
DAMAC · DAMAC Hills 2 · Construction Update
Camelia at DAMAC Hills 2 Construction Update - October 2025
October 2025 Inspection Records Camelia at DAMAC Hills 2 at 100% Construction Progress with the Completion Certificate Already Issued
Villa construction across Camelia is recorded complete, with electricity, gas and water meters connected and DAMAC's own snagging and deep cleaning programme running across the site.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Camelia at DAMAC Hills 2 Construction Snapshot
A 5.52 point rise from the previous recorded reading closes Camelia at 100%, the point where an inspection record stops forecasting a delivery and starts documenting what was built.
Camelia at DAMAC Hills 2
2548
Finished
100%
30 October 2025
1 March 2023
515 townhouses
66,448.18 sq m
30 June 2025
Data source: RERA independent progress monitoring report conducted on 30 October 2025, tracked against DLD inspection records. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: September 2026.
Want to know if anything on this record changes? Message me on WhatsApp and I will tell you directly: one message only if the record moves, nothing else. Message me on WhatsApp
The Closing Inspection
Camelia at DAMAC Hills 2 Construction Progress Summary
The inspection carried out on 30 October 2025 records Camelia at 100%, up 5.52 points from a previous reading of 94.48% that the record carries without a date of its own. The progress status on that report is Completed, and the inspector's notes describe finished villas, connected utilities and cleaning rather than construction.
- Villa construction activities across the Camelia cluster, recorded as substantially completed
- Electricity, gas and water meter connections
- Building completion certificate issued by the Dubai Development Authority on 4 March 2025
- DAMAC's own snagging works, noted as progressing at the site
- Deep cleaning across the completed townhouses
- Independent defect documentation on the individual townhouse
- Unit level condition, which a site level record does not describe
- Registration of the townhouse in the buyer's name at the Dubai Land Department
What Completion Changes
What 100% Progress Means for Camelia Buyers
Dubai off plan payment plans tie installments to construction milestones or to handover itself, so a certified reading of 100% removes the forecasting question entirely and replaces it with a condition question. At Camelia, four checks matter now.
Verify the escrow account
Money still owed on a unit should move only through the DLD regulated escrow account registered for project 2548, which remains the correct route while that account is open. Camelia at DAMAC Hills 2 escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Check what is still payable
On a certified project the original milestone schedule reads as history; what matters is the balance outstanding on the specific townhouse and the date of the transfer appointment.
Book the snagging window
With the cluster certified and keys changing hands, the pre acceptance inspection window is open now rather than months out. Camelia at DAMAC Hills 2 snagging inspection sets out what an independent inspector records before you sign.
Read the closing record
This is the final inspection entry for project 2548, so there is no later reading to wait for before deciding. Camelia at DAMAC Hills 2 construction updates holds the full record standing behind that 100% figure.
General framework, not legal advice: balance obligations, acceptance procedures, and fee liabilities are set by your individual sale and purchase agreement and the DLD record, and both should be read directly.
Buying at 100%?
Buying after certification removes the construction question and leaves a condition question: the structure is certified, the completion certificate is issued, and the remaining choice is between the townhouses still available. Payments on this project run through the DLD-registered escrow account for project 2548, released against certified construction progress.
- Certified complete: the 30 October 2025 record is the risk picture, not a forecast
- The actual townhouse can be walked through before you commit
- No delivery wait: the completion certificate was issued on 4 March 2025
- Construction risk carried from excavation through to handover
- Two to four years of waiting is the usual delivery horizon
- Longer installment runway, priced at launch levels
Limited units available at Camelia as of this update; availability shifts as townhouses are sold.
About the Development
Camelia at DAMAC Hills 2 Project Details

With villa construction recorded complete and the building completion certificate issued on 4 March 2025, Camelia is a finished cluster of 515 three bedroom townhouses in DAMAC Hills 2, built to a single ground plus first plus roof layout. Starting prices: AED 1.70M ≈ USD 463K.
For a buyer entering now the trade off inverts: nothing is left to forecast and nothing is left to wait for, but the balance falls due on a townhouse whose condition should be documented before it is accepted.
Camelia at DAMAC Hills 2 Project GuideSite Context This Cycle
Explore Camelia at DAMAC Hills 2 Location on Dubai Map
Camelia is registered on plot 9846 in Madinat Hind 4, and it occupies that plot as a self contained block of townhouse rows rather than as one vertical site. That geometry is why the closing phase of works reads the way it does in the record: across 515 ground plus first plus roof homes, the final points were earned street by street in finishes, meter connections and external works rather than in a single structural milestone.
The surrounding community is already operating rather than emerging, with the water, sports and parkland precincts of DAMAC Hills 2 open and in use and access running off Al Qudra Road on the southern edge of the city, with no metro line serving the district. For a buyer reading the October 2025 record, that is the difference between a home that can be occupied and one that waits for its neighbourhood to arrive. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Camelia at DAMAC Hills 2 After Certified Completion
Certification moves a buyer's attention from progress to condition, protection and paperwork. Each resource below is matched to where Camelia stands right now.

Camelia at DAMAC Hills 2 Construction Updates
This page: the verified October 2025 inspection record for Camelia, from construction start to certified completion.

Camelia at DAMAC Hills 2 Golden Visa
Camelia pricing sits below the property threshold for the ten year visa; the guide explains assessment.
Read Camelia Golden Visa Guide
Camelia at DAMAC Hills 2 Escrow Account
Confirm the DLD-registered escrow account for project 2548 and what happens to it after completion.
Verify Camelia Escrow Account
Camelia at DAMAC Hills 2 Snagging Inspection
With the cluster recorded complete, document defects in your own townhouse before signing the acceptance papers.
Book Camelia Snagging InspectionUpdate Timeline
Other Camelia at DAMAC Hills 2 Construction Updates
Project 2548 was recorded Finished before a second cycle came due, so the October 2025 reading is the only monthly update published for Camelia and the closing entry in its inspection record.
Where This Update Fits
Explore Camelia at DAMAC Hills 2 Structure
This report is one node in the wider record: the community around the cluster, the developer that delivered it, and the listings competing with it.

DAMAC Hills 2 Properties for Sale
Browse villas, townhouses and selected apartments for sale in DAMAC Hills 2, with prices and payment plans.
See DAMAC Hills 2 Properties for Sale
DAMAC Hills 2 Community Overview
Read the DAMAC Hills 2 guide: a self-contained villa community with themed clusters, lifestyle zones and family amenities.
Explore the DAMAC Hills 2 Community
DAMAC Developer Profile
Explore DAMAC Properties - large-scale master communities and branded luxury towers across Dubai and beyond.
View the DAMAC Developer ProfileFAQs
Camelia at DAMAC Hills 2 Construction Progress in October 2025: Frequently Asked Questions
The RERA independent progress monitoring report dated 30 October 2025 records Camelia at 100% construction progress, with the progress status shown as Completed. In the Dubai Land Department register, project 2548, DAMAC HILLS (2) CAMELIA, carries the status Finished.
The 30 October 2025 report records a gain of 5.52 points, from a previous reading of 94.48% to 100%. That previous reading appears on the record without a date of its own, so it is quoted here as the previous reading rather than tied to a named month.
The registered completion date on the Dubai Land Department record is 30 June 2025, and the building completion certificate was issued by the Dubai Development Authority on 4 March 2025. Once a project is recorded Finished, those dates describe what happened rather than what is expected, so the completion date reads as history and not as a forecast that can slip.
The inspector recorded that all villa construction activities were substantially completed, that the building completion certificate had been issued on 4 March 2025, and that electricity, gas and water meters were connected. Snagging works and deep cleaning were noted as progressing across the site at the time of that visit.
No. The snagging and deep cleaning recorded on 30 October 2025 is DAMAC's own building level programme across the Camelia site, logged by the inspector as a site condition. It says nothing about the condition of any particular townhouse, which is documented only by an inspection of that unit before the acceptance papers are signed.
No further inspection cycle is due. Project 2548 is recorded Finished and the 30 October 2025 report is the closing entry in its inspection history, so this reading is the final one rather than a stage in a continuing series. The full record sits on the Camelia at DAMAC Hills 2 construction updates hub.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the October 2025 inspection record for Camelia at Damac Hills 2 correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.