Luxor by Imtiaz Construction Update - September 2026
September 2026 DLD Register Reading Places Luxor by Imtiaz at 90.02% Construction Progress in Jumeirah Village Circle
Internal works, the external envelope, MEP and finishes were progressing at Luxor by Imtiaz when RERA inspected on 17 September 2026, with the register at 90.02 percent.
Direct advisor access. Every message answered personally, never by a call center.
DLD Register Inspection Data
Luxor by Imtiaz Construction Snapshot
A 9.98 point rise over the previous register reading of 80.04%, for which the register shows no date, brings Luxor by Imtiaz into the handover preparation band, where the completion payment and the handover inspection become the live decisions.
Luxor by Imtiaz
2770
Active
90.02%
17 September 2026
11-07-2023
356 residential units
20,177.95 sq m
Q4 2026
Data source: the Dubai Land Department project register reading of 90.02% on the inspection report dated 17 September 2026, read with the RERA Independent Progress Monitoring Report of the same date (Progress Status: Main Contract, Progressing), which prints no percentage of its own. The image at the top of this page is a developer rendering of the planned tower: it illustrates the intended appearance and does not show or verify construction progress. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: September 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Luxor by Imtiaz Construction Progress Summary
The RERA report of 17 September 2026 records the frame of the B+G+4P+31 tower as finished: enabling, foundation, substructure and superstructure works are listed as completed. What moved the register from its earlier 80.04% to 90.02% is work inside and around that frame, which the report describes as progressing at different stages.
- Enabling works on the tower site
- Foundation and substructure works, basement level included
- Superstructure works up to the 31 upper floors, per the RERA report of 17 September 2026
- Internal works across the residential floors and four podium levels
- External envelope of the tower
- MEP systems: mechanical, electrical, and plumbing
- External works around the base of the building
- Internal finishes for apartments Imtiaz lists as fully furnished
- Further DLD register readings toward 100%
- The developer's handover notice, not on file as of this update
- Handover of the 356 residences, expected in Q4 2026
Payment Linked Progress
What 90.02% Progress Means for Luxor by Imtiaz Buyers
Luxor by Imtiaz runs a date-based 60/40 plan rather than a milestone-linked one: by the 17 September 2026 reading all five dated instalments, 60% of the price, had fallen due, and the remaining 40% is the completion payment. At 90.02%, what is left for buyers clusters around that final payment and the handover itself.
Verify the escrow account
The 40% completion payment should go only to the DLD regulated escrow account registered for project 2770 with United Bank Limited, listed on Dubai REST under the register name "Luxur Tower By Imtiaz". Luxor by Imtiaz escrow account verification is the step before that transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA completion clauses
Check how your sale and purchase agreement defines the completion payment, the handover notice period, and any charges due at handover, and map those clauses against the Q4 2026 handover. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Plan the snagging inspection
At 90.02% with handover expected in Q4 2026, Luxor by Imtiaz is inside the usual window to plan your independent snagging inspection, so the furnished apartment is checked before you accept it. The Luxor by Imtiaz snagging inspection guide sets out what to check and when to book.
Track the final readings
The register still has 9.98 points to record before 100%. The Luxor by Imtiaz construction updates hub logs each new reading as it posts, so the run-in to handover stays visible.
General framework, not legal advice: completion payment terms, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 90.02%?
Entering Luxor by Imtiaz at this stage trades payment-plan runway for a short wait: the frame is complete per the RERA report, handover is expected in Q4 2026, and the remaining choice is between the furnished apartments still listed. Every instalment goes to the DLD-registered escrow account for project 2770, released against construction progress recorded in the DLD register.
- Superstructure works completed, per the RERA report of 17 September 2026
- Handover expected in Q4 2026, the quarter after this reading
- Five dated instalments (60%) already due, settled at signing per the developer's current terms; 40% on completion
- Construction risk carried from groundworks through to handover
- A wait of two to four years is the usual delivery horizon
- A longer instalment runway, priced at launch levels
Limited units available per the developer as of this update; availability shifts between cycles.
About the Development
Luxor by Imtiaz Project Details

With superstructure works listed as completed in the RERA report of 17 September 2026, Luxor by Imtiaz is a single B+G+4P+31 tower of 356 studio, 1 and 2 bedroom apartments that Imtiaz lists as fully furnished. Starting prices: AED 750K ≈ USD 204K.
For buyers entering now, the trade off is a short wait against a large single payment at the end: 40% of the price falls due on completion, with handover expected in Q4 2026.
Luxor by Imtiaz Project GuideSite Context This Cycle
Explore Luxor by Imtiaz Location on Dubai Map
Luxor by Imtiaz is a single tower set inside Jumeirah Village Circle, an established and already inhabited community, so the external envelope and external works still open in this cycle are carried out beside occupied neighbouring buildings and live community streets rather than on an open site; the developer's fact sheet also lists direct access to a park, a boundary those external works have to tie into.
Because Jumeirah Village Circle already runs on completed roads and utilities, reached from Al Khail Road, Sheikh Mohammed Bin Zayed Road and Hessa Street, with Sheikh Zayed Road about 15 minutes away per the developer's fact sheet, Luxor by Imtiaz is finishing into a working neighbourhood, which matters for buyers weighing immediate occupancy or rental plans against the Q4 2026 handover. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Luxor by Imtiaz Ahead of the Q4 2026 Handover
At 90.02%, residency questions, the protection of the completion payment, and handover checks all arrive together. Each resource below is matched to where Luxor by Imtiaz stands after the September 2026 reading.

Luxor by Imtiaz Construction Updates
This page: the 17 September 2026 register reading for Luxor by Imtiaz, read against RERA notes.

Luxor by Imtiaz Golden Visa: Each Furnished Apartment Against the Line
No apartment at Imtiaz's Luxor in Jumeirah Village Circle reaches AED 2M alone; the 2 bedroom comes closest, below the threshold.
Read Luxor by Imtiaz Golden Visa Guide
Luxor by Imtiaz Escrow: A 90% Certified JVC Account
Luxor by Imtiaz Developments escrows 361 units with United Bank Limited, DLD project 2770, 90.02% certified in September 2026.
Verify Luxor by Imtiaz Escrow Account
Luxor Snagging in Jumeirah Village Circle
Luxor by Imtiaz is a tower of 356 fully furnished residences in Jumeirah Village Circle, from studios to two bedroom apartments.
Book Luxor by Imtiaz Snagging InspectionUpdate Timeline
Other Luxor by Imtiaz Construction Updates
This September 2026 report is the first monthly page in the Luxor by Imtiaz record; the hub gathers the reading history and adds each new cycle as it posts.
Where This Update Fits
Explore Luxor by Imtiaz Structure
This monthly report is one node in the wider record: the Jumeirah Village Circle community around the tower, the developer delivering it, and the listings competing with it.

Jumeirah Village Circle: Five Imtiaz and Binghatti Towers in New Dubai
Jumeirah Village Circle, Nakheel's freehold ring of ten districts in New Dubai, lists apartments in five Imtiaz and Binghatti towers.
See JVC Properties for Sale
JVC Community Overview
Read the Jumeirah Village Circle guide: Nakheel's freehold community of apartments, townhouses and villas with strong rental yields.
Explore the JVC Community
Imtiaz Developments: Fully Furnished Residences in Dubai Islands, JVC and Meydan
Imtiaz Developments, founded in 2011, has completed and under-construction design led residential projects in Meydan, JVC and Dubai Islands.
View the Imtiaz Developments Developer ProfileFAQs
Luxor by Imtiaz Construction Progress in September 2026: Frequently Asked Questions
The Dubai Land Department project register shows Luxor by Imtiaz at 90.02% construction progress on the inspection report dated 17 September 2026. The RERA Independent Progress Monitoring Report of the same date prints no percentage of its own and gives the Progress Status as Main Contract, Progressing, so the 90.02% figure is the register reading, not a number taken from the report.
Handover is expected in Q4 2026, and the registered completion date of 15-12-2026 in the DLD project register sits inside that quarter; as of the 17 September 2026 reading the register still carried that date. Registered dates can be revised between inspection cycles, so the register should be checked again before any completion payment. How inspection readings lead up to handover is covered on the Luxor by Imtiaz construction updates hub.
It is the figure the DLD register labels Previous Inspection, displayed beside the 90.02% current reading on the report card dated 17 September 2026. The register shows no date for that earlier reading, so this page treats 80.04% as undated and does not work out a monthly pace from the pair; pace on this page is measured only from the 11-07-2023 construction start.
The report of 17 September 2026 lists enabling, foundation, substructure and superstructure works as completed. It lists internal works, the external envelope, MEP (mechanical, electrical and plumbing) systems, external works and internal finishes as progressing at different stages, on a building it describes as a basement, ground floor, four podium levels and 31 upper floors in a concrete structure with blockwork.
No. It is a developer rendering of the planned tower at dusk, used to illustrate the intended appearance of Luxor by Imtiaz; it does not show or verify construction progress. The RERA report of 17 September 2026 carries its own inspection photographs, which are record documents and are not reproduced on this page.
No date is announced in advance: a new figure appears in the DLD project register for project 2770 after the next RERA site visit. At the 17 September 2026 reading, 9.98 percentage points remained before 100%, with 89 days to the registered completion date of 15-12-2026.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the September 2026 inspection record for Luxor correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.