DAMAC · DAMAC Hills 2 · Construction Update
Elo 2 & Elo 3 Construction Update - April 2026
April 2026 Inspection Confirms Elo 2 & Elo 3 Reaches 6.36% Construction Progress in DAMAC Hills 2
Raft foundations for both towers are at an advanced stage while common area works begin, verified at 6.36 percent in the April 2026 RERA inspection cycle.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Elo 2 & Elo 3 Construction Snapshot
A 4.90 point rise from the previous certified reading of 1.46% places Elo 2 & Elo 3 in the foundations band, the stage where the record shows money committed being converted into structure that a later inspection can measure.
Elo 2 & Elo 3 by DAMAC
3122
Active
6.36%
15 April 2026
01 September 2024
1,114 residential units
Q2 2027
Data source: RERA inspection conducted on 15 April 2026, tracked against DLD inspection records for project 3122. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: September 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Elo 2 & Elo 3 Construction Progress Summary
The 15 April 2026 inspection moved Elo 2 & Elo 3 from 1.46% to 6.36%, and the report explains where those 4.90 points went: mobilization for the main contract is still running, the enabling works and raft foundations under the two towers have reached an advanced stage, and the shared common area has only just started. The main contract is marked as progressing.
- Project registration in the DLD register on 1 August 2024
- Escrow account opened with Emirates NBD Bank for project 3122
- Construction start recorded on 1 September 2024
- Main contract mobilization, recorded as ongoing on site
- Enabling works across plot 4430 at Madinat Hind 4
- Raft foundations under both towers, at an advanced stage
- Shared basement, ground and podium common area, at early stage
- Superstructure for two towers of fourteen floors plus roof
- Facade, MEP and interior fit out across 1,114 residential units
- Remaining RERA inspection cycles from 6.36% toward 100%
- Building completion certificate procedures before Q2 2027 handover
Payment Linked Progress
What 6.36% Progress Means for Elo 2 & Elo 3 Buyers
Off plan payment plans in Dubai mix dated installments with construction linked ones, so a verified reading of 6.36% tells you which obligations are live now and which are still far ahead. On the 80/20 regular plan recorded for this project, the two progress linked installments sit at 80% and 90% completion, a long way past the April 2026 reading. At this stage of Elo 2 & Elo 3, three actions matter most.
Verify the escrow account
Every payment made during construction should go only to the DLD regulated escrow account registered for project 3122. Elo 2 & Elo 3 escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA and confirm Oqood registration
Check how your sale and purchase agreement dates the monthly installments running to month 34, and confirm the sale is registered under Oqood in your name. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the certified milestones.
Track the early cycles
Foundations move slowly in percentage terms and then accelerate once vertical structure starts, so the shape of the next few readings is worth watching. Elo 2 & Elo 3 construction updates hub keeps every reading in one place.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 6.36%?
Entering while foundations are still going in trades waiting time for the full payment runway: the plot, the contractor and the certified record are already established, and the installment schedule is almost entirely ahead of you rather than behind. Every payment goes to the DLD-registered escrow account for project 3122, released against certified construction progress.
- Foundations certified in the DLD record, not a pre construction promise
- Roughly fourteen months to the expected Q2 2027 handover
- 80% of the plan still ahead, spread to month 34 and completion
- Construction risk carried from the first excavation onward
- Two to four years of waiting is the usual delivery horizon
- The full installment runway, priced at launch levels
Limited units listed available on the project page as of this update; availability shifts between cycles.
About the Development
Elo 2 & Elo 3 Project Details

With raft foundations advancing under both towers, Elo 2 & Elo 3 is an early stage development of 1,114 one and two bedroom apartments across two fourteen storey towers on a shared podium. Starting prices: AED 577K ≈ USD 157K.
For buyers entering at this stage, the trade off is a longer wait against an almost untouched installment runway, with handover expected in Q2 2027 per the current DLD record.
Site Context This Cycle
Explore Elo 2 & Elo 3 Location on Dubai Map
Elo 2 & Elo 3 occupies plot 4430 at Madinat Hind 4, a parkland facing position inside DAMAC Hills 2, and the two towers rise from one shared basement, ground and podium structure rather than from separate footprints. That shared substructure is why the April 2026 record separates the raft foundations under the towers, at an advanced stage, from the common area works that have only just begun.
Because DAMAC Hills 2 is already an occupied community with completed roads, retail and leisure anchors in daily use, these towers are being built into a working neighbourhood rather than an empty masterplan, which at 6.36 percent matters less for site access than it will for rental readiness in the Q2 2027 handover window. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Elo 2 & Elo 3 During Early Construction Progress
The foundations band is where payment protection, residency planning, and tracking cadence do the most work for a buyer. Each resource below is matched to where Elo 2 & Elo 3 stands right now.

Elo 2 & Elo 3 Construction Updates
This page: the verified April 2026 inspection record for Elo 2 and Elo 3 foundations.

Golden Visa for Elo 2 & Elo 3 at DAMAC Hills 2
Neither release at Elo 2 & Elo 3 at DAMAC Hills 2 reaches AED 2M alone; three Elo apartments together do.
Read Elo 2 & Elo 3 Golden Visa Guide
Elo 2 & Elo 3 at DAMAC Hills 2: Shared Escrow
Elo 2 & Elo 3 at DAMAC Hills 2 share DLD project 3122, escrowed at Emirates NBD, 6.36% certified April 2026.
Verify Elo 2 & Elo 3 Escrow AccountUpdate Timeline
Other Elo 2 & Elo 3 Construction Updates
April 2026 is the first published inspection record for Elo 2 & Elo 3. Every reading after it lands on the hub below, so the climb from foundations to handover stays in one place.
Where This Update Fits
Explore Elo 2 & Elo 3 Structure
This monthly report is one node in the wider record: the community that surrounds the site, the developer delivering it, and the listings competing with it.

DAMAC Hills 2 Properties for Sale
Browse villas, townhouses and selected apartments for sale in DAMAC Hills 2, with prices and payment plans.
See DAMAC Hills 2 Properties for Sale
DAMAC Hills 2 Community Overview
Read the DAMAC Hills 2 guide: a self-contained villa community with themed clusters, lifestyle zones and family amenities.
Explore the DAMAC Hills 2 Community
DAMAC Properties: Lagoon Communities, Golf Villas and Branded Collaborations
Founded in 2002, DAMAC has delivered 48,000 homes and is known for large-scale master communities, luxury residential projects and branded collaborations.
View the DAMAC Developer ProfileFAQs
Elo 2 & Elo 3 Construction Progress in April 2026: Frequently Asked Questions
As of the RERA inspection conducted on 15 April 2026, Elo 2 & Elo 3 stands at 6.36% construction progress in the DLD project register for project 3122, with the status recorded as Active.
The record moved from 1.46% at the previous certified inspection to 6.36% on 15 April 2026, a gain of 4.90 points. The inspection attributes that movement to enabling works and the raft foundations under both towers, with the shared common area still at an early stage.
The 15 April 2026 report describes mobilization for the main contract as ongoing, the enabling works and raft foundations for the two towers as progressing at an advanced stage, and the common area as at an early stage. The main contract itself is marked as progressing.
Yes. Expected completion in the DLD project register can be revised between inspection cycles, and at 6.36% there are far more cycles ahead than behind. The Q2 2027 window shown here reflects the record as of the April 2026 reading; any revision would appear in a later update on this cluster.
No. On the 80/20 regular plan recorded for this project the two progress linked installments fall at 80% and 90% construction completion, with the final 20% due on handover; everything payable before that is dated from the sale date rather than from a construction percentage. Your own sale and purchase agreement is the document that governs and should be read directly.
Enabling works prepare the plot for building: excavation, shoring, and the service diversions that must finish before permanent concrete is poured. The raft is the single thick slab that spreads a tower's load across the ground beneath it. Both reaching an advanced stage by 15 April 2026 means vertical structure is the next thing the record should show. How readings are compiled from cycle to cycle is covered on the Elo 2 & Elo 3 construction updates hub.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the April 2026 inspection record for Elo 2 & Elo 3 at DAMAC Hills 2 correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.