Imtiaz · Dubai Land Residence Complex
Cove Boulevard by Imtiaz Construction Updates
The Dated Register Record of a Residences and Offices Tower in Dubai Land Residence Complex
Cove Boulevard by Imtiaz read 10.45% in the DLD register on 30 September 2026, an early record that fixes the starting line for this Dubailand residences-and-offices tower.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Cove Boulevard by Imtiaz at a Glance
Cove Boulevard by Imtiaz is one mixed-use tower holding 436 units across residences and offices in Dubai Land Residence Complex, entered in the Dubai Land Department register as project 3675 on 28 May 2025, three days after its recorded 25 May 2025 construction start. The register put it at 10.45% on 30 September 2026. What sets this record apart is the stack it is building toward: the developer brochure places office floors at Levels 1 to 13 beneath a Level 14 amenities floor and residences on Levels 15 to 30, so every early reading here measures the base of workspaces and homes at once.
3675
Active
25 May 2025
436 units across residences and offices
34,923.18 sq m
30 October 2028 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Cove Boulevard by Imtiaz Construction Update Timeline
One dated reading anchors this record so far: 10.45% in the Dubai Land Department project register on 30 September 2026, recorded 493 days into a build the register dates from 25 May 2025. The register also lists an earlier 5.9% but shows no date for it, so that figure sits on the track below as an unlabelled dot rather than a table row, and the 4.55 point gap between the two is noted here once with that caveat. Each dated reading that follows becomes a new row linked to its monthly update; the September 2026 entry is illustrated with a developer rendering, not a site photograph.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| September 2026 | 10.45% | 30 September 2026 | View the September 2026 update |
Pace Analysis
How Fast Cove Boulevard by Imtiaz Has Been Built
With a single dated reading on the Cove Boulevard record, no pace between two inspections can be measured yet. What the register dates do allow is two pieces of arithmetic, not a forecast:
- 25 May 2025 start to 30 September 2026: enabling, piling, foundations and substructure, 0% to 10.45% over 493 daysAbout 0.64 points per month
- 30 September 2026 to the 30 October 2028 registered completion date: remaining 89.55 points spread evenly over 761 daysAbout 3.53 points per month
The 0.64 average covers everything the RERA report of 30 September 2026 places at or below ground level: mobilisation and enabling works still running, finished piling and foundation, and a substructure still being built. The 3.53 figure is not a measured rate at all; it is the remaining 89.55 points divided evenly across the days to the registered completion date on the DLD register. Read together they describe a starting slope, not a curve. The first measured pace arrives with the next dated register entry, and from that pair onward this section can read the shape of the build: the figure an end user timing a Q2 2028 move and an investor weighing delivery consistency will both want before the 40% due on completion.
Get the Next Inspection Figure First
Tell me you are tracking Cove Boulevard by Imtiaz and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Cove Boulevard by Imtiaz at Dubai Land Residence Complex
A 10.45% reading only means something next to what the finished tower will hold. The full guide sets out what buyers following this record are waiting for:

Cove Boulevard by Imtiaz: Apartments Over Offices in One Tower
Cove Boulevard is a mixed-use Imtiaz tower of 436 residences, with apartments on levels 15 to 30 above offices.
View the Cove Boulevard by Imtiaz Project GuideConsidering an Early-Stage Entry?
Cove Boulevard is listed with limited units available, and what remains can change between register readings. If this record is what brought you here, ask me what is currently available across the apartments and the offices.
Ask About Remaining Availability on WhatsAppStage Record
Cove Boulevard by Imtiaz Build Stages, Mapped to the Inspections
At the 30 September 2026 reading the Cove Boulevard record is 493 days long, so most of the five stages below still lie ahead. Each one is tied to what the register and the RERA report actually show, and to the office, amenity and residential floor bands the developer brochure sets out for this tower.
Start, Registration and Mobilisation
Construction start recorded on 25 May 2025 and DLD registration as project 3675 on 28 May 2025; mobilisation was still listed as ongoing on 30 September 2026.
Enabling, Piling, Foundations and Substructure
The RERA report of 30 September 2026 records piling and foundation as finished, with enabling works moving forward and the substructure still in progress, alongside the 10.45% register reading.
Ground, Podium and Tower Frame
Not yet recorded at 10.45%: the ground floor, the four podium levels and the 30 floors above them, per the developer fact sheet, follow the substructure.
Office Floors, Amenities Level and Residences
Per the developer brochure, office floors at Levels 1 to 13, the Level 14 amenities floor and residential floors at Levels 15 to 30 are enclosed and fitted out in this stage.
Rooftop, Commissioning and Handover
The brochure's rooftop infinity pool, gyms and clubhouse, then systems commissioning, lead to the Q2 2028 handover; the registered completion date on the DLD register is 30 October 2028.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Cove Boulevard by Imtiaz's own record.
Buyer Position
Tracking Your Position at Cove Boulevard by Imtiaz
This page is one of four project resources that together cover a Cove Boulevard by Imtiaz purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Cove Boulevard by Imtiaz Construction Updates
This page: the dated DLD register record for Cove Boulevard, May 2025 start to handover.

Cove Boulevard by Imtiaz Golden Visa: One Home Type Clears
Cove Boulevard, Imtiaz's single tower of 436 units in Dubai Land Residence Complex, qualifies only at the 3 bedroom apartments.
Read the Cove Boulevard by Imtiaz Golden Visa Guide
Cove Boulevard by Imtiaz: The 436-Unit Escrow on Record
Cove Boulevard by Imtiaz escrows 436 units with First Abu Dhabi Bank as DLD project 3675, 10.45% certified September 2026.
Verify the Cove Boulevard by Imtiaz Escrow AccountApproaching Handover
Between 10.45% and Handover: What Cove Boulevard by Imtiaz Buyers Should Do Now
With substructure works under way at the 30 September 2026 reading, Cove Boulevard's dated 60/40 plan had already reached 45% of the price against 10.45% in the register, because its instalments run on calendar dates rather than construction stages. The next 5% falls on 15 November 2026, so the three steps below belong before that date, not after it.
First, confirm that the 15 November 2026 instalment, like every earlier one, is paid into the DLD-registered escrow account of project 3675 at First Abu Dhabi Bank; the Cove Boulevard escrow account page shows how to check the account against the register.
Second, if residency matters to your purchase, read the Cove Boulevard Golden Visa guide before settling on a unit type: only the 3 bedroom apartments, from AED 2.13M ≈ USD 581K, are priced above AED 2M ≈ USD 545K, and eligibility is decided by the authorities on the value recorded at application.
Third, keep the Cove Boulevard project guide beside this record: the office floors at Levels 1 to 13 and the residences from Level 15 upward come after the substructure now recorded, so the layouts there are what each coming reading moves toward.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore Dubai Land Residence Complex Structure
A register record is only half the picture; the other half is the district this tower is being built into. These three pages place Cove Boulevard's progress in its market, community and developer context:

Dubai Land Residence Complex: Nine Imtiaz Apartment Projects in Dubailand
Dubai Land Residence Complex, Dubai Holding's freehold community, lists nine Imtiaz apartment projects with 50/50, 60/40 and post-handover plans.
See Dubai Land Residence Complex Properties for Sale
Dubai Land Residence Complex: Dubailand's Established Apartment Community
Dubai Land Residence Complex has 49 occupied buildings, 140 open retail outlets and four community parks, with new towers rising.
Explore the Dubai Land Residence Complex Community
Imtiaz Developments: Fully Furnished Residences in Dubai Islands, JVC and Meydan
Imtiaz Developments, founded in 2011, has completed and under-construction design led residential projects in Meydan, JVC and Dubai Islands.
View the Imtiaz Developments Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Cove Boulevard by Imtiaz Construction Updates Frequently Asked Questions
Cove Boulevard by Imtiaz, DLD project 3675 with Active status, read 10.45% in the Dubai Land Department project register on 30 September 2026, which places it in the substructure stage: the RERA report of that date records piling and foundation as finished and the substructure as under way. The dated record is laid out in the inspection timeline above.
Every percentage on this page is a Dubai Land Department project register reading for project 3675, shown with the date it was taken; the latest is 10.45% on 30 September 2026. The RERA progress monitoring report dated the same day contributes site notes and the status Main Contract, Progressing, without a percentage of its own, and an earlier 5.9% register figure carries no date, so it is plotted as a dot on the track rather than as a timeline row.
No, and the two dates do different jobs: the DLD register gives Cove Boulevard a registered completion date of 30 October 2028, which sits after the developer's Q2 2028 handover target and is the regulatory completion deadline on the register, not a forecast. At the 30 September 2026 reading of 10.45%, 89.55 percentage points remained; actual handover is confirmed by Imtiaz as the works complete, and this record is updated with each new dated reading.
From the 25 May 2025 construction start to the 10.45% reading of 30 September 2026, Cove Boulevard averaged about 0.64 percentage points per month over 493 days. Spreading the remaining 89.55 points evenly over the 761 days left until the 30 October 2028 registered completion date gives about 3.53 points per month; both figures are arithmetic, not a forecast, and are set out in the pace analysis above.
The developer fact sheet gives Cove Boulevard a 2B+G+4P+30+R configuration: two basements, ground, four podium levels and 30 floors, topped by a rooftop. The developer brochure assigns office floors to Levels 1 to 13, an amenities floor with pools and a zen garden to Level 14, residences to Levels 15 to 30, and an infinity pool, gyms and a clubhouse to the rooftop; at the 30 September 2026 reading of 10.45%, work stood at substructure level.
Cove Boulevard includes 436 units across residences and offices, the total shown both in the DLD register for project 3675 and in the developer fact sheet. The residences are studio, 1, 2 and 3 bedroom apartments, and the offices occupy their own floors beneath them; the register reading for the whole building was 10.45% on 30 September 2026.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Cove Boulevard by Imtiaz construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.