Emaar · Dubai Creek Harbour · Construction Update
Address Residences at Dubai Creek Harbour Construction Update - May 2026
May 2026 DLD Register Reading Places Address Residences at 26.44% Construction Progress in Dubai Creek Harbour
Structure works climb at Address Residences while envelope, MEP and finishes progress on lower floors, recorded at 26.44 percent in the 4 May 2026 DLD register.
Direct advisor access. Every message answered personally, never by a call center.
DLD Register Inspection Data
Address Residences Construction Snapshot
A 9.62 point rise on the previous inspection places Address Residences in the superstructure band at 26.44%, the stage where each register reading decides which of Emaar's construction-linked instalments have fallen due.
Address Residences at Dubai Creek Harbour
3229
Active
26.44%
4 May 2026
11 December 2024
324 Residential
33,616.39 sq m
Q1 2029
Data source: the Dubai Land Department project register (Dubai REST) reading of 4 May 2026 for project 3229, listed there as "Address Residences l Dubai Creek Harbour", read alongside the RERA Independent Progress Monitoring Report of the same date. The register shows the previous reading of 16.82% without a date, so no pace between the two readings is calculated. The hero image is an Emaar project rendering of the planned promenade, not a photograph of the site. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: May 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Address Residences Construction Progress Summary
On 4 May 2026 the DLD register moved Address Residences from a previous inspection reading of 16.82% to 26.44%, a 9.62 point step; because the register gives that earlier reading no date, this report states the size of the step, not its speed. The RERA report of the same day places the work: foundations finished, the frame rising at different stages, and envelope, MEP and finishing trades already active.
- Enabling works on plot 285
- Piling works beneath the tower
- Foundation works, recorded complete in the RERA report
- Structure works progressing at different stages up the tower
- External envelope on the enclosed lower levels
- MEP services, internal works and internal finishes
- Site mobilization, recorded as ongoing
- Remaining structure to the roof of "B + G + 2P + 35 Floors + Mechanical Roof", per the IPMR
- Envelope, MEP and finishes across all 324 residential units
- Further DLD register readings toward 100%
- Handover expected in Q1 2029; registered completion 31 January 2029
Payment Linked Progress
What 26.44% Progress Means for Address Residences Buyers
Address Residences runs on an 80/20 plan whose later instalments follow construction milestones, so the 26.44% reading of 4 May 2026 is a payment signal as much as a progress report: it sits past the plan's 20% milestone and short of the 40% one. At this stage of the build, four actions matter most.
Verify the escrow account
Every construction-linked instalment should go only to the DLD regulated escrow account registered for project 3229 with Emirates NBD. Address Residences escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA milestone schedule
Check how your sale and purchase agreement words the construction-linked instalments, because the next trigger after this reading is the 40% milestone, and confirm which earlier instalments your contract already treats as due. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Confirm your Oqood registration
An off-plan purchase in project 3229 is registered with the DLD as Oqood, the interim record of your unit until title follows after handover. Check that the Oqood entry names the right unit and buyer before the next construction-linked payment leaves your account.
Track the remaining cycles
With 73.56 points still to be recorded before Q1 2029, many register readings lie ahead. Address Residences construction updates record logs each reading as it publishes, milestone by milestone.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 26.44%?
Entering mid-construction trades some payment runway for evidence: the foundations are recorded as complete and the frame is rising, while the remaining milestone instalments, including 20% on completion, still lie ahead. Every payment goes to the DLD-registered escrow account for project 3229, released against recorded construction progress.
- Foundations recorded complete and the frame rising, per the 4 May 2026 RERA report
- Under three years to the Q1 2029 expected handover
- Instalments already due under the schedule of record are settled at entry, per Emaar's current terms
- Construction risk carried from an empty plot to handover
- Three to four years between booking and keys is a common horizon
- Longest instalment runway, priced at launch levels
Limited units available per the project page as of this update; availability shifts between cycles.
About the Development
Address Residences Project Details

At 26.44% on the DLD register, Address Residences is a frame-stage Emaar tower carrying the Address brand: 324 residential units across one to three bedroom apartments and three bedroom townhouses, in a single tower of 35 floors per the RERA report. Starting prices: AED 2.00M ≈ USD 545K.
For buyers entering at this stage, the trade off is a longer wait against a larger share of the price still tied to construction milestones, with handover expected in Q1 2029 and a registered completion date of 31 January 2029.
Address Residences Dubai Creek Harbour Project GuideSite Context This Cycle
Explore Address Residences Location on Dubai Map
Address Residences occupies plot 285 in Al Khairan First, the register's name for the eastern side of Dubai Creek Harbour across the inner channel from Central Park, within the masterplan's eastern cluster of residential towers. On a plot like this the cycle's work is vertical: the frame climbing toward the 35 floors described in the RERA report while the lower levels are enclosed and serviced.
Dubai Creek Harbour is a masterplan still being built out around 500,000 sqm of parks and open spaces, per Emaar, and its rail link is future rather than present: the four metro stations Emaar refers to are planned on the future Blue Line. Buyers weighing occupation or rental against the Q1 2029 handover should therefore price in a district that keeps maturing around the tower. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Address Residences During Superstructure Progress
The superstructure band is where payment protection, milestone tracking and residency planning start to overlap. Each resource below is matched to where Address Residences stands at the 4 May 2026 reading.

Address Residences Construction Updates
This page: the 4 May 2026 register reading for Address Residences, foundations complete, frame rising.

Address Residences at Dubai Creek Harbour Golden Visa: Exactly on the Line
Emaar's Address Residences at Dubai Creek Harbour, 324 units, qualifies at every type, the 1 bedroom exactly at the threshold.
Read Address Residences Golden Visa Guide
Address Residences at Dubai Creek Harbour Escrow, Held at Emirates NBD
Emirates NBD holds Address Residences at Dubai Creek Harbour escrow, DLD project 3229, 326 units, certified 26.44% in May 2026.
Verify Address Residences Escrow AccountUpdate Timeline
Other Address Residences Construction Updates
This is the first published monthly update for Address Residences, so the timeline starts with the 4 May 2026 reading; the hub collects every later reading as the register adds it.
Where This Update Fits
Explore Address Residences Structure
This monthly report sits inside a wider record: the Dubai Creek Harbour community around the tower, the developer building it, and the listings that compete with it.

Dubai Creek Harbour Properties for Sale
Browse waterfront apartments, branded residences and penthouses for sale in Dubai Creek Harbour.
See Dubai Creek Harbour Properties for Sale
Dubai Creek Harbour: Emaar's Waterfront City With a Marina and Urban Beach
Dubai Creek Harbour is Emaar's waterfront city between Downtown Dubai and the Creek, planned for 48,500 homes with skyline views.
Explore the Dubai Creek Harbour Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileFAQs
Address Residences at Dubai Creek Harbour Construction Progress in May 2026: Frequently Asked Questions
The Dubai Land Department project register recorded Address Residences, project 3229, at 26.44% construction progress on 4 May 2026, with project status Active. The register lists the project as "Address Residences l Dubai Creek Harbour", which is the form to search for on Dubai REST, and the RERA report of the same date gives its progress status as "Main Contract - Progressing".
The register shows a previous inspection of 16.82% beside the 4 May 2026 reading of 26.44%, a rise of 9.62 points, but gives no date for that earlier reading. Without a date the rise cannot be turned into a monthly pace, so it is reported as the size of the step only. A measured pace becomes possible once a later dated reading can be compared with the 4 May 2026 figure.
The May 2026 record shows no change to the timeline: handover is expected in Q1 2029, and the DLD register's completion date of 31 January 2029 falls inside that quarter. As plain arithmetic, not a forecast, 26.44 points over the 509 days since the registered start of 11 December 2024 averages about 1.56 points per 30 days, while the remaining 73.56 points across the 1,003 days to 31 January 2029 would average about 2.20. Building programmes rarely move at a constant rate, so neither figure signals a delay or an early finish on its own; how readings build toward completion is explained in the Address Residences Dubai Creek Harbour construction updates guide.
The RERA Independent Progress Monitoring Report dated 4 May 2026 records mobilization as ongoing, enabling, piling and foundation works as completed, and structure works progressing at different stages, with internal works, external envelope, MEP and internal finishes also progressing. It describes the building as "B + G + 2P + 35 Floors + Mechanical Roof. Having 324 residential units and 2 Retail units". The report itself prints no percentage; the 26.44% figure comes from the DLD register.
As arithmetic on Emaar's schedule of record, not a developer statement: at 26.44% on 4 May 2026 the reading sits above the 20% construction milestone, and the instalments up to and including that milestone add to 55% of the price. The milestones at 40%, 60%, 80% and 100% construction completion, worth 45% together, had not been reached on that reading. Emaar's calendar estimated the 20% milestone for Jun 2026, but each instalment is triggered by the milestone as confirmed under your SPA through the project consultant, not by the DLD app reading.
No. The May 2026 hero image is an Emaar project rendering of the planned palm-lined promenade, fountains and pedestrian plaza, not a photograph of the site. The record of physical progress for that month is the RERA report of 4 May 2026, whose inspection photographs show the concrete frame rising with climbing screens near the upper floors, a podium parking ramp with finished screed and lighting, and an interior with ducting, pipework and blockwork in place; those photographs belong to the official record and are not reproduced here.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the May 2026 inspection record for Address Residences at Dubai Creek Harbour correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.