Emaar · Dubai Creek Harbour
AEON at Dubai Creek Harbour Construction Updates
The Dated RERA Record of a 20 Floor and an 11 Floor Tower at Creek Beach
AEON at Dubai Creek Harbour reached 90.04% at its 14 September 2026 RERA inspection, leaving 9.96 points to close across both Creek Beach towers before handover.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
AEON at Dubai Creek Harbour at a Glance
AEON at Dubai Creek Harbour is Emaar's 262-apartment project on plot 186 of Al Khairan First in the Creek Beach district, registered with the Dubai Land Department as project 2882 on 10 January 2024 and started on 09 May 2024. Its two towers are unequal, Tower 1 carrying 20 floors and Tower 2 carrying 11 above their ground and podium levels, yet the register publishes one progress figure for both: 90.04% at the 14 September 2026 inspection, just over 28 months after the start. The completion card below shows the expected Q2 2028 quarter.
2882
Active
09 May 2024
262 residential units
27,701.49 sq m
Q2 2028 (developer handover)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
AEON at Dubai Creek Harbour Construction Update Timeline
AEON's dated record is compact: three RERA inspections inside 175 days of 2026, reading 63.55% on 23 March, 77.91% on 24 June and 90.04% on 14 September. Before them, the register view for the March inspection shows a previous figure of 50.21% with no date attached, so it sits on the track below as a previous inspection marker only and has no row in the table. Each row links the dated monthly update written for that inspection.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| September 2026 | 90.04% | 14 September 2026 | View the September 2026 update |
| June 2026 | 77.91% | 24 June 2026 | View the June 2026 update |
| March 2026 | 63.55% | 23 March 2026 | View the March 2026 update |
Pace Analysis
How Fast AEON at Dubai Creek Harbour Has Been Built
Three dated readings give AEON two measured intervals; the undated 50.21% previous figure is left out of every rate. The third line is a labelled arithmetic average from the construction start, not a measured interval:
- Mar 2026 to Jun 2026: facade, MEP and fit-out, 63.55% to 77.91%About 4.7 points per month
- Jun 2026 to Sep 2026: advanced finishing, 77.91% to 90.04%About 4.5 points per month
- May 2024 start to Sep 2026: arithmetic average from an assumed 0% to 90.04%About 3.2 points per month
The two measured quarters barely differ, and across the full 175 days from 23 March to 14 September 2026 the rate works out at about 4.6 points a month, with only a slight easing from the first quarter to the second. The contrast sits against the start: 63.55 points over the 683 days from the 09 May 2024 start to the March inspection average about 2.8 a month, so the 2026 cycles, logged after the frames of both towers were recorded as completed, moved the register faster than the build's own long-run average. The percentage is now being carried by envelope, MEP, finishing and external works across the taller 20 floor tower and its 11 floor neighbour rather than by concrete. For an end user timing a move, or an investor weighing entry at this reading, that is a record of steady recorded progress and not a forecast: 9.96 points remain as arithmetic, and the expected completion remains Q2 2028 unless a later record revises it.
Get the Next Inspection Figure First
Tell me you are tracking AEON at Dubai Creek Harbour and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About AEON at Dubai Creek Harbour
A 90.04% reading describes two towers and 262 apartments; the project guide covers what those apartments are, where they sit and how they are priced:

AEON at Creek Beach: Two Towers Beside the Central Plaza
AEON at Dubai Creek Harbour pairs two Emaar Properties towers at Creek Beach, 262 residences of 1, 2 and 3 bedrooms.
View the AEON at Dubai Creek Harbour Project GuideConsidering an Entry Above 90%?
Choice at AEON narrows as the build works through its final points, and what is still open differs by tower, floor and outlook. If this record is what brought you here, ask me for current availability before the remaining options thin out further.
Ask About Remaining Availability on WhatsAppStage Record
AEON at Dubai Creek Harbour Build Stages, Mapped to the Inspections
Each stage below is pinned to the window it occupied in AEON's own record. The first two predate the earliest dated reading, so their windows run from the 09 May 2024 start to the 23 March 2026 report that first lists them as completed.
Enabling and Foundation Works
From the 09 May 2024 start on plot 186, enabling and foundation works for both towers ran first; the 23 March 2026 report records them as completed.
Concrete Frames of Both Towers
Tower 1 rose to 20 floors and Tower 2 to 11 above their ground and podium levels; the undated 50.21% previous figure falls in this window, and structure works are recorded as completed by 23 March 2026.
Envelope, MEP and Finishes Under Way
The 23 March 2026 inspection recorded 63.55%, with external envelope, MEP, internal finishes, internal works and external works progressing at different stages on both towers.
Facade and Fit-Out Quarter
The quarter to 24 June 2026 added 14.36 points in 93 days, about 4.7 a month, taking AEON to 77.91% with the same open packages still reported at different stages.
Advanced Finishing Toward Handover
By 14 September 2026 AEON read 90.04%, structure substantially completed and every open package at advanced stages; no completion certificate is recorded, and handover is expected in Q2 2028.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on AEON at Dubai Creek Harbour's own record.
Buyer Position
Tracking Your Position at AEON at Dubai Creek Harbour
This page is one of four project resources that together cover a AEON at Dubai Creek Harbour purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

AEON at Dubai Creek Harbour Construction Updates
This page: every dated AEON register reading, 63.55% in March to 90.04% in September 2026.

AEON Golden Visa: 2 and 3 Bedroom Apartments Clear the Threshold
AEON at Dubai Creek Harbour by Emaar Properties qualifies at 2 and 3 bedrooms; 1 bedroom apartments stay below AED 2M.
Read the AEON at Dubai Creek Harbour Golden Visa Guide
AEON Escrow Account: Emirates NBD and DLD Project 2882 at Creek Beach
AEON at Dubai Creek Harbour, DLD project 2882, escrows 262 units at Emirates NBD Bank and read 90.04% in September 2026.
Verify the AEON at Dubai Creek Harbour Escrow Account
AEON Snagging: Panoramic Balconies, Glazing and Water Pressure on Upper Levels
AEON at Dubai Creek Harbour has 262 Emaar Properties residences in two towers; the inspection checks glazing, balconies, joinery and services.
Book AEON at Dubai Creek Harbour SnaggingApproaching Handover
Between 90.04% and Handover: What AEON at Dubai Creek Harbour Buyers Should Do Now
At 90.04% on 14 September 2026, the 9.96 points still open at AEON sit in envelope, MEP, finishing and external works that the September report places at advanced stages, and every construction-linked instalment in the launch plan except the last is tied to a level the register has already passed. Emaar's handover notice, once issued, sets its own timetable for the completion payment and documents, so the three steps below belong in the remaining inspection cycles, not in the weeks after that notice arrives.
First, arrange independent snagging so defects in your AEON apartment are documented before you accept it: no handover notice is on the record yet and handover is expected in Q2 2028, so an inspector can be lined up well ahead and given a date once Emaar issues that notice. The AEON apartment snagging guide covers the timing and what gets inspected across both towers.
Second, set your Emaar statement against the register and route anything still due only to the account named on the AEON escrow account page: the launch plan dates its 60% and 80% instalments December 2026 and June 2027 as estimates, but under the SPA they follow the construction milestone, the readings passed those levels by 23 March 2026 (63.55%) and 14 September 2026 (90.04%), and the Emirates NBD trust account for project 2882 releases funds against that progress.
Third, if residency matters, work through the AEON Golden Visa guide before completion: 2 and 3 bedroom starting prices of AED 2.69M ≈ USD 732K and AED 3.62M ≈ USD 986K clear the AED 2M ≈ USD 545K threshold, the 1 bedroom from AED 1.71M ≈ USD 466K does not, and the title deed issued at handover shapes the application route.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore Dubai Creek Harbour Structure
Two towers at 90.04% are one plot in a much larger build. These three pages place AEON's record inside its market, its master community and its developer's delivery history:

Dubai Creek Harbour Properties for Sale
Explore Emaar apartments, townhouses, villas and penthouses in Dubai Creek Harbour, comparing property prices, payment plans and handover dates.
See Dubai Creek Harbour Properties for Sale
Dubai Creek Harbour: Emaar's Waterfront City With a Marina and Urban Beach
Dubai Creek Harbour is Emaar's waterfront city between Downtown Dubai and the Creek, planned for 48,500 homes with skyline views.
Explore the Dubai Creek Harbour Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
AEON at Dubai Creek Harbour Construction Updates Frequently Asked Questions
AEON at Dubai Creek Harbour is an active DLD-registered project (number 2882) at 90.04% construction progress as of the RERA inspection of 14 September 2026, with structure works recorded as substantially completed while envelope, MEP, finishing and external works progress at advanced stages. Nothing is yet recorded as complete or handed over; every reading sits in the inspection timeline above.
The 14 September 2026 inspection recorded 90.04% for AEON at Dubai Creek Harbour, up 12.13 points from the 77.91% reading of 24 June 2026 and the first AEON figure above 90%. The dated report for that cycle is the AEON September 2026 construction update.
AEON at Dubai Creek Harbour is expected to complete in Q2 2028; its latest inspection, on 14 September 2026, recorded 90.04%, leaving 9.96 points to 100% as simple arithmetic rather than a delivery date. The launch payment plan dates its final instalment, linked to 100% construction completion, April 2028, a date the plan itself labels an estimated construction completion date, and this page's record is updated as later inspections, including the closing one, are recorded.
The DLD register lists 262 residential units for AEON at Dubai Creek Harbour (project 2882), all one to three bedroom apartments, held in Tower 1 (ground, podium, 20 floors and roof) and Tower 2 (ground, podium, 11 floors and roof), the configuration described in every monitoring report from 23 March to 14 September 2026.
Between dated inspections, AEON at Dubai Creek Harbour moved at about 4.7 percentage points per month from 23 March to 24 June 2026 and about 4.5 from 24 June to 14 September 2026, or about 4.6 across the 175 days from 63.55% to 90.04%. As arithmetic only, 90.04 points over the 858 days since the 09 May 2024 start average about 3.2 a month, assuming 0% at the start; these rates describe recorded progress, not a forecast. The full breakdown is in the pace analysis above.
Construction at AEON at Dubai Creek Harbour started on 09 May 2024, about four months after the project was registered with the Dubai Land Department on 10 January 2024. The first dated reading in this record is 63.55% on 23 March 2026, covered in the AEON March 2026 construction update; the register view for that inspection also shows an undated previous figure of 50.21%.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the AEON at Dubai Creek Harbour construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.