Imtiaz · Dubai Land Residence Complex · Construction Update
Cove Edition 4 by Imtiaz Construction Update - August 2026
August 2026 Inspection Places Cove Edition 4 by Imtiaz at 30.16% on the DLD Register in Dubai Land Residence Complex
Structure, internal works and MEP works were progressing at Cove Edition 4 when RERA inspected on 4 August 2026, with enabling and foundation works recorded as completed.
Direct advisor access. Every message answered personally, never by a call center.
DLD Register Inspection Data
Cove Edition 4 by Imtiaz Construction Snapshot
A 9.66 point rise on the previous DLD register reading, which carries no date, puts Cove Edition 4 at 30.16% and inside the superstructure band, the stage where a buyer's dated payment record and escrow trail matter more than any finishing detail.
Cove Edition 4 by Imtiaz
3483
Active
30.16%
4 August 2026
21-01-2025
260 residences
15,045.50 sq m
Q4 2026
Data source: the DLD project register reading dated 04-08-2026 and the RERA Independent Progress Monitoring Report for the inspection of 4 August 2026, which prints no percentage, so both readings shown here are DLD register figures. The project was registered on 28-01-2025, with construction start recorded as 21-01-2025. The header image is a developer rendering supplied for this update, not a site photograph. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: August 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Cove Edition 4 by Imtiaz Construction Progress Summary
Over the 560 days from the recorded construction start on 21-01-2025 to the 4 August 2026 inspection, Cove Edition 4 logged 30.16 points on the DLD register, about 1.62 points per month (arithmetic, not a forecast). The RERA report describes the project as one 1B+G+3P+13F+R residential building, so every point recorded up to August 2026 belongs to one structure built up from finished groundworks.
- Enabling works on the plot, per the RERA report
- Foundation works for the residential building
- Structural works on the 1B+G+3P+13F+R building
- Internal works recorded as progressing in August 2026
- MEP works: mechanical, electrical and plumbing installations
- Main contract status: Progressing
- Remaining structural floors up to the roof level
- Rooftop infinity pool, gym and clubhouse in the developer's plans
- Furnished fit out of the 260 residences, as Imtiaz markets them
- Further RERA inspection cycles toward 100%
Payment Linked Progress
What 30.16% Progress Means for Cove Edition 4 Buyers
Imtiaz sells Cove Edition 4 on two date-based plans rather than construction milestones, so the calendar sets the instalments: by the 4 August 2026 reading every dated instalment had fallen due, 50% of the price on Option 1 (50/50) and 55% on Option 2 (70/30), against 30.16% registered progress. Four checks follow from that record.
Verify the escrow account
Construction-period payments belong only in the DLD regulated escrow account held with First Abu Dhabi Bank for project 3483, registered as Cove Edition Residence 4 By Imtiaz. Cove Edition 4 escrow account verification sets out the check; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA payment schedule
Match each dated instalment you have paid against your sale and purchase agreement, then check how it defines the completion payment (50% on Option 1, 15% on Option 2) and, on Option 2, when the 2.5% quarterly post-handover instalments begin. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Confirm your Oqood registration
Off-plan units are entered in the Dubai Land Department's interim Oqood register before any title deed exists. Check that your apartment appears under DLD project 3483 in your own name, and keep that registration record with your SPA and payment receipts.
Track the remaining cycles
With 69.84 points still to be recorded, many readings lie between this one and handover. Cove Edition 4 by Imtiaz construction updates logs each of them; alongside it, confirm the current handover timetable in writing with the developer and check the latest reading on Dubai REST.
General framework, not legal advice: instalment dates, the completion payment, and notice periods are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 30.16%?
Entering mid-build trades launch timing for a visible record: the August 2026 report lists enabling and foundation works as completed and the structure as progressing. On either plan the dated instalments are settled at signing per the developer's current terms, so confirm the schedule with Imtiaz before you commit. Every payment goes to the DLD-registered escrow account for project 3483, released against construction progress recorded by the DLD.
- Recorded groundwork: enabling and foundation works completed per the RERA report
- Handover marketed by Imtiaz for Q4 2026
- Option 2 leaves 30% payable over three years after handover
- Construction risk carried from excavation to handover
- Two to four years of waiting is the usual delivery horizon
- Longer installment runway, priced at launch levels
Limited units available per the developer as of this update; availability shifts between cycles.
About the Development
Cove Edition 4 by Imtiaz Project Details

With foundations recorded as completed and the structure progressing in August 2026, Cove Edition 4 is a mid-build single building of 260 studio, 1 and 2 bedroom apartments that Imtiaz plans to deliver fully furnished. Starting prices: AED 690K ≈ USD 188K.
Buying at this stage means a shorter wait than launch buyers faced, with the dated instalments settled at signing, the balance falling due on completion, and handover marketed for Q4 2026.
Cove Edition 4 by Imtiaz Project GuideSite Context This Cycle
Explore Cove Edition 4 by Imtiaz Location on Dubai Map
The developer's satellite slide places Cove Edition 4 on a compact plot beside a roundabout, set back from one of the district's main boulevards, with mid-rise blocks and open sand plots around it. With one building on one footprint there is no second block to sequence around, and the August 2026 notes record the structure, internal works and MEP works progressing at the same time on that single building.
Dubai Land Residence Complex sits within Dubailand close to the Al Ain-Dubai Road (E66) and Emirates Road (E611), with Academic City and Dubai Outlet Mall about 5 minutes away and Silicon Oasis about 8 minutes, per the developer's location map. Buyers can judge those roads and daily retail today, while the building itself still has 69.84 points to record before handover; locate the plot on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Cove Edition 4 by Imtiaz During Superstructure Works
The superstructure band is when payment records, escrow checks and residency planning count for more than finishing details. Each resource below matches where Cove Edition 4 stood at the August 2026 reading.

Cove Edition 4 by Imtiaz Construction Updates
This page: the August 2026 DLD register record for Cove Edition 4, read at 30.16% progress.

Cove Edition 4 by Imtiaz Golden Visa: One Layout Crosses the Line
At Cove Edition 4, Imtiaz's 260 furnished residences, only the 2 bedroom apartments clear the threshold, with little room to spare.
Read the Cove Edition 4 Golden Visa Guide
Cove Edition 4 by Imtiaz: The Fourth Edition's Escrow Account
First Abu Dhabi Bank holds Cove Edition 4 by Imtiaz escrow as DLD project 3483, 260 units, 30.16% certified August 2026.
Verify the Cove Edition 4 Escrow AccountUpdate Timeline
Other Cove Edition 4 by Imtiaz Construction Updates
August 2026 is the first monthly record for Cove Edition 4 on this site; the pillar gathers every later reading as new inspections reach the DLD register.
Where This Update Fits
Explore Cove Edition 4 by Imtiaz Structure
This August record sits inside a wider picture: the district around the plot, the listings competing with it, and the developer building it.

Dubai Land Residence Complex: Nine Imtiaz Apartment Projects in Dubailand
Dubai Land Residence Complex, Dubai Holding's freehold community, lists nine Imtiaz apartment projects with 50/50, 60/40 and post-handover plans.
See Dubai Land Residence Complex Properties for Sale
Dubai Land Residence Complex: Dubailand's Established Apartment Community
Dubai Land Residence Complex has 49 occupied buildings, 140 open retail outlets and four community parks, with new towers rising.
Explore the Dubai Land Residence Complex Community
Imtiaz Developments: Fully Furnished Residences in Dubai Islands, JVC and Meydan
Imtiaz Developments, founded in 2011, has completed and under-construction design led residential projects in Meydan, JVC and Dubai Islands.
View the Imtiaz Developments Developer ProfileFAQs
Cove Edition 4 by Imtiaz Construction Progress in August 2026: Frequently Asked Questions
The DLD project register shows Cove Edition 4 (project 3483) at 30.16% on the inspection report card dated 4 August 2026, with the project status Active. The RERA Independent Progress Monitoring Report from that visit prints no percentage of its own, so 30.16% is a DLD register reading, and it is the figure this page records for the August 2026 cycle.
Q4 2026 is the handover window Imtiaz markets for Cove Edition 4, and it is the handover this page uses as of the 4 August 2026 reading. Handover timing can be revised between inspection cycles, so buyers should confirm the current handover timetable in writing with the developer and check the latest reading for project 3483 on Dubai REST. How readings and timelines are followed from cycle to cycle is set out on the Cove Edition 4 by Imtiaz construction updates pillar.
The DLD app's inspection report card dated 4 August 2026 lists 20.5% as the previous inspection but does not state when that earlier visit took place. Without a date, the gap between the two readings cannot be turned into a monthly rate, so this page marks 20.5% on the progress track as an undated earlier reading and builds no timeline row from it.
The report for the 4 August 2026 inspection describes a 1B+G+3P+13F+R residential building: one basement, a ground floor, three podium levels, 13 residential floors and a roof level. Its notes record the enabling and foundation works as completed and the structure, internal works and MEP works as progressing, under a RERA progress status of Main Contract, Progressing. The report also carries inspection photographs, which stay part of the official record.
No. The header image combines two developer renderings supplied for the August 2026 update; it shows the design intent, not the construction site, and no progress can be read from it. The evidence for this month is the DLD register reading of 30.16% and the RERA report dated 4 August 2026.
Search the Dubai REST app of the Dubai Land Department for project 3483, listed under the register name Cove Edition Residence 4 By Imtiaz; its inspection report card shows the current and previous readings with the report date. Each new monthly record for the project is added to the construction updates pillar as it publishes, while this page stays the record of the 4 August 2026 inspection.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the August 2026 inspection record for Cove Edition 4 by Imtiaz correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.