March 2026 Inspection Records AEON at 63.55% Construction Progress in Dubai Creek Harbour
External envelope, MEP and internal finishes now run across both AEON towers, with structure works recorded as completed at the 23 March 2026 RERA inspection.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
AEON at Dubai Creek Harbour Construction Snapshot
A 13.34 point rise over the previous DLD inspection takes AEON past the midpoint and into the envelope and MEP band, the stage where buyers check construction linked instalments against the register rather than the calendar.
AEON at Dubai Creek Harbour
2882
Active
63.55%
23 March 2026
09 May 2024
262 residential units
27,701.49 sq m
Q2 2028
Data source: RERA inspection conducted on 23 March 2026, tracked against DLD inspection records for project 2882; the Independent Progress Monitoring Report for that date is marked independently inspected and progress audited for RERA. The previous inspection figure appears in the register without a date. Page images are project imagery, not the RERA inspection photographs. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: September 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
AEON at Dubai Creek Harbour Construction Progress Summary
The DLD register places AEON at 50.21% at its previous inspection and at 63.55% on 23 March 2026, a gain of 13.34 points. Because the earlier reading carries no date in the register view, this page states the gain without a monthly pace. What the March report adds is the shape of the work: the concrete structure is finished, and the envelope, building systems, finishes and external works now run in parallel on two towers of very different height.
- Enabling works on plot 186
- Foundation works for both residential towers
- Structure works for Tower 1 (G + P + 20 + R) and Tower 2 (G + P + 11 + R)
- External envelope on both towers
- MEP works: mechanical, electrical and plumbing systems
- Internal finishes and internal works for the 262 residential units
- External works around the Creek Beach plot
- Remaining RERA inspection cycles toward 100%
- Building completion certificate procedures
- Handover, expected in Q2 2028
Payment Linked Progress
What 63.55% Progress Means for AEON Buyers
The AEON launch plan links its later instalments to construction levels of 20%, 40%, 60%, 80% and 100%, so a register reading of 63.55% is more than a status line: it sits above the 60% level tied to the 7th instalment. At this point in the build, four checks matter most.
Verify the escrow account
Every remaining AEON instalment should go only to the DLD regulated escrow account registered for project 2882 with Emirates NBD. AEON escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA milestone schedule
The launch plan dates the 60% instalment at an estimated December 2026, yet the March reading already sits above that level. Check how your sale and purchase agreement defines construction linked instalments, then confirm your own statement with Emaar. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the RERA inspection record.
Plan the snagging inspection
At 63.55% with handover expected in Q2 2028, the AEON inspection window is not open yet; it opens once Emaar issues your handover notice. AEON snagging inspection guide sets out the checks to plan before acceptance.
Track the remaining cycles
36.45 points separate the March 2026 reading from 100%, with completion expected in Q2 2028. AEON at Dubai Creek Harbour construction updates keep every dated reading in one sequence.
General framework, not legal advice: milestone definitions, instalment triggers, and notice periods are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 63.55%?
Entering AEON after its structure works are recorded as completed trades part of the launch runway for a clearer risk picture: the frame is standing, the open work is envelope, systems and finishes, and the choice narrows to the units still available. Every payment goes to the DLD-registered escrow account for project 2882, released against construction progress audited for RERA.
- Structure works recorded as completed in the 23 March 2026 inspection report
- About two years to the expected Q2 2028 handover
- The 90/10 launch plan leaves 10% for completion; your own schedule is confirmed by Emaar at booking
- Every construction risk still ahead, from ground works to handover
- A delivery horizon measured in years rather than cycles
- A longer instalment runway at launch pricing
3 units listed available on the project page at publication; availability shifts between cycles.
About the Development
AEON at Dubai Creek Harbour Project Details

With its structure works recorded as completed in March 2026, AEON is a two tower Emaar development of 262 one to three bedroom apartments beside the Creek Beach central plaza, now in its envelope and MEP phase. Starting prices: AED 1.71M ≈ USD 466K.
For a buyer entering at 63.55%, the trade off is a later position in a 90/10 plan against a build whose concrete frame is already in place, with handover expected in Q2 2028.
AEON at Dubai Creek Harbour Project GuideSite Context This Cycle
Explore AEON at Dubai Creek Harbour Location on Dubai Map
AEON occupies plot 186 in Al Khairan First, inside the Creek Beach district of Dubai Creek Harbour and directly beside the district's central plaza. Tower 1 rises to 20 floors above ground and podium while Tower 2 stops at 11, so the envelope and MEP packages recorded in this cycle are being carried up two very different heights at once, which fits the March report's note that these works are progressing at different stages.
Dubai Creek Harbour is a partly delivered master community: finished Emaar phases already sit beside plots still under construction, inside a 7.4 million sqm plan that sets aside 500,000 sqm for parks and open spaces. Emaar's brochure puts AEON about 10 minutes by car from Burj Khalifa and 15 from Dubai International Airport, and names an RTA ferry terminal and a water taxi to Downtown Dubai in the district plan; the project documents promise metro connectivity without naming a line or an operating station, so buyers planning rentals around the Q2 2028 handover should weigh road and water access first. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in AEON During Envelope and MEP Works
Mid construction is when the dated readings, residency eligibility and payment protection deserve a second look, because most of the AEON price is already committed to the construction schedule, while the handover inspection is the next stage to plan. Each resource below is matched to where AEON stood in March 2026.

AEON Construction Updates
This page: the 23 March 2026 DLD register reading for AEON, with ledger and buyer checks.

AEON Golden Visa: 2 and 3 Bedroom Apartments Clear the Threshold
AEON at Dubai Creek Harbour by Emaar Properties qualifies at 2 and 3 bedrooms; 1 bedroom apartments stay below AED 2M.
Read the AEON Golden Visa Guide
AEON Escrow Account: Emirates NBD and DLD Project 2882 at Creek Beach
AEON at Dubai Creek Harbour, DLD project 2882, escrows 262 units at Emirates NBD Bank and read 90.04% in September 2026.
Verify the AEON Escrow Account
AEON Snagging: Panoramic Balconies, Glazing and Water Pressure on Upper Levels
AEON at Dubai Creek Harbour has 262 Emaar Properties residences in two towers; the inspection checks glazing, balconies, joinery and services.
Read the AEON Snagging Inspection GuideUpdate Timeline
Other AEON Construction Updates
The AEON inspection record on this site opens with the 23 March 2026 reading; each later inspection is published as its own dated update, reading by reading.
All AEON Construction UpdatesWhere This Update Fits
Explore AEON at Dubai Creek Harbour Structure
Read the March 2026 reading against three wider references: competing Dubai Creek Harbour listings, the master community taking shape around the Creek Beach district, and the delivery history of Emaar itself.

Dubai Creek Harbour Properties for Sale
Explore Emaar apartments, townhouses, villas and penthouses in Dubai Creek Harbour, comparing property prices, payment plans and handover dates.
See Dubai Creek Harbour Properties for Sale
Dubai Creek Harbour: Emaar's Waterfront City With a Marina and Urban Beach
Dubai Creek Harbour is Emaar's waterfront city between Downtown Dubai and the Creek, planned for 48,500 homes with skyline views.
Explore the Dubai Creek Harbour Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileFAQs
AEON at Dubai Creek Harbour Construction Progress in March 2026: Frequently Asked Questions
As of the RERA inspection conducted on 23 March 2026, AEON at Dubai Creek Harbour stands at 63.55% construction progress in the DLD register for project 2882, with the main contract recorded as progressing. The same inspection is logged in the DLD app with nine RERA inspection photographs, which form part of the official record rather than this page.
The DLD register view for the 23 March 2026 inspection shows 50.21% at the previous inspection and 63.55% at this one, a gain of 13.34 percentage points. That view does not show the date of the earlier inspection, so no monthly pace can be derived from the pair.
Expected completion stands at Q2 2028 as of this update, and the 23 March 2026 report records the structure works as completed with the main contract progressing; 36.45 percentage points remain to 100%. As simple arithmetic only, 63.55 points over the 683 days since the 09 May 2024 construction start averages about 2.8 points a month, assuming 0% at the start; it is neither a measured pace nor a forecast. How inspection cycles and completion certification work is covered on the AEON at Dubai Creek Harbour construction updates hub.
Yes. Expected completion dates can be revised between inspection cycles, and the Q2 2028 date shown here reflects the position as of this March 2026 update. Any revision would appear in a later dated AEON update rather than being edited into this record.
The Independent Progress Monitoring Report dated 23 March 2026 states that enabling, foundation and structure works were completed, and that external works, internal finishes, external envelope, MEP and internal works were progressing at different stages. The report covers both towers, Tower 1 (ground, podium, 20 floors and roof) and Tower 2 (ground, podium, 11 floors and roof), which together hold 262 residential units.
At 63.55%, the 23 March 2026 reading sits above the 20%, 40% and 60% construction completion levels that the AEON launch payment plan links to its 5th, 6th and 7th instalments, and below the 80% level linked to the 8th. The plan dates those four instalments October 2025, May 2026, December 2026 and June 2027, each marked as an estimated construction completion date. Under the SPA, construction linked instalments follow the construction milestone, so each buyer's own statement from Emaar is the reference for what falls due.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the March 2026 inspection record for AEON at Dubai Creek Harbour correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.