AEON at Dubai Creek Harbour by Emaar Properties waterfront residential towers with landscaped promenade, palm trees and water features in Dubai Presented by Tohid Fetrat

Emaar · Dubai Creek Harbour · Construction Update

AEON at Dubai Creek Harbour Construction Update - June 2026

June 2026 Inspection Places AEON at 77.91% Construction Progress in Dubai Creek Harbour

Facade, MEP, internal finishing and external works are progressing together at AEON, and the 24 June 2026 RERA inspection places the project at 77.91 percent.

Direct advisor access. Every message answered personally, never by a call center.

77.91%Construction Progress
24 June 2026Inspection Date
Q2 2028Expected Completion
2882DLD Project Number

Verified DLD Inspection Data

AEON at Dubai Creek Harbour Construction Snapshot

A 14.36 point rise since the 23 March 2026 inspection carries AEON past 70% and into the finishing band, where the buyer's question shifts from whether the towers will rise to how the final instalments and handover paperwork line up.

Project Name

AEON at Dubai Creek Harbour

Project Number

2882

Project Status

Active

Construction Progress

77.91%

Inspection Date

24 June 2026

Construction Start

09 May 2024

Total Units

262 residential units

Total Built Area

27,701.49 sq m

Expected Completion

Q2 2028

Data source: RERA inspection conducted on 24 June 2026, tracked against DLD inspection records for project 2882; the Independent Progress Monitoring Report for that date is marked independently inspected and progress audited for RERA. The previous inspection figure of 63.55% shown in the register matches the dated 23 March 2026 reading. The hero image is a project image, not progress evidence, and no image on this page is a RERA inspection photograph. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: September 2026.

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

This Inspection Cycle

AEON at Dubai Creek Harbour Construction Progress Summary

Between the 23 March and 24 June 2026 inspections, AEON moved from 63.55% to 77.91%, a gain of 14.36 points in 93 days. Because both readings are dated, this is a measured pace of about 4.7 points a month across that quarter, a record of what happened rather than a forecast. The June report repeats the March finding that enabling, foundation and structure works are completed, so the quarter's gain was logged while the open work was envelope, building systems, finishes and external works.

Completed
  • Enabling and foundation works across plot 186
  • Concrete structure of both towers, recorded as completed in March and again in June
  • Podium levels beneath Tower 1 and Tower 2
In Progress at 77.91%
  • External envelope on the 20 floor and 11 floor towers
  • MEP installation: mechanical, electrical and plumbing
  • Internal finishes and internal works across 262 apartments
  • External works on plot 186 beside the central plaza
Ahead of Handover
  • The 80% and 100% construction levels in the launch payment plan
  • Further RERA inspection cycles and building completion certificate procedures
  • Handover in Q2 2028, the expected completion quarter
Next inspectionRecorded in the DLD register after the next RERA site visit and published as the September 2026 update page.
Completion targetQ2 2028 expected completion, about 21 to 24 months after this 24 June 2026 inspection.
Remaining distance22.09 percentage points separate the June 2026 reading from 100%.

Payment Linked Progress

What 77.91% Progress Means for AEON Buyers

The AEON launch plan ties its 5th to 9th instalments to construction levels of 20%, 40%, 60%, 80% and 100%, so the 24 June 2026 reading of 77.91% sits above the 60% level and 2.09 points below the 80% level linked to the 8th instalment. In the finishing band, four checks matter most.

Before Any Remaining Instalment

Verify the escrow account

The last AEON instalments belong only in the DLD regulated escrow account for project 2882, held with Emirates NBD. AEON escrow account verification comes before any transfer; checking it takes about two minutes against the official DLD project record.

Before the Handover Notice

Reread your SPA milestone schedule

With the register above 60% and closing on 80%, check how your sale and purchase agreement defines construction linked instalments, the completion notice and the handover notice period, and set those clauses against the Q2 2028 expected completion. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the RERA inspection record.

Booking Window Open

Book the snagging window

At 77.91% AEON is in its finishing works, so a pre handover inspection can be reserved now and dated once Emaar issues the handover notice ahead of the Q2 2028 expected completion. The AEON at Dubai Creek Harbour snagging inspection guide covers what is checked before acceptance.

Every Cycle

Track the remaining cycles

22.09 points remain between the June 2026 reading and 100%, with completion expected in Q2 2028. The AEON at Dubai Creek Harbour construction updates hub sets each dated reading beside the one before it.

General framework, not legal advice: instalment triggers, completion notices and handover notice periods are defined by your individual SPA and the DLD record, and both should be read directly.

Buying at 77.91%?

Entering AEON in its finishing band gives up most of the launch payment runway in exchange for a clearer picture: structure works are recorded as completed, the open work is envelope, MEP and finishes, and the decision narrows to the few units still available. Every payment goes to the DLD-registered escrow account for project 2882, released against construction progress audited for RERA.

Entering Now at 77.91%
  • Structure works recorded as completed in the 24 June 2026 inspection report
  • Q2 2028 expected handover, under two years from this reading
  • A 90/10 launch plan with 10% linked to completion; Emaar confirms your own schedule at booking
Typical Launch Entry
  • Construction risk carried through every stage from excavation
  • Several years between booking and keys
  • Instalments spread over a longer runway at launch prices
AED 1.71M ≈ USD 466KStarting Price
90/10 Plan10% Due on Completion
Q2 2028Expected Handover
Ask What Is Available at AEON

3 units listed available on the project page at publication; availability shifts between cycles.

About the Development

AEON at Dubai Creek Harbour Project Details

AEON at Dubai Creek Harbour by Emaar Properties residential towers with tree lined boulevard, illuminated facades, landscaped greenery and evening city setting in Dubai Presented by Tohid Fetrat
Dubai Creek Harbour · Emaar

At 77.91% in June 2026, AEON is a finishing stage Emaar development: 262 one to three bedroom apartments across a 20 floor and an 11 floor tower beside the Creek Beach central plaza. Starting prices: AED 1.71M ≈ USD 466K.

For a buyer entering at this reading, the trade off is a short remaining instalment runway on the 90/10 plan against a build already into envelope, MEP and finishing works, with handover expected in Q2 2028.

AEON at Dubai Creek Harbour Project Guide

Site Context This Cycle

Explore AEON at Dubai Creek Harbour Location on Dubai Map

On plot 186 in Al Khairan First, AEON stands beside the Creek Beach central plaza, with outlooks the project documents describe toward the Dubai Creek Canal, parks and the city skyline. In a finishing cycle that position shows up on site: the external envelope that frames those outlooks is among the works the June report lists as progressing, alongside the external works around the two towers.

Creek Beach is planned as a low traffic district of shaded walkways, a cycling track, a skate park and sports courts, with an RTA ferry terminal in the district plan, and Emaar's brochure puts AEON about 10 minutes by car from Burj Khalifa and 15 from Dubai International Airport. For buyers timing a move or a first tenancy around the Q2 2028 handover, the documents promise metro connectivity without naming a line or an operating station, so road and water links are the ones to plan around today. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view AEON at Dubai Creek Harbour by Emaar on Dubai Map

Buyer Resources for This Project

Investing in AEON During Finishing Works

In the finishing band, AEON buyers are tracking the build, settling the last construction linked instalments into escrow, lining up residency paperwork and planning the apartment inspection before acceptance. Each resource below is matched to where AEON stood in June 2026.

AEON at Dubai Creek Harbour by Emaar Properties waterfront residential towers with landscaped promenade, palm trees and water features in Dubai Presented by Tohid Fetrat
You Are Here

AEON Construction Updates

This page: the 24 June 2026 DLD register reading for AEON, with measured pace since March.

AEON at Dubai Creek Harbour by Emaar Properties residential towers with evening boulevard view, landscaped greenery and Golden Visa residency by investment graphic in Dubai Presented by Tohid Fetrat

AEON Golden Visa: 2 and 3 Bedroom Apartments Clear the Threshold

AEON at Dubai Creek Harbour by Emaar Properties qualifies at 2 and 3 bedrooms; 1 bedroom apartments stay below AED 2M.

Read the AEON Golden Visa Guide
AEON at Dubai Creek Harbour by Emaar Properties pool deck with landscaped surroundings, security shield, lock icon and residential tower facade in Dubai Presented by Tohid Fetrat

AEON Escrow Account: Emirates NBD and DLD Project 2882 at Creek Beach

AEON at Dubai Creek Harbour, DLD project 2882, escrows 262 units at Emirates NBD Bank and read 90.04% in September 2026.

Verify the AEON Escrow Account
AEON at Dubai Creek Harbour snagging inspection showing a modern bedroom interior with balcony access and natural light, Presented by Tohid Fetrat

AEON Snagging: Panoramic Balconies, Glazing and Water Pressure on Upper Levels

AEON at Dubai Creek Harbour has 262 Emaar Properties residences in two towers; the inspection checks glazing, balconies, joinery and services.

Book the AEON Snagging Inspection

Update Timeline

Other AEON Construction Updates

Each AEON inspection on this site keeps its own dated page: the March 2026 reading comes before this one, and the September 2026 page follows it, reading by reading.

All AEON Construction Updates

FAQs

AEON at Dubai Creek Harbour Construction Progress in June 2026: Frequently Asked Questions

As of the RERA inspection conducted on 24 June 2026, AEON at Dubai Creek Harbour stands at 77.91% construction progress in the DLD register for project 2882, and the Independent Progress Monitoring Report for that date records the main contract as progressing. The DLD app logs seven RERA inspection photographs against this inspection; they belong to the official record and are not reproduced here.

AEON rose from 63.55% on 23 March 2026 to 77.91% on 24 June 2026, a gain of 14.36 percentage points in 93 days. Because both readings carry dates, that works out to a measured pace of about 4.7 points a month over the quarter; it describes the period already recorded and is not a projection of future readings.

Expected completion remains Q2 2028 as of this update, and the 24 June 2026 report again records enabling, foundation and structure works as completed with the main contract progressing. At 77.91%, 22.09 percentage points remain to 100%; the register reading does not by itself move the expected completion date, which stays Q2 2028 until a revision is recorded. How inspection cycles lead to completion certification is covered on the AEON at Dubai Creek Harbour construction updates hub.

It could. An expected completion date is not fixed by a single inspection and can be revised in either direction between cycles; the Q2 2028 figure here is the position as of this June 2026 update. The launch payment plan also dates its final 100% completion instalment April 2028 and marks that date as an estimate, so any change would be reported in a later dated AEON update.

The Independent Progress Monitoring Report dated 24 June 2026 states that enabling, foundation and structure works were completed, and that external works, internal finishes, external envelope, MEP and internal works were progressing at different stages. That wording matches the March 2026 report, so the 14.36 point gain between the two was recorded inside the same finishing packages on Tower 1 (ground, podium, 20 floors and roof) and Tower 2 (ground, podium, 11 floors and roof).

At 77.91% on 24 June 2026, AEON sits above the 60% construction level that the launch payment plan links to the 7th instalment, estimated for December 2026, and 2.09 points below the 80% level linked to the 8th, estimated for June 2027. Those calendar dates are the plan's estimates; under the SPA, construction linked instalments follow the construction milestone, so each buyer's own statement from Emaar shows what falls due.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the June 2026 inspection record for AEON at Dubai Creek Harbour correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts