Imtiaz Developments · Island A, Dubai Islands · Construction Update

Beach Walk Grand Construction Update - August 2026

August 2026 DLD Register Reading Places Beach Walk Grand at 53.22% Construction Progress on Dubai Islands

Superstructure, internal works, finishes and MEP were progressing when inspectors visited Beach Walk Grand on 10 August 2026; the background image is a developer rendering.

Direct advisor access. Every message answered personally, never by a call center.

53.22%DLD Register Reading
10 August 2026Inspection Date
Q4 2026Expected Completion
3367DLD Project Number

DLD Register Inspection Data

Beach Walk Grand Construction Snapshot

53.22% in the DLD project register on 10 August 2026 places Beach Walk Grand in the mid-construction band, where the frame and the building systems advance together and buyers weigh a dated payment plan against recorded progress.

Project Name

Beach Walk Grand by Imtiaz

Project Number

3367

Project Status

Active

Construction Progress

53.22%

Inspection Date

10 August 2026

Construction Start

25 December 2024

Total Units

112 residences

Total Built Area

13,314.49 sq m

Expected Completion

Q4 2026

Data source: Dubai Land Department project register reading for project 3367 dated 10 August 2026, read with the RERA Independent Progress Monitoring Report for the same inspection, which records stage notes and prints no percentage. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. The image at the top of this page is a developer rendering of the planned building, not a site photograph. Last updated: August 2026.

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

This Inspection Cycle

Beach Walk Grand Construction Progress Summary

The Dubai Land Department project register shows Beach Walk Grand at 53.22% on 10 August 2026, 8.57 points above the previous inspection reading of 44.65%; the register app shows no date for that earlier reading, so the gap cannot be turned into a monthly pace. What the inspection notes add is the shape of the work: everything below ground is recorded as complete, and the remaining effort sits in the frame and the trades inside it.

Completed
  • Enabling works on the Island A plot
  • Piling and foundation works
  • Substructure works beneath the ground level
In Progress at 53.22%
  • Superstructure of the G+2P+12+R residential building
  • Internal works inside the building
  • Internal finishes
  • MEP works: mechanical, electrical, and plumbing systems
Ahead of Handover
  • Remaining DLD register readings toward 100%
  • Furnished handover of all 112 residences
  • Handover expected in Q4 2026, against a registered completion date of 25 December 2026
Next inspectionAdded to the DLD project register after the next RERA site visit; the record carries no date for it, and this page reports the 10 August 2026 reading.
Completion targetHandover expected in Q4 2026; the registered completion date in the DLD record is 25 December 2026, 137 days after this inspection.
Remaining distance46.78 percentage points separate the August 2026 reading from 100%.
Pace arithmetic53.22 points over the 593 days since the 25 December 2024 start averages about 2.69 points per month; reaching 100% by 25 December 2026 would take about 10.24 points per month over the remaining 137 days. This is arithmetic, not a forecast.

Payments and Progress

What 53.22% Progress Means for Beach Walk Grand Buyers

Beach Walk Grand runs on a dated 60/40 plan, not on construction milestones: six dated payments totalling 60% of the price had fallen due by 15 July 2026, while the register read 53.22% on 10 August 2026. Read side by side, that is timing arithmetic, and it frames the four actions that matter at this mid-construction stage.

Before Any Transfer

Verify the escrow account

Any payment toward Beach Walk Grand should go only to the DLD regulated escrow account held with First Abu Dhabi Bank (FAB) for project 3367. Beach Walk Grand escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.

Before Signing

Reread your SPA payment schedule

Check how your sale and purchase agreement records the dated instalments already due, the 40% due on completion, and the handover notice period, and map those clauses against the Q4 2026 handover.

After Reservation

Confirm your Oqood registration

Off plan sales in Dubai are recorded on Oqood, the DLD interim register, and your unit should appear there against project 3367 once the reservation is processed. With 40% still due on completion, that registration is what ties your contract to the record this page follows.

Every Cycle

Track the remaining readings

46.78 points separate the August 2026 reading from 100%, and each new register figure is logged on the Beach Walk Grand construction updates hub as it is published.

General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.

Buying at 53.22%?

Entering mid-construction trades the long instalment runway of a launch for a shorter wait: the substructure is recorded complete, a furnished handover is expected in Q4 2026, and buyers entering now settle the instalments already due at signing, per the developer's current terms; confirm the schedule with the developer. Every payment goes to the DLD-registered escrow account for project 3367, released against construction progress recorded in the DLD register.

Entering Now at 53.22%
  • Below-ground works recorded complete in the 10 August 2026 inspection notes
  • Handover expected in Q4 2026, a wait measured in months
  • 60% of the 60/40 plan already due by date, 40% on completion
Typical Launch Entry
  • Construction risk carried from excavation through to handover
  • A multi-year wait is the usual delivery horizon at launch
  • Instalments spread across the build at launch pricing
AED 2.10M ≈ USD 572KStarting Price
60/40 Plan40% Due on Completion
Q4 2026Expected Handover
Ask What Is Available at Beach Walk Grand

Limited Units Available on the project page as of this update; availability shifts between cycles.

About the Development

Beach Walk Grand Project Details

Beach Walk Grand by Imtiaz in Island A at Dubai Islands residential tower with layered balconies facing the waterfront at sunset in Dubai - Presented by Tohid Fetrat
Island A, Dubai Islands · Imtiaz Developments

With its substructure recorded complete and the superstructure still progressing in August 2026, Beach Walk Grand is a mid-construction single building of 112 fully furnished 1 and 2 bedroom apartments and 3 bedroom penthouses on Island A. Starting prices: AED 2.10M ≈ USD 572K.

For buyers entering at this stage, the trade off is a short wait to a furnished handover, expected in Q4 2026, against settling at signing the dated instalments that have already fallen due under the developer's current terms.

Beach Walk Grand by Imtiaz Project Guide

Site Context This Cycle

Explore Beach Walk Grand Location on Dubai Map

Beach Walk Grand rises on Island A at Dubai Islands, on a plot the developer describes as moments from the beach, as a single G+2P+12+R building rather than a multi-tower phase. That shapes this cycle's record: with one structure on site, the August 2026 notes show superstructure, internal works, finishes and MEP progressing in the same building at the same time, rather than spread across separate blocks.

Dubai Islands is still a district in the making, with the Infinity Bridge about 5 minutes and Dubai International Airport about 12 minutes away by car, according to the developer, so buyers planning to live in or let a furnished unit after the Q4 2026 handover are buying into surroundings that are still being completed around them. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Beach Walk Grand by Imtiaz on Dubai Map

Buyer Resources for This Project

Investing in Beach Walk Grand During Mid-Construction Progress

At mid-construction, with most of the dated plan already called, the open questions are residency eligibility and where each payment is held. The cards below route each one to its dedicated Beach Walk Grand guide.

Beach Walk Grand by Imtiaz in Island A at Dubai Islands construction updates cover image featuring an aerial project rendering of the residential building within landscaped coastal surroundings in Dubai - Presented by Tohid Fetrat
You Are Here

Beach Walk Grand Construction Updates

This page: Beach Walk Grand's August 2026 register reading, inspection notes and pace arithmetic.

Beach Walk Grand by Imtiaz in Island A at Dubai Islands Golden Visa card graphic above an aerial project rendering with the residential building and waterfront surroundings in Dubai - Presented by Tohid Fetrat

Beach Walk Grand Golden Visa: Three Types on Dubai Islands

Imtiaz Developments' Beach Walk Grand, 112 fully furnished residences on Island A, lists all three unit types above the threshold.

Read Beach Walk Grand Golden Visa Guide
Beach Walk Grand by Imtiaz in Island A at Dubai Islands escrow account protection graphic with shield and padlock icons above a waterfront residential rendering at sunset in Dubai - Presented by Tohid Fetrat

Beach Walk Grand Escrow: Imtiaz Developments on Dubai Islands

Imtiaz Developments' Beach Walk Grand is DLD project 3367, 112 units escrowed at First Abu Dhabi Bank, 53.22% certified August 2026.

Verify Beach Walk Grand Escrow Account

Update Timeline

Other Beach Walk Grand Construction Updates

The monthly record for Beach Walk Grand starts with this August 2026 page; the hub gathers every published reading, and the next one joins it once the register updates.

All Beach Walk Grand Construction Updates

FAQs

Beach Walk Grand Construction Progress in August 2026: Frequently Asked Questions

Beach Walk Grand, DLD project 3367, stood at 53.22% in the Dubai Land Department project register on 10 August 2026. The RERA inspection report for the same date prints no percentage of its own and lists the progress status as main contract, progressing, so the 53.22% figure is the register reading shown in the DLD app.

It places just over half of Beach Walk Grand's construction on the register as of 10 August 2026, with 46.78 points still to go before 100%. Because the building runs on a date-based payment plan, 60% of the price had fallen due by 15 July 2026; one figure is set by the calendar and the other by the site, and they sit side by side here as arithmetic only.

The DLD app's inspection report card for 10 August 2026 shows 44.65% as the previous inspection reading but displays no date for it, and no other document supplied for this update dates it. Without a date, the change between the two readings cannot be converted into a monthly pace, so this page shows 44.65% as an undated marker on the progress bar rather than as a dated entry.

The RERA Independent Progress Monitoring Report for 10 August 2026 records enabling, piling, foundation and substructure works as completed, with superstructure, internal works, internal finishes and MEP works progressing at the site. It describes the project as a G+2P+12+R residential building, meaning ground, two podium parking levels, 12 residential floors and a roof level.

The DLD record lists construction start as 25 December 2024 and project registration as 30 December 2024, so the recorded start falls five days before the registration date. Both dates are shown exactly as the register prints them; the developer's payment plan separately dates the booking instalment to November 2024.

No. The image at the top of this page is a developer rendering of the planned building, used to identify the project, and it does not show the state of the site on 10 August 2026. The site's condition on that date is described only by the inspection notes and the 53.22% register reading.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the August 2026 inspection record for Beach Walk Grand correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts