Greenside Residence by Emaar in Dubai Hills Estate construction update June 2026 showing the residential development progress in Dubai - Presented by Tohid Fetrat

Emaar · Dubai Hills Estate · Construction Update

Greenside Residence Construction Update - June 2026

June 2026 Inspection Confirms Greenside Residence Reaches 87.01% Construction Progress in Dubai Hills Estate

Internal finishes, joinery and external envelope work now lead the programme at Greenside Residence, recorded at 87.01 percent in the 04 June 2026 RERA inspection.

Direct advisor access. Every message answered personally, never by a call center.

87.01%Construction Progress
04 June 2026Inspection Date
Q3 2027Expected Completion
2705DLD Project Number

Verified DLD Inspection Data

Greenside Residence Construction Snapshot

A 15.06 point rise since the February 2026 reading leaves Greenside Residence inside the final thirteen points of its programme, the stretch where the register stops measuring whether the buildings get built and starts measuring how ready they are to be handed over.

Project Name

Greenside Residence by Emaar

Project Number

2705

Project Status

Active

Construction Progress

87.01%

Inspection Date

04 June 2026

Construction Start

29 November 2023

Total Units

490 residential units

Built-up Area

45,461.00 sq m

Expected Completion

Q3 2027

Data source: RERA Independent Progress Monitoring Report dated 04 June 2026, tracked against the DLD project register for project 2705. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: July 2026.

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else.

This Inspection Cycle

Greenside Residence Construction Progress Summary

The 04 June 2026 inspection records Greenside Residence at 87.01%, up 15.06 points on the 71.95% logged in February and a wider step than the 11.24 points the previous cycle delivered. Enabling, piling, foundation and structure remain signed off, so the whole of that movement came from envelope, MEP, internal works and finishes: the June photo set shows fitted kitchens, tiled bathrooms and completed corridors rather than bare slabs.

Completed
  • Enabling, piling and foundation works on plot 2453
  • Tower A structure to G+19F+R, Tower B to G+22F+R
  • Shared podium structure at 1B+G+1P+R
  • The 80 percent construction completion payment trigger
In Progress at 87.01%
  • Internal finishes floor by floor through both towers
  • MEP installation behind the finished surfaces
  • External envelope on the remaining tower elevations
  • External works around the podium and landscaped deck
Ahead of Handover
  • The inspection cycles closing the last 12.99 points
  • Building completion certificate procedures
  • Handover from the scheduled Q3 2027 window
Next inspectionPublished in the DLD project register after the next RERA site visit; this page updates with each cycle.
Completion targetQ3 2027 on the developer schedule, roughly fourteen months beyond this inspection date.
Remaining distance12.99 percentage points separate the June 2026 reading from handover readiness.

Payment Linked Progress

What 87.01% Progress Means for Greenside Residence Buyers

Emaar wrote Greenside Residence on a construction linked schedule, so a certified 87.01% is not a status line but a payment fact: the 80 percent trigger sits behind this reading, and the next one written into the published plan is completion itself. Four things are worth doing at this point in the build.

Before Any Remaining Transfer

Verify the escrow account

Money still owed on the unit belongs in the DLD regulated escrow account registered for project 2705, not in any other account offered to you. Greenside Residence escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.

Before the Completion Instalment

Reread your SPA milestone schedule

The published Emaar plan pairs instalments with 20, 40, 60, 80 and 100 percent construction completion, and at 87.01% every trigger except completion has been passed. Not sure what 87.01% has already released against your unit? Send me your SPA schedule and I will map it against the certified milestones.

Ahead of the Handover Notice

Put the snagging inspection in the diary

With the handover window scheduled for Q3 2027, booking is not due yet, though the gap is now short enough to plan around rather than park. Greenside Residence snagging inspection guide sets out when the window actually opens.

Every Cycle

Track the last readings

Under thirteen points remain, which puts completion certification within a small number of inspection cycles. Greenside Residence construction updates hub records each one as it publishes.

General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.

Buying at 87.01%?

At this reading almost nothing about the buildings is still a question: both towers and the podium are signed off, the fit out is running through the floors, and what a buyer is pricing is a delivery date rather than a construction programme. Every payment goes to the DLD-registered escrow account for project 2705, released against certified construction progress.

Entering Now at 87.01%
  • Certified progress: the inspection record above is the risk picture
  • About fourteen months from this reading to the Q3 2027 window
  • 90 percent of the plan already triggered, settled at booking
Typical Launch Entry
  • The full build, excavation to keys, sits on the buyer's side
  • Three to four years is a normal wait from a launch purchase
  • Thinner instalments, set against an unbuilt product
AED 1.98M ≈ USD 539KStarting Price
90/10 Plan10% Due on Completion
From Q3 2027Expected Handover
Ask What Is Available at Greenside Residence

Four units listed available on the project page as of this update; availability shifts between cycles.

About the Development

Greenside Residence Project Details

Greenside Residence by Emaar in Dubai Hills Estate residential buildings with landscaped green terraces balcony gardens and a central park setting in Dubai - Presented by Tohid Fetrat
Dubai Hills Estate · Emaar

Past 87 percent, Greenside Residence is a fit out project rather than a build: 490 one, two and three bedroom apartments in two towers over a shared amenities podium beside the Dubai Hills Golf Club. Starting prices: AED 1.98M ≈ USD 539K.

Entering here means a wait measured in months instead of years, paid for by settling the construction linked instalments already triggered on the unit, with handover scheduled for Q3 2027.

Greenside Residence at Dubai Hills Estate Project Guide

Site Context This Cycle

Explore Greenside Residence Location on Dubai Map

Greenside Residence occupies plot 2453 in Hadaeq Sheikh Mohammed Bin Rashid, on the golf side of Dubai Hills Estate, with Tower A at G+19 and Tower B at G+22 above the shared podium. Both frames topped out cycles ago, so the work carrying this reading has moved indoors, floor by floor, and is largely invisible from the road: what still shows from outside is envelope closure on the upper elevations and the podium deck.

Because the roads, utilities and landscaping around the plot were finished years before this building reached its finishing stage, the external works in this cycle are tie ins to infrastructure that already exists rather than new district construction, which is part of why the remaining programme is concentrated inside the two towers. See the project's position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Greenside Residence at Dubai Hills Estate by Emaar on Dubai Map

Buyer Resources for This Project

Investing in Greenside Residence as Construction Nears Completion

Inside the last thirteen points the questions turn practical: residency eligibility, where the final money sits, and who checks the unit before the keys change hands. Each resource below is matched to where Greenside Residence stands in June 2026.

Greenside Residence by Emaar in Dubai Hills Estate construction updates showing the residential development progress amid landscaped surroundings in Dubai - Presented by Tohid Fetrat
You Are Here

Greenside Residence Construction Updates

This page: the verified June 2026 inspection record for Greenside Residence, at 87.01 percent progress.

Greenside Residence by Emaar in Dubai Hills Estate Golden Visa eligibility concept with the residential development and Golden Visa card in Dubai - Presented by Tohid Fetrat

Greenside Residence Golden Visa

Check which Greenside Residence layouts clear the AED 2M ≈ USD 545K residency threshold.

Read the Greenside Residence Golden Visa Guide
Greenside Residence by Emaar in Dubai Hills Estate escrow account protection concept for buyer payments in Dubai - Presented by Tohid Fetrat

Greenside Residence Escrow Account

Confirm the DLD registered escrow account for project 2705 before releasing the completion instalment.

Verify the Greenside Residence Escrow Account
Greenside Residence by Emaar in Dubai Hills Estate snagging inspection concept for handover quality checks in Dubai - Presented by Tohid Fetrat

Greenside Residence Snagging Inspection

At 87.01 percent, plan independent defect documentation into the months before your handover notice.

Book Greenside Residence Snagging Inspection

Update Timeline

Other Greenside Residence Construction Updates

Every RERA reading is kept on its own page, so the distance travelled between February and June stays visible instead of being smoothed into a single line.

All Greenside Residence Construction Updates

FAQs

Greenside Residence Construction Progress in June 2026: Frequently Asked Questions

As of the RERA inspection carried out on 04 June 2026, Greenside Residence stands at 87.01% construction progress in the DLD project register for project 2705.

The register moved from 71.95% on 13 February 2026 to 87.01% on 04 June 2026, a gain of 15.06 points in under four months and a wider step than the 11.24 points recorded in the previous cycle. All of it came from external envelope, MEP, internal works and internal finishes, since the structural packages were already signed off.

The June 2026 record shows no slippage against the Q3 2027 schedule, with 12.99 percentage points between the 04 June 2026 reading and full certification and roughly fourteen months of programme remaining. Scheduled windows can still be revised between cycles, and any revision would appear in a later update on this cluster. How inspection cycles and completion certification work is covered on the Greenside Residence construction updates hub.

The published Emaar schedule links instalments to 20, 40, 60, 80 and 100 percent construction completion. At 87.01% the 80 percent trigger has been passed, which means the schedule's construction linked instalments are behind this reading and the final 10 percent falls at completion. The amounts and dates that apply to an individual unit are set by that buyer's own SPA.

The 04 June 2026 inspection records enabling, piling, foundation and structure works as complete on Tower A (G+19F+R), Tower B (G+22F+R) and the shared podium, with internal works, external envelope, MEP, internal finishes and external works all progressing. The inspection photographs show fitted kitchen joinery, tiled bathrooms and completed corridors on the floors sampled.

Not by itself. A construction percentage measures build completion, while handover follows testing and commissioning, the building completion certificate, the developer's handover notice and unit acceptance. The register still carries Q3 2027 as of the 04 June 2026 reading, and any change to that window would show up in the DLD record rather than being inferred from the pace of the last cycle.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the June 2026 inspection record for Greenside Residence correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts