Emaar Properties · Emaar Beachfront · Construction Update
Grand Bleu Tower Construction Update - June 2024
June 2024 Inspection Confirms Grand Bleu Tower Reaches 100% Construction Progress at Emaar Beachfront
Snagging, common area paint touch ups, deep cleaning and DEWA meter installation closed out construction at Grand Bleu Tower, certified 100 percent on 12 June 2024.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Grand Bleu Tower Construction Snapshot
An 8.46 point rise from the previous certified reading of 91.54% takes Grand Bleu Tower to 100%, the point where the inspection record stops describing a building site and starts describing a finished building.
Grand Bleu Tower Interiors By Elie Saab
2152
Finished
100%
12 June 2024
10 September 2019
639 residential units
82,856.51 sq m
30 May 2023
Data source: independent progress monitoring inspection conducted on 12 June 2024 for project 2152, tracked against the DLD project register. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: September 2026.
Want to know the day anything on this record changes? Message me on WhatsApp and I will send it to you directly: one message per change, nothing else. Message me on WhatsApp
This Inspection Cycle
Grand Bleu Tower Construction Progress Summary
The last 8.46 points, from 91.54% to the 100% recorded on 12 June 2024, were covered by certification rather than by building: the DCD certificate was issued on 01 May 2024, the BCC by the DDA followed on 31 May 2024, and the inspector found all building construction activities substantially completed with every DEWA water and electrical meter installed. Against that, the register still carries 30 May 2023 as the completion date, so delivery ran roughly a year past the date first recorded.
- Two towers over a shared B+G+MZ+6P base: Tower 1 at 45 residential floors, Tower 2 at 27
- Retail at ground floor level
- All DEWA water and electrical meters installed
- DCD certificate 01 May 2024, BCC by DDA 31 May 2024
- Snagging completed at site ahead of the inspection
- Paint made good in the common areas
- Deep cleaning across the delivered building
- All building construction activities recorded as substantially completed
- Homes released as ready stock rather than off plan sales
- Independent buyer snagging before each unit is accepted
- No further construction cycles while the status stays Completed
Buying After Certification
What 100% Progress Means for Grand Bleu Tower Buyers
A certified reading of 100% removes the variable off plan buyers spend years tracking: there is no construction risk left to price, and no milestone schedule left to pay against. What remains at Grand Bleu Tower is transactional, and four checks matter before money moves.
Verify the escrow account
Any payment to the developer for project 2152 belongs in the DLD regulated escrow account, never in a personal or agency account. Grand Bleu Tower escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Read the SPA against a completed record
An agreement written for a finished building should point at the issued completion certificates and the handover of your own unit, not at future milestones. Not sure how your payment schedule maps to a project already certified at 100%? Send me your SPA schedule and I will map it against the certified record.
Book independent snagging before acceptance
The June 2024 report records the contractor's own snagging as completed at site, which is a delivery sign off and not an inspection carried out for you. Grand Bleu Tower snagging inspection documents defects in your apartment before you accept the keys.
Keep the certified record to hand
A closed inspection history still matters at valuation, resale and title transfer. Grand Bleu Tower construction updates hub holds every published reading for project 2152 in one place.
General framework, not legal advice: completion definitions, acceptance terms, and fee obligations are set by your individual sale and purchase agreement and by the DLD record, and both should be read directly.
Buying at 100%?
Buying after certification removes the construction runway entirely: the structure is certified, the completion certificates are issued, and the only open variable is which finished home is still unsold. Every payment to the developer goes to the DLD-registered escrow account for project 2152, released against certified construction progress.
- Certified 100% on 12 June 2024: no construction risk left to carry
- DCD certificate 01 May 2024, BCC by DDA 31 May 2024
- Handover status Ready: you inspect the actual home, not a floor plan
- Construction risk carried from excavation through to handover
- Two to four years of waiting is the usual delivery horizon
- Longer installment runway, priced at launch levels
06 units listed available on the project page as of this update; availability shifts between cycles.
About the Development
Grand Bleu Tower Project Details

With every construction activity certified complete on 12 June 2024, Grand Bleu Tower is a finished two tower address of 639 homes at Emaar Beachfront, the first ELIE SAAB designer building in the world. Starting prices: AED 2.30M ≈ USD 626K.
The trade off at this stage runs the other way from an off plan entry: no construction runway and no staged discount, against a home you can walk through, value and occupy while handover status reads Ready.
Grand Bleu Tower at Emaar Beachfront Project GuideSite Context This Cycle
Explore Grand Bleu Tower Location on Dubai Map
Grand Bleu Tower occupies plot 3652 in Marsa Dubai, on the Dubai Harbour arm of Emaar Beachfront, where the two towers face open water and the promenade rather than a street grid. That position shapes what the closing cycle had to deliver: the items the 12 June 2024 report records are common area and finishing work, paint made good and deep cleaning, on a building whose beach frontage and retail level had to be presentable on the day the certificates were issued.
The district around it was finished first, which is the part that matters for anyone buying now: 1.5 km of beach, two neighbourhood parks, the marina and yacht club within walking distance, and licensed restaurants nearby, with the Emaar Beachfront mall still ahead. A buyer arriving after certification inherits a working address instead of a construction schedule. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Grand Bleu Tower After Certified Completion
Once the construction file closes, three questions replace it: residency, payment protection, and the condition of the specific apartment. Each resource below is matched to where Grand Bleu Tower stands after the June 2024 reading.

Grand Bleu Tower Construction Updates
This page: the certified June 2024 inspection record for Grand Bleu Tower, closing the construction file.

Grand Bleu Tower at Emaar Beachfront Golden Visa, Interiors by Elie Saab
Grand Bleu Tower at Emaar Beachfront, 639 Emaar units in Marsa Dubai, clears the threshold at all four tiers on transfer.
Read Grand Bleu Tower Golden Visa Guide
Grand Bleu Tower at Emaar Beachfront: A 100% Certified Escrow Account
Grand Bleu Tower at Emaar Beachfront read 100% certified June 2024, DLD project 2152, escrowed at Abu Dhabi Commercial Bank.
Verify Grand Bleu Tower Escrow Account
Grand Bleu Tower at Emaar Beachfront Snagging: Interiors by ELIE SAAB
Grand Bleu Tower at Emaar Beachfront is two Emaar Properties towers of 45 and 27 floors, holding 639 residences.
Book Grand Bleu Tower Snagging InspectionUpdate Timeline
Other Grand Bleu Tower Construction Updates
June 2024 is the first published reading for Grand Bleu Tower and, because it closed the file at 100%, the only construction cycle this project has left to report. The hub keeps it alongside anything the register does next.
Where This Update Fits
Explore Grand Bleu Tower Structure
This report is one node in the wider record: the community the towers stand in, the developer that delivered them, and the listings competing with the homes still unsold.

Emaar Beachfront Properties for Sale
Browse apartments and penthouses for sale in Emaar Beachfront, Dubai's private beach community in Dubai Harbour.
See Emaar Beachfront Properties for Sale
Emaar Beachfront: A Private-Beach Island Community Inside Dubai Harbour
Emaar Beachfront holds 27 residential towers and around 10,000 homes along a private beachfront, with two marinas, retail and dining.
Explore the Emaar Beachfront Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileFAQs
Grand Bleu Tower Construction Progress in June 2024: Frequently Asked Questions
The independent inspection carried out on 12 June 2024 recorded Grand Bleu Tower at 100% construction progress, and the RERA progress status for project 2152 was recorded as Completed.
The previous certified reading was 91.54%. The 12 June 2024 inspection recorded 100%, a gain of 8.46 points covered by close out work rather than construction: snagging, paint made good in the common areas, deep cleaning, and the installation of all DEWA water and electrical meters.
It records that all building construction activities were substantially completed, that the DCD certificate was issued on 01 May 2024 and the BCC by the DDA on 31 May 2024, that all DEWA water and electrical meters were installed, and that snagging, some paint in the common area and deep cleaning were completed at site. The report also carries inspection photographs, which belong to the regulatory file and are not published here.
No. It is a developer rendering of the building and its palm lined promenade, used to identify the project. It shows no cranes, scaffolding, foundations or unfinished structure, and no site photograph of Grand Bleu Tower is published on this page. The evidence behind this update is the inspection record itself, not the picture.
Not while the progress status stays Completed. Inspection cycles are run against construction work, and project 2152 has none left to certify, so the register keeps the 12 June 2024 reading as its closing construction entry. How readings accumulate across the life of a project is covered on the Grand Bleu Tower construction updates hub.
The project moves from construction tracking to ownership. Homes are sold and handed over as finished units rather than off plan, each buyer inspects the actual apartment before accepting it, and the DLD record for project 2152 stands at Completed with 12 June 2024 as its final construction reading.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the June 2024 inspection record for Grand Bleu Tower at Emaar Beachfront correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.