DAMAC CASA Construction Updates

The Dated Register Record of an Al Sufouh Tower Rising Toward Its Crown Level

DAMAC Casa reached 33.55% in the DLD register on 18 August 2026, a climb showing foundations substantially complete and the Al Sufouh tower frame rising.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

33.55%Construction Progress
18 August 2026Latest RERA Inspection
403 Residential UnitsTotal Units
Project 2801DLD Registration

Construction Snapshot

DAMAC CASA at a Glance

DAMAC Casa is DAMAC's 403-residence tower in Al Sufouh beside Dubai Media City, registered with the Dubai Land Department as project 2801 on 20 October 2023 and started on 26 December 2023. The first dated reading in its record, 33.55% on 18 August 2026, arrived 966 days after that start, while the register's earlier 25.82% figure carries no date at all. The record therefore opens on a single fixed point rather than a series, which is why every figure below is shown with its date or marked as undated.

DLD Project Number

2801

Project Status

Active

Construction Start

26 December 2023

Total Units

403 Residential Units

Total Built-Up Area

56,344.87 sq m

Registered Completion Date

Q2 2028 (developer handover)

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

DAMAC CASA Construction Update Timeline

The DAMAC Casa record holds one dated reading: 33.55% on 18 August 2026. The same register entry lists a previous inspection at 25.82% without saying when it took place, so that figure sits on the track as a dot marked Previous Inspection, gets no table row, and counts only toward the 7.73-point rise between the two. The single table row links the August 2026 monthly update, where that inspection is covered in full.

Inspection MonthConstruction ProgressInspection DateFull Update
August 202633.55%18 August 2026View the August 2026 update

Pace Analysis

How Fast DAMAC CASA Has Been Built

With one dated reading, DAMAC Casa's pace can be read only as an average across the whole build since the register start and as a raw change from an undated earlier figure. Every line below is arithmetic, not a forecast:

  • Dec 2023 to Aug 2026: whole build, from the 26 December 2023 start to 33.55% on 18 August 2026 (966 days)About 1.0 point per month
  • Undated previous inspection to 18 Aug 2026: 25.82% to 33.55%, no dated spanUp 7.73 points, no monthly rate
  • 18 Aug 2026 to the Q2 2028 expected handover: 33.55% to 100%66.45 points still to record

The whole-build figure divides 33.55% by about 32.2 months (1.04 before rounding), so it spreads the register's number evenly across a stretch that also held enabling works, foundations and two basement levels, the parts the 18 August 2026 inspection report now lists as substantially completed or well advanced. The 7.73-point step from the undated 25.82% reading shows the register moving, but with no start date for that step there is no honest way to turn it into a monthly rate, and this page does not estimate one. What the record does establish is the distance still to cover: 66.45 points between the August 2026 reading and 100%, with Q2 2028 as the expected handover quarter. Whether the tower covers that distance at, above or below its whole-build average is a question only the next dated readings can answer, which is why an investor weighing timing and an end user planning a move should both read the first measured inspection-to-inspection pace, when it arrives, as the more telling number.

Get the Next Inspection Figure First

Tell me you are tracking DAMAC CASA and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About DAMAC CASA at Dubai Media City

A 33.55% reading on 18 August 2026 only means something against what the finished tower is meant to deliver. The project guide covers what DAMAC Casa buyers are tracking toward on this page:

Aerial twilight view of DAMAC Casa showcasing its elevated sky amenities, rooftop infinity pool, layered curved terraces, and panoramic waterfront views across Dubai’s skyline. Presented by Tohid Fetrat.

DAMAC CASA: A Water-Themed Tower Beside Dubai Media City

DAMAC CASA is a water and island themed tower in Al Sufouh with 403 luxury and super luxury residences.

View the DAMAC CASA Project Guide

Considering a Mid-Construction Entry?

Availability at DAMAC Casa keeps shifting while the frame rises and each new register reading lands. If the record on this page is what brought you here, ask me for current availability before the choice of layouts and floors narrows further.

Ask About Remaining Availability on WhatsApp

Stage Record

DAMAC CASA Build Stages, Mapped to the Inspections

Each stage below is pinned to what the DAMAC Casa register entry and its 18 August 2026 inspection report actually record, so the map shows where project 2801 stands at 33.55% instead of a textbook sequence.

Oct 2023 to Dec 2023

Registration and Construction Start

Registered with the Dubai Land Department as project 2801 on 20 October 2023, with the construction start following on 26 December 2023.

Dec 2023 to Aug 2026

Enabling Works and Foundations

The groundwork phase this record can already close: by the 18 August 2026 inspection, the site preparation and foundations under the two basement levels were reported as substantially completed.

Current PhaseAug 2026, 33.55% at last reading

Substructure and Rising Frame

Below ground the substructure was well advanced; above it, frame, interior and MEP works were each at their own point of progress when the register recorded 33.55% on 18 August 2026.

After Aug 2026, not yet recorded

Envelope, Finishes and Amenity Levels

Facade and finishes were only at an early stage in August 2026; the podium rooftop amenities and the crown-level pools belong to this stage, still ahead in the record.

Toward Q2 2028

Completion and Handover

Handover is expected in Q2 2028. The time-based plan ties its final 20% instalment to completion rather than to any register percentage, and no registered completion date appears in the register evidence for this record.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on DAMAC CASA's own record.

Buyer Position

Tracking Your Position at DAMAC CASA

This page is one of four project resources that together cover a DAMAC CASA purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

DAMAC Casa by DAMAC Properties in Al Sufouh construction updates cover image featuring a project rendering of the illuminated residential tower beside the waterfront skyline in Dubai - Presented by Tohid Fetrat
You Are Here

DAMAC CASA Construction Updates

This page: the DLD register record for DAMAC Casa, from the December 2023 start to handover.

DAMAC Casa by DAMAC Properties in Al Sufouh Golden Visa graphic with a gold visa card beside the illuminated curved tower exterior in Dubai - Presented by Tohid Fetrat

DAMAC CASA Golden Visa: Five Tiers in Al Sufouh

DAMAC CASA, DAMAC's 403-residence tower in Al Sufouh beside Dubai Media City, qualifies at all five tiers from 1 bedroom luxury.

Read the DAMAC CASA Golden Visa Guide
DAMAC Casa by DAMAC Properties in Al Sufouh escrow account protection graphic with shield and padlock icons above a waterfront pool terrace and curved tower facade in Dubai - Presented by Tohid Fetrat

DAMAC CASA Escrow: Dubai Media City's Abu Dhabi Islamic Bank Account

DAMAC CASA, DLD project 2801, holds 405 units in Abu Dhabi Islamic Bank escrow, 33.55% certified August 2026.

Verify the DAMAC CASA Escrow Account

Approaching Handover

Between 33.55% and Handover: What DAMAC CASA Buyers Should Do Now

At the 18 August 2026 reading of 33.55%, the foundations are behind DAMAC Casa while its frame, envelope and finishes are still in progress, so this is the stretch where buyers check money and paperwork rather than fittings. On the time-based plan, 3.75% instalments fall due at three-month intervals from each buyer's sale date up to month 48, whatever the register shows, so the three steps below belong before your next due date, not after it.

First, before each three-monthly transfer, check the receiving account against the DAMAC Casa escrow account guide, which covers the project 2801 trust account held with Abu Dhabi Islamic Bank.

Second, if residency is part of the reason for buying, settle eligibility early through the DAMAC Casa Golden Visa eligibility page, since the application route depends on where your purchase stands between Oqood registration and the title deed.

Third, keep the record itself in view: the DAMAC Casa August 2026 construction update holds the full 18 August 2026 inspection detail, and each later dated reading joins the timeline above as the 66.45 remaining points are recorded.

Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore Dubai Media City Structure

DAMAC Casa's 18 August 2026 reading of 33.55% was recorded inside a district that is already built and trading. These three pages put the tower's progress in its listings, community and developer context:

Dubai Media City properties for sale overlooking a landscaped golf course with modern residential towers Presented by Tohid Fetrat

Dubai Media City Properties for Sale

Browse apartments and branded residences for sale in Dubai Media City, with prices and payment plans.

See Dubai Media City Properties for Sale
Dubai Media City waterfront skyline with illuminated office buildings and modern skyscrapers at dusk Presented by Tohid Fetrat

Dubai Media City: The Creative District Between Palm Jumeirah and Dubai Marina

Dubai Media City is home to more than 4,000 companies, with a limited residential market of branded residences and serviced homes.

Explore the Dubai Media City Community
DAMAC Properties development overlooking Dubai skyline and waterfront with modern architecture at sunset in Dubai Presented by Tohid Fetrat

DAMAC Properties: Lagoon Communities, Golf Villas and Branded Collaborations

Founded in 2002, DAMAC has delivered 48,000 homes and is known for large-scale master communities, luxury residential projects and branded collaborations.

View the DAMAC Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

DAMAC CASA Construction Updates Frequently Asked Questions

DAMAC Casa is an active Dubai Land Department project (number 2801) in its structural stage, recorded at 33.55% in the DLD register on 18 August 2026, with its foundations behind it and the tower frame under way. The full record is in the DAMAC Casa inspection timeline above.

The latest DLD register reading for DAMAC Casa is 33.55%, dated 18 August 2026, up 7.73 points from the register's previous inspection reading of 25.82%, which carries no date. RERA's progress report from that visit prints no percentage of its own, so the figure comes from the Dubai Land Department register.

DAMAC Casa's expected completion is Q2 2028, the handover quarter this record tracks toward; at the 18 August 2026 reading of 33.55%, 66.45 percentage points remained to be recorded. This page's record is updated as each new dated reading is published, and no forecast of an earlier or later finish is drawn from the figures so far.

DAMAC Casa has 403 residential units in a 2B+G+2P+43F+R tower: two basements, a ground level and two podium levels beneath 43 floors of 1-, 2- and 3-bedroom Luxury and 4- and 5-bedroom Super Luxury apartments, topped by a roof and crown level. The rest of the product detail sits in the DAMAC Casa project guide.

Across the 966 days from the 26 December 2023 construction start to the 18 August 2026 reading of 33.55%, DAMAC Casa averaged about 1.0 point per month over about 32.2 months, a piece of arithmetic rather than a forecast. The 7.73-point rise from the undated 25.82% reading cannot be converted into a monthly rate; the DAMAC Casa pace analysis sets out both figures.

The Dubai Land Department register records DAMAC Casa as registered on 20 October 2023 and started on 26 December 2023. The first dated reading on this record, 33.55% on 18 August 2026, came 966 days after that start date.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the DAMAC CASA construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.