GreenVille by Emaar in Emaar South construction updates cover image featuring a project rendering of modern townhouses viewed from a landscaped street in Dubai - Presented by Tohid Fetrat

Emaar · Emaar South

GreenVille at Emaar South Construction Updates

The Verified Build Record for 140 Townhouses in Madinat Al Mataar

GreenVille reached 46.02% construction at its 14 May 2026 RERA inspection, a trajectory that puts Emaar South's 140-townhouse community squarely into its structural phase.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

46.02%Construction Progress
14 May 2026Latest RERA Inspection
140 townhousesTotal Units
Project 3316DLD Registration

Construction Snapshot

GreenVille at Emaar South at a Glance

GreenVille is Emaar's 140-home townhouse enclave on plot 6789 in Madinat Al Mataar, registered with the Dubai Land Department as project 3316 on 04 October 2024 and building since 30 January 2025. Fifteen and a half months separate that start from the 46.02% recorded at the 14 May 2026 inspection, and the six registered values below are what that reading is measured against. Because the 33,771.66 sq m of built-up area is spread as G+1 clusters rather than stacked in a tower, the percentage measures work moving sideways across 140 separate structures at once.

DLD Project Number

3316

Project Status

Active

Construction Start

30 January 2025

Total Units

140 townhouses

Total Built-Up Area

33,771.66 sq m

Registered Completion Date

31 March 2029 (DLD)

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

GreenVille at Emaar South Construction Update Timeline

This record is deliberately short. The register carries one dated inspection for project 3316, 46.02% on 14 May 2026, and it also shows a preceding reading of 30.03% with no inspection date published against it. An undated figure cannot be placed on a timeline honestly, so it stays in this paragraph rather than on the track or in the table, and the 15.99-point difference between the two readings is stated without a measured interval behind it. What the track plots is the one verified position: just short of the halfway mark, with 53.98 points still separating GreenVille from the 31 March 2029 registered completion.

Inspection MonthConstruction ProgressInspection DateFull Update
May 202646.02%14 May 2026View the May 2026 update

Pace Analysis

How Fast GreenVille at Emaar South Has Been Built

With a single dated reading in the register, GreenVille's pace can be averaged but not yet plotted as a curve. One figure is available, and it is a derived rate rather than a measured velocity between inspections:

  • Jan 2025 to May 2026: construction start to the first dated reading, 0% to 46.02%About 3.0 points per month

That 3.0 is arithmetic across the whole 15.5-month window, not a velocity captured between two site visits, and it should be read as an estimate until a second dated inspection allows a real interval to be measured. It is still informative. A townhouse programme averaging three points a month from a standing start is running earthworks, foundations, frames, and first-fix internal packages side by side across clusters, which is exactly the picture the May 2026 inspection notes set out. Held at that average, the remaining 53.98 points would consume roughly eighteen months, comfortably inside the 31 March 2029 registered date, though horizontal builds typically slow once finishing and landscaping take over from structure. For an end user, the useful read is that the delivery window has margin in it; for an investor, the reading already sits above the 40% construction threshold written into the payment schedule, which matters more than the calendar.

Get the Next Inspection Figure First

Tell me you are tracking GreenVille at Emaar South and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About GreenVille at Emaar South at Emaar South Dubai

A percentage means little without knowing what it is building. The project guide sets out what GreenVille owners are waiting on:

GreenVille by Emaar in Emaar South modern two-storey townhouses with covered parking, palm trees and a landscaped street view in Dubai - Presented by Tohid Fetrat

GreenVille at Emaar South: Townhouses Seven Minutes from the Airport

GreenVille at Emaar South is a gated cluster of 140 townhouses, seven minutes from Al Maktoum International Airport.

View the GreenVille at Emaar South Project Guide

Considering an Entry at This Stage?

Availability at GreenVille shifts between inspection cycles as the community moves through structure. If this inspection record is the reason you are here, I can tell you what is left before the next certified reading changes the picture.

Ask About Remaining Availability on WhatsApp

Stage Record

GreenVille at Emaar South Build Stages, Mapped to the Inspections

Each stage below is tied to a window in project 3316's own register rather than to a textbook build sequence, so the position of the 46.02% reading is visible at a glance.

Oct 2024 to Jan 2025

Registration and Handover of Site

Project 3316 was registered with the Dubai Land Department on 04 October 2024, with the escrow account opened at Abu Dhabi Commercial Bank ahead of the 30 January 2025 construction start.

From Jan 2025

Mobilization and Enabling Works

Main contractor mobilization on plot 6789, followed by enabling works and foundations laid out cluster by cluster across the 33,771.66 sq m footprint.

Current PhaseRecorded at 46.02% on 14 May 2026

Substructure and Superstructure

The May 2026 inspection found foundation, substructure, and superstructure packages at differing stages by cluster, with the first internal works already starting inside completed G+1 shells.

Beyond 46.02%

Facades, Systems, and Infrastructure

Community infrastructure was already progressing alongside the plots at the May 2026 reading; facades, services, and internal fit-out carry the record through the 60% and 80% payment triggers.

Toward Q1 2029

Finishing, Landscaping, and Delivery

Interior finishing across all 140 townhouses, then the community garden, play areas, and sports courts, before building completion certification and handover from the 31 March 2029 registered date.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on GreenVille at Emaar South's own record.

Buyer Position

Tracking Your Position at GreenVille at Emaar South

This page is one of four project resources that together cover a GreenVille at Emaar South purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

GreenVille by Emaar in Emaar South construction updates cover image featuring a project rendering of modern townhouses viewed from a landscaped street in Dubai - Presented by Tohid Fetrat
You Are Here

GreenVille at Emaar South Construction Updates

This page: the full inspection history for GreenVille, from the 30 January 2025 start toward handover.

GreenVille by Emaar in Emaar South Golden Visa graphic with a gold card above landscaped lawns and modern townhouses in Dubai - Presented by Tohid Fetrat

GreenVille at Emaar South Golden Visa: Two Townhouse Types, Both Qualifying

GreenVille at Emaar South holds 140 freehold Emaar townhouses; neither the 3 nor 4 bedroom typology sits below the threshold.

Read the GreenVille at Emaar South Golden Visa Guide
GreenVille by Emaar in Emaar South escrow account protection graphic with shield and padlock icons above a landscaped playground and townhouses in Dubai - Presented by Tohid Fetrat

Checking the GreenVille at Emaar South Escrow Before Each Transfer

GreenVille at Emaar South registers 140 units as DLD project 3316, escrowed at Abu Dhabi Commercial Bank, 46.02% certified May 2026.

Verify the GreenVille at Emaar South Escrow Account

Approaching Handover

Between 46.02% and Handover: What GreenVille at Emaar South Buyers Should Do Now

Mid-build is where a townhouse purchase becomes an administrative exercise rather than a waiting game. Payment on this project is released against certified completion percentages, four of them before the final balance, and the register already carried 46.02% in May 2026 against a printed schedule that placed the 40 percent threshold in October 2026. Certified progress is running ahead of the printed dates, which is precisely when payment requests arrive earlier than owners expect.

First, confirm that every remaining instalment routes to the registered escrow account for project 3316 and that each release is tied to a certified reading; the GreenVille escrow account page sets out the account and the milestone mechanics.

Second, keep following the record itself rather than the marketing timeline, because the next dated inspection is what moves the 60% trigger from theory into practice; the GreenVille May 2026 inspection record is the current benchmark to read the next figure against.

Third, if residency is part of your plan, establish eligibility early through the GreenVille Golden Visa guide, since the title deed does not issue until handover and the qualifying route depends on how the purchase is documented before then.

Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore Emaar South Dubai Structure

An inspection percentage describes one plot. What surrounds it decides how the finished townhouse actually lives. These three pages place GreenVille inside Emaar South:

Golf course lifestyle beside modern residences in Emaar South villas and townhouses and apartments for sale community Dubai Presented by Tohid Fetrat

Emaar South Dubai Properties for Sale

Browse apartments, townhouses and villas for sale in Emaar South, with prices, payment plans and availability.

See Emaar South Dubai Properties for Sale
Luxury villas overlooking a manicured golf course with palm lined fairways and landscaped walking paths at Emaar South Dubai Presented by Tohid Fetrat

Emaar South Dubai Community Overview

Read the Emaar South guide: a golf community of apartments, townhouses and villas beside Al Maktoum International Airport.

Explore the Emaar South Dubai Community
Emaar Properties developer showcasing Downtown Dubai skyline with Burj Khalifa and surrounding residential and commercial towers at dusk Presented by Tohid Fetrat

Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities

Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.

View the Emaar Properties Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

GreenVille at Emaar South Construction Updates Frequently Asked Questions

GreenVille is an active DLD-registered project (number 3316) in its structural phase, recorded at 46.02% at the RERA inspection of 14 May 2026. The single dated reading and the register entry behind it are set out in the inspection timeline above.

The 14 May 2026 inspection recorded 46.02%, with the report noting enabling and foundation packages, substructure and superstructure works, and the first internal works, each at a different stage across the clusters, and community infrastructure advancing in parallel. The register also shows an earlier reading of 30.03% with no published inspection date, so the 15.99-point difference cannot be tied to a measured interval. The full report for that cycle is in the GreenVille May 2026 construction update.

From the 30 January 2025 construction start to the 14 May 2026 inspection, 46.02% was recorded across roughly 15.5 months, a derived average of about 3.0 percentage points per month. That is an average over the whole period rather than a velocity measured between two dated inspections, because only one dated reading exists so far. The working is in the pace analysis above.

The DLD-registered completion date for project 3316 is 31 March 2029, placing handover in the first quarter of 2029. That date has not lapsed, and the 46.02% recorded on 14 May 2026 leaves 53.98 points to run inside the registered window. This page's record is updated as each new inspection is published.

DLD registration records show 140 units across a total built-up area of 33,771.66 sq m. The RERA report describes the project as freehold G+1 townhouses split evenly, 70 three-bedroom homes and 70 four-bedroom homes.

Project 3316 was registered with the Dubai Land Department on 04 October 2024, and construction started on 30 January 2025. The first dated inspection in the register, on 14 May 2026, recorded 46.02%.

GreenVille is a G+1 townhouse community rather than a vertical build, so the 46.02% figure aggregates 140 low-rise structures advancing cluster by cluster in two design styles, Lyra and Zora, instead of floor plates completing in sequence. Layouts and facade choices are covered in the GreenVille at Emaar South project guide.

The community sits on plot 6789 in the Madinat Al Mataar district, laid out inside an Emaar South masterplan organised around an 18-hole championship golf course, with Al Maktoum International Airport a short drive north. Community context sits in the Emaar South community guide.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the GreenVille at Emaar South construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

WhatsApp +971543443597
Get the Latest Status