Emaar Properties · Dubai Creek Harbour · Construction Update
Creek Waters 2 Construction Update - April 2026
April 2026 Inspection Records Creek Waters 2 at 73.84% Construction Progress in Dubai Creek Harbour
External envelope, MEP, and internal finishes are progressing at Creek Waters 2, with structure works complete and the tower recorded at 73.84 percent on 20 April 2026.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Creek Waters 2 Construction Snapshot
A 73.84% reading on 20 April 2026 puts Creek Waters 2 inside the finishing band, where the structure is behind the project and the remaining inspection cycles measure envelope, services, and interiors ahead of the Q4 2027 handover.
Creek Waters 2 by Emaar Properties
2634
Active
73.84%
20 April 2026
22 August 2023
455
51,291.71 sq m
31 December 2027
Data source: RERA inspection conducted on 20 April 2026, tracked against DLD inspection records for project 2634; the Independent Progress Monitoring Report for that visit notes it was independently inspected and progress audited for RERA. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: September 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Creek Waters 2 Construction Progress Summary
The 20 April 2026 report for Creek Waters 2 records enabling, foundation, and structure works as completed and internal work at an advanced stage, which means the single tower on plot 147 has moved from building its frame to fitting it out. The same register card lists a previous inspection of 62.95% without a date, so this report reads April as a position rather than a pace.
- Enabling works on plot 147 in Al Khairan First
- Foundation works beneath the tower and its two basements
- Structure works through the podium and all 50 floors
- Internal work, recorded at an advanced stage
- MEP systems throughout the tower
- External envelope of the tower
- Internal finishes across approx. 450+ units
- External works at ground and podium level
- Remaining RERA inspection cycles toward 100%
- Building completion certificate procedures
- Handover expected in Q4 2027
Payment Linked Progress
What 73.84% Progress Means for Creek Waters 2 Buyers
Creek Waters 2 launched in 2023 on a 90/10 plan whose later instalments were labelled against estimated construction completion stages, so a register reading of 73.84% tells a buyer where the project sits between those stages and which protections still apply. Four actions matter at this point.
Verify the escrow account
Every payment still ahead of handover should go only to the DLD regulated escrow account registered for project 2634 with First Abu Dhabi Bank. Creek Waters 2 escrow account verification comes before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA milestone schedule
Check how your sale and purchase agreement defines the construction linked instalments and the handover notice period, and set those clauses against the Q4 2027 handover. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Plan the snagging inspection
With internal finishes still progressing on 20 April 2026, there is nothing to inspect yet: the handover inspection of your own unit lies ahead. Creek Waters 2 snagging inspection guide sets out the timing and scope to plan for now.
Track the remaining cycles
26.16 points separated this reading from 100%, so several inspection cycles still lie between April 2026 and handover. Creek Waters 2 construction updates hub records each dated reading as it is published.
General framework, not legal advice: instalment triggers, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 73.84%?
Entering Creek Waters 2 at this stage means buying into a tower whose structure is already recorded as complete, with the delivery window running to Q4 2027 and only a small number of units still listed. Every payment goes to the DLD-registered escrow account for project 2634, released against inspected construction progress.
- Structure works recorded as completed in the 20 April 2026 report
- About 20 months to the registered completion date of 31 December 2027
- Reading sits between the 60% and 80% stages named in the 2023 launch schedule
- Construction risk carried from an empty plot to handover
- A delivery horizon measured in years rather than months
- The full instalment runway, priced at launch levels
2 units listed available on the Creek Waters 2 project page at publication; availability shifts between cycles.
About the Development
Creek Waters 2 Project Details

With structure works recorded as completed in April 2026, Creek Waters 2 is a single Emaar tower of approx. 450+ units on Creek Island: 1 to 4 bedroom apartments, podium townhouses, and a duplex penthouse. Starting prices: AED 1.70M ≈ USD 463K.
Entering at this stage means a shorter wait than at launch but less payment plan runway, with handover expected in Q4 2027 against a registered completion date of 31 December 2027.
Creek Waters 2 at Dubai Creek Harbour Project GuideSite Context This Cycle
Explore Creek Waters 2 Location on Dubai Map
Creek Waters 2 stands on plot 147, Al Khairan First in the DLD record, on Creek Island in Dubai Creek Harbour, with its tower facing Dubai Creek and the Downtown Dubai skyline and its podium townhouses fronting the Creek Island promenade. That island position shapes the current cycle: with the structure complete, the external envelope of a 50 floor tower and the external works at ground and podium level are the packages most visible from the water and the promenade, while internal finishes progress behind the facade.
Dubai Creek Harbour is still filling in around the island: Creekside Park sits at the project's doorstep, Creek Marina and its 81 berth yacht club are about five minutes away, Creek Palace became a delivered Creek Island phase in March 2026, and the developer's masterplan shows four planned metro stations, three bridges into the district, and water taxis to Downtown Dubai (see the Dubai Metro network guide). For a buyer reading the April 2026 record, occupancy or rental plans for Q4 2027 depend on how much of that infrastructure is running by handover. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Creek Waters 2 While Finishing Works Progress
At 73.84% the questions shift from whether the tower will be built to how remaining payments, residency plans, and the handover inspection line up. Each resource below is matched to that stage.

Creek Waters 2 Construction Updates
This page: the 20 April 2026 register reading for Creek Waters 2, with inspection notes explained.

Creek Waters 2 at Dubai Creek Harbour Golden Visa: Five of Six
Five of six tiers at Creek Waters 2 at Dubai Creek Harbour, Emaar's Creek Island tower, qualify individually.
Read Creek Waters 2 Golden Visa Guide
Creek Waters 2 at Dubai Creek Harbour: An 81% Certified Escrow
Creek Waters 2 at Dubai Creek Harbour escrows at First Abu Dhabi Bank, DLD project 2634, 81.84% certified July 2026.
Verify Creek Waters 2 Escrow Account
Creek Waters 2 at Dubai Creek Harbour Snagging Over 50 Floors
Creek Waters 2 at Dubai Creek Harbour is a single Emaar tower on Creek Island, with apartments, townhouses and a penthouse.
Book Creek Waters 2 Snagging InspectionUpdate Timeline
Other Creek Waters 2 Construction Updates
April 2026 is the first monthly reading published for Creek Waters 2 on this site; each later cycle follows it with its own dated register figure.
All Creek Waters 2 Construction UpdatesWhere This Update Fits
The Wider Picture Around Creek Waters 2
This monthly report is one part of a wider record: the district growing around the site, the developer delivering the tower, and the listings a buyer would weigh against it.

Dubai Creek Harbour Properties for Sale
Browse waterfront apartments, branded residences and penthouses for sale in Dubai Creek Harbour.
See Dubai Creek Harbour Properties for Sale
Dubai Creek Harbour: Emaar's Waterfront City With a Marina and Urban Beach
Dubai Creek Harbour is Emaar's waterfront city between Downtown Dubai and the Creek, planned for 48,500 homes with skyline views.
Explore the Dubai Creek Harbour Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileFAQs
Creek Waters 2 Construction Progress in April 2026: Frequently Asked Questions
As of the RERA inspection conducted on 20 April 2026, Creek Waters 2 stands at 73.84% construction progress in the DLD register for project 2634. The Independent Progress Monitoring Report filed for that visit sets the progress status as Main Contract, Progressing, and was independently inspected and progress audited for RERA.
Yes. The DLD register as of the 20 April 2026 reading carries a registered completion date of 31 December 2027, consistent with the Q4 2027 handover, and 26.16 percentage points remained between that reading and 100%. Registered completion dates can be revised between inspection cycles, so any change would show in a later reading; how cycles lead to completion is covered on the Creek Waters 2 construction updates hub.
The 20 April 2026 report records that enabling, foundation, and structure works were completed and that internal work had reached an advanced stage. MEP, external works, the external envelope, and internal finishes were progressing at different stages. Nine inspection photographs were filed with the record in the DLD app; they are record material and are not reproduced here.
The DLD app card for the 20 April 2026 inspection lists 62.95% under Previous Inspection but displays no date for that earlier visit. Without a date there is no reliable rate of progress to calculate, so this page reports 73.84% as a position on 20 April 2026 rather than a monthly pace.
The 2023 launch schedule for Creek Waters 2 linked its sixth instalment of 10% to 60% estimated construction completion and its seventh instalment of 10% to 80%, with the final 10% at 100%. The 20 April 2026 reading of 73.84% sits between those 60% and 80% stages. The schedule labels these as estimated construction completion dates, and your own SPA and the developer's payment notices decide when any instalment actually falls due.
Not yet. On 20 April 2026 internal finishes were still progressing, and a snagging inspection needs finished units, so the inspection itself belongs at handover, expected in Q4 2027. What April 2026 allows is planning: timing and scope are set out in the Creek Waters 2 snagging inspection guide.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the April 2026 inspection record for Creek Waters 2 at Dubai Creek Harbour correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.