from it today would be invented, not recorded. The two completion-side dates sit in the record side by side, 31 August 2027 in the register and Q2 2028 for handover, and this page reports both without reading anything into the gap. The first genuine velocity for Towers 2 and 3 arrives with the second dated inspection: for an end user it marks the point the build first shows up on paper, and for an investor the second and third readings together are what reveal how quickly Binghatti carries the shared basement and parking levels out of the ground.

Get the Next Inspection Figure First

Tell me you are tracking Vision Maybach Ultimate Luxury Residences and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About Vision Maybach Ultimate Luxury Residences at Binghatti City

A 0% reading says when the build begins, not what it delivers. The project guide sets out what buyers following this record are waiting for:

Night exterior view of Mercedes Benz Places-Binghatti City featuring illuminated stepped residential towers, vertical lighting accents, a continuous podium base, and surrounding Dubai urban roads. Presented by Tohid Fetrat.

Vision Maybach Ultimate Luxury Residences, Towers 2 and 3 of Binghatti City

Vision Maybach Ultimate Luxury Residences is Binghatti's Mercedes-Maybach branded collection of 1,204 studio to three bedroom apartments in Nad Al Sheba.

View the Vision Maybach Ultimate Luxury Residences Project Guide

Considering a Pre-Construction Entry?

Entering Vision Mercedes-Maybach Ultimate Luxury before any structure is on the record gives the widest choice of floors and layouts, and that choice narrows as the build moves away from its 0% baseline. On the 20/50/30 Payment Plan, 30% of the price is held until the Q2 2028 handover, while the 50% construction share follows the schedule set in your SPA. If the record on this page is what brought you here, ask me for current availability while the selection is still broad.

Ask About Remaining Availability on WhatsApp

Stage Record

Vision Maybach Ultimate Luxury Residences Build Stages, Mapped to the Inspections

Only the first two stages below carry dates from this project's own record; the remaining three are placed against the two-tower configuration of Towers 2 and 3 and fill with dated readings as project 4320 is inspected again.

29 Dec 2025 at 0%

Pre-Construction Baseline

The inspection of 29 December 2025 found no construction activities on the plot, and the DLD register logged its first reading for the project at 0%.

Current PhaseFrom 14 Jan 2026, 0% at last reading

Registration, Start and Groundworks

Registration and construction start are both dated 14 January 2026 in the register; no reading above the 0% baseline has entered this record yet.

Not yet recorded

Shared Basement, Podium and Parking

A basement, a ground floor, a mezzanine and five parking levels form the common base beneath both towers, the first structure later readings will chart.

Not yet recorded

Two Residential Towers

Two residential towers of 19 and 24 residential floors rise from that shared base, per the developer fact sheet, carrying the 1,204 residences of the collection.

Toward Q2 2028

Enclosure, Finishing and Handover

Facades, fit-out, mechanical and roof levels lead to the expected Q2 2028 handover; the register separately lists 31 August 2027 as its completion date.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Vision Maybach Ultimate Luxury Residences's own record.

Buyer Position

Tracking Your Position at Vision Maybach Ultimate Luxury Residences

This page is one of four project resources that together cover a Vision Maybach Ultimate Luxury Residences purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Vision Mercedes-Maybach Ultimate Luxury by Binghatti in Mercedes-Benz Places | Binghatti City construction updates cover image featuring a project rendering of residential towers with illuminated façades, landscaped grounds, and palm-lined podium areas in Dubai - Presented by Tohid Fetrat
You Are Here

Vision Maybach Ultimate Luxury Residences Construction Updates

This page: the dated DLD register record for Vision Mercedes-Maybach Ultimate Luxury, from 0% to handover.

Vision Mercedes-Maybach Ultimate Luxury by Binghatti in Mercedes-Benz Places | Binghatti City Golden Visa graphic with a gold Golden Visa card above a daytime rendering of residential towers and landscaped podium spaces in Dubai - Presented by Tohid Fetrat

Vision Maybach Ultimate Luxury Residences Golden Visa in Towers 2 and 3

Binghatti's Vision Maybach Ultimate Luxury Residences, 1,204 residences in Nad Al Sheba, qualifies from the 1 bedroom; studios sit below.

Read the Vision Maybach Ultimate Luxury Residences Golden Visa Guide
Vision Mercedes-Maybach Ultimate Luxury by Binghatti in Mercedes-Benz Places | Binghatti City escrow account protection graphic with shield and padlock icons above an aerial rendering of illuminated towers and landscaped podium areas in Dubai - Presented by Tohid Fetrat

Vision Maybach Ultimate Luxury Residences: Binghatti City Escrow Record

Binghatti's Vision Maybach Ultimate Luxury Residences holds 1233 units in Dubai Islamic Bank escrow, DLD project 4320, 0% certified December 2025.

Verify the Vision Maybach Ultimate Luxury Residences Escrow Account

Approaching Handover

Between 0% and Handover: What Vision Maybach Ultimate Luxury Residences Buyers Should Do Now

With project 4320 recorded at 0% and handover expected in Q2 2028, the long stretch ahead is where installments are paid against a build that has yet to show on the register. The choices that are hardest to undo later, where your money goes and whether the unit serves a residency plan, are settled while the site still reads zero, so the three steps below belong to now rather than to the first rise in the percentage.

First, route the 20% booking payment and the 50% construction share of the 20/50/30 Payment Plan through the escrow account registered for the project, keeping in mind that the 4% DLD registration fee is paid to the Dubai Land Department, not into escrow; the Vision Mercedes-Maybach Ultimate Luxury escrow account page explains how releases to Binghatti are tied to recorded construction progress.

Second, if residency is part of the plan, confirm eligibility before you commit through the Golden Visa guide for Vision Mercedes-Maybach Ultimate Luxury, because the studio and the larger apartments fall on opposite sides of the property threshold.

Third, keep the December 2025 inspection record for Vision Mercedes-Maybach Ultimate Luxury as your reference point and compare each new dated reading against that 0% baseline before any installment falls due.

Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore Binghatti City Structure

Towers 2 and 3 are two of twelve, so their build record reads best against what surrounds it. These three pages place the Maybach Ultimate Luxury readings in their listing, community, and developer context:

Aerial masterplan view of Mercedes Benz Places Binghatti City properties for sale in Dubai with residential towers and landscaped community spaces, Presented by Tohid Fetrat

Mercedes-Benz Places: Binghatti's Branded Residential City in Meydan

Mercedes-Benz Places Binghatti City offers apartments across 3 branded projects in Meydan: Vision Iconic and both Mercedes-Maybach residences.

See Binghatti City Properties for Sale
Binghatti City skyline at sunset featuring Mercedes-Benz Places, a landmark branded residential city in Dubai with iconic high-rise towers. Presented by Tohid Fetrat.

Binghatti City Community Overview

Explore the Mercedes-Benz Places Binghatti City community in Meydan, including its masterplan, branded residential towers, location, connectivity, developer, and luxury lifestyle vision.

Explore the Binghatti City Community
Binghatti luxury towers in Dubai – Bugatti Residences, Mercedes-Benz Places, and Skyblade by Binghatti, representing iconic branded architecture and innovation, presented by Tohid Fetrat.

Binghatti: Record Construction Speed and Branded Towers With Bugatti and Mercedes-Benz

Binghatti has delivered more than 60 projects since 2008, with 27 under development and two master communities across Dubai.

View the Binghatti Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

Vision Maybach Ultimate Luxury Residences Construction Updates Frequently Asked Questions

Vision Mercedes-Maybach Ultimate Luxury is an Active project in the Dubai Land Department register, number 4320, and its latest reading in this record is 0%, dated 29 December 2025, the pre-construction baseline for Towers 2 and 3. The register dates registration and construction start to 14 January 2026. That reading was about nine months old when this page was compiled in October 2026, so a newer one may already be listed for project 4320 on the Dubai REST app; the dated record is in the inspection timeline above.

The inspection history of Maybach Ultimate Luxury contains a single dated reading: 0% in the DLD register on 29 December 2025, when the RERA inspection report noted no construction activities on site and printed a Progress Status of N/A. With no earlier reading there is no point change to report; the full record for that visit is in the Vision Mercedes-Maybach Ultimate Luxury December 2025 construction update.

Vision Mercedes-Maybach Ultimate Luxury has one dated reading, 0% on 29 December 2025, and a pace figure needs at least two dated readings to divide a change in percentage by the time between them. Until a second reading for project 4320 is recorded, any points-per-month number would be invented rather than measured; the first real figure will appear in the pace analysis once that reading exists.

The DLD register lists 31 August 2027 as the registered completion date for Maybach Ultimate Luxury, project 4320, while the expected handover for the project is Q2 2028. Both are recorded facts reported side by side: the record behind this page gives no reason for the difference, and neither date is derived from the 0% reading of 29 December 2025.

Vision Mercedes-Maybach Ultimate Luxury will deliver 1,204 residential units, from studios to three bedroom apartments, in Towers 2 and 3 of Mercedes-Benz Places | Binghatti City. The developer fact sheet gives two residential towers of 19 and 24 residential floors above a shared basement, ground, mezzanine and five parking levels; the December 2025 inspection report counts one more floor on the taller tower, and the approved drawings and the SPA govern the final count. No built-up area figure is printed here because none in the record is labelled as one. Layouts and prices are on the Maybach Ultimate Luxury project page.

Vision Mercedes-Maybach Ultimate Luxury has one dated inspection in this record, on 29 December 2025, so no interval between visits can be measured from it yet, and the December 2025 report does not date the next visit. The spacing becomes readable once a second dated reading for project 4320 is recorded; how inspection data is tracked across projects is set out on the Dubai Construction Updates methodology hub.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the Vision Maybach Ultimate Luxury Residences construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

WhatsApp +971543443597
Get the Latest Status