Imtiaz Developments · Jumeirah Village Circle
Luxor Construction Updates
The Register Record of One B+G+4P+31 Tower in Jumeirah Village Circle
Luxor by Imtiaz read 90.02% in the Dubai Land Department register on 17 September 2026, with 9.98 points left before its Jumeirah Village Circle tower reaches handover.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Luxor at a Glance
Luxor by Imtiaz is a single Imtiaz Developments tower in Jumeirah Village Circle, configured as B+G+4P+31 and holding 356 residences. The DLD register dates its construction start to 11-07-2023 and its registration to 20-10-2023, and on 17 September 2026 it recorded 90.02%. Because the whole record belongs to one building rather than a phased masterplan, each reading speaks for all 356 apartments at once, and the handover expected in Q4 2026 falls in the same quarter as the 15-12-2026 registered completion date.
2770
Active
11-07-2023
356 residential units
20,177.95 sq m
15-12-2026 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Luxor Construction Update Timeline
One dated reading anchors this record so far: 90.02% in the Dubai Land Department project register on 17 September 2026, the same day RERA inspected the tower and reported its Progress Status as Main Contract, Progressing. The register also displays an earlier 80.04% as its previous inspection but gives it no date, so that figure sits on the track below as an undated dot and has no table row. The September 2026 update linked in the table carries the full notes for that cycle.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| September 2026 | 90.02% | 17 September 2026 | View the September 2026 update |
Pace Analysis
How Fast Luxor Has Been Built
With a single dated reading on the register, the pace of Luxor by Imtiaz can only be read against its own start date and its registered completion date. Both figures below are arithmetic, not a forecast:
- 11-07-2023 to 17-09-2026: whole build from construction start to 90.02%, over 1,164 daysAbout 2.32 points per month
- 17-09-2026 to 15-12-2026: 9.98 points left after the 90.02% reading, to the registered completion date89 days on the register
Because the register shows the earlier 80.04% reading without a date, this record cannot yet say whether the Luxor build sped up or eased off between inspections; the 2.32 figure simply spreads 90.02 points across the 1,164 days since 11-07-2023. What the RERA report of 17 September 2026 adds is composition rather than speed: the concrete frame over 31 upper floors is listed as complete, and the open items are internal works, the envelope, MEP, external works and finishes. For an end user, the figure to watch is the next dated reading, which will give Luxor its first measured pace between two inspections. For an investor, that same reading will show how the remaining 9.98 points are being closed against the 15-12-2026 registered completion date and the Q4 2026 handover.
Get the Next Inspection Figure First
Tell me you are tracking Luxor and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Luxor at JVC
A register percentage describes the building; the project guide describes what that building delivers. For Luxor by Imtiaz, that is the furnished apartments buyers on this page are tracking toward:

Luxor by Imtiaz: A 31-Floor Furnished Tower in JVC
Luxor by Imtiaz is a Jumeirah Village Circle tower of 356 fully furnished studios and one and two bedroom apartments.
View the Luxor Project GuideConsidering a Late-Stage Entry?
Imtiaz reports limited units available at Luxor, and what remains tends to narrow as a tower moves toward handover. If the record on this page is what brought you here, ask me what is still open before choosing between the studio, 1 and 2 bedroom layouts.
Ask About Remaining Availability on WhatsAppStage Record
Luxor Build Stages, Mapped to the Inspections
Luxor by Imtiaz has one dated reading on record, so the stages below are anchored to the dates the register and the RERA report of 17 September 2026 actually carry rather than to estimated windows: the 11-07-2023 start, the 20-10-2023 registration, the 90.02% reading of 17 September 2026 and the 15-12-2026 registered completion date.
Enabling Works and Foundations
The register dates construction start to 11-07-2023 and registration to 20-10-2023. The RERA report of 17 September 2026 lists enabling and foundation works as completed.
Basement and Substructure
Substructure works beneath the tower, the basement level of the B+G+4P+31 configuration included, are listed as completed in the same RERA report of 17 September 2026.
Concrete Frame to 31 Upper Floors
The frame over the ground floor, four podium levels and 31 upper floors: the RERA report of 17 September 2026 records superstructure works as completed.
Envelope, MEP and External Works
The external envelope, the mechanical, electrical and plumbing systems, and the external works around the base were all progressing at different stages when RERA inspected on 17 September 2026.
Interiors, Furnishing and Handover
Internal works and finishes were progressing at the 90.02% reading of 17 September 2026, ahead of the fully furnished delivery Imtiaz lists and a Q4 2026 handover; the registered completion date is 15-12-2026.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Luxor's own record.
Buyer Position
Tracking Your Position at Luxor
This page is one of four project resources that together cover a Luxor purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Luxor Construction Updates
This page: the DLD register record for project 2770, from the July 2023 start to handover.

Luxor by Imtiaz Golden Visa: Each Furnished Apartment Against the Line
No apartment at Imtiaz's Luxor in Jumeirah Village Circle reaches AED 2M alone; the 2 bedroom comes closest, below the threshold.
Read the Luxor Golden Visa Guide
Luxor by Imtiaz Escrow: A 90% Certified JVC Account
Luxor by Imtiaz Developments escrows 361 units with United Bank Limited, DLD project 2770, 90.02% certified in September 2026.
Verify the Luxor Escrow Account
Luxor Snagging in Jumeirah Village Circle
Luxor by Imtiaz is a tower of 356 fully furnished residences in Jumeirah Village Circle, from studios to two bedroom apartments.
Book Luxor SnaggingApproaching Handover
Between 90.02% and Handover: What Luxor Buyers Should Do Now
With the frame listed as complete in the RERA report of 17 September 2026 and the register at 90.02% that day, what separates Luxor by Imtiaz from handover is interior, envelope, MEP and external work across 356 furnished apartments, plus the 40% completion payment due from every buyer. Developer handover notices commonly leave only a short window to settle the balance and attend the appointment, so the three steps below belong in the run-up to the Q4 2026 handover, not after the notice lands.
First, line up an independent snagging inspection: because Imtiaz lists the apartments as fully furnished, the check runs past tiles and joinery to the supplied furniture, the 65-inch TV and the smart home controls. The Luxor by Imtiaz snagging inspection page explains timing around the handover appointment.
Second, before transferring the 40% balance, match the receiving account to the United Bank Limited escrow registered for project 2770; the Luxor by Imtiaz escrow account page shows how to confirm it on the official record.
Third, if residency is part of the plan, check the threshold arithmetic before the title deed is issued: the largest tier, the 2 bedroom from AED 1.59M ≈ USD 433K, is priced below AED 2M ≈ USD 545K, and the Luxor by Imtiaz Golden Visa guide sets out what that means for an application.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore JVC Structure
The 90.02% reading of 17 September 2026 belongs to one building. These three pages set it beside the Jumeirah Village Circle market, the community around the Luxor plot, and the developer behind the tower:

Jumeirah Village Circle: Five Imtiaz and Binghatti Towers in New Dubai
Jumeirah Village Circle, Nakheel's freehold ring of ten districts in New Dubai, lists apartments in five Imtiaz and Binghatti towers.
See JVC Properties for Sale
JVC Community Overview
Read the Jumeirah Village Circle guide: Nakheel's freehold community of apartments, townhouses and villas with strong rental yields.
Explore the JVC Community
Imtiaz Developments: Fully Furnished Residences in Dubai Islands, JVC and Meydan
Imtiaz Developments, founded in 2011, has completed and under-construction design led residential projects in Meydan, JVC and Dubai Islands.
View the Imtiaz Developments Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Luxor Construction Updates Frequently Asked Questions
Luxor by Imtiaz is an active project in the Dubai Land Department register (project 2770) and read 90.02% complete on 17 September 2026. The RERA report of that date lists superstructure works as completed and gives the Progress Status as Main Contract, Progressing, with internal works, the envelope, MEP, external works and finishes still underway. The dated record is in the Luxor by Imtiaz inspection timeline above.
The register reading dated 17 September 2026 is 90.02%, which is 9.98 points above the 80.04% the register shows as the previous inspection; that earlier figure carries no date, so no monthly rate is taken from the pair. The RERA notes behind the reading are covered in the Luxor by Imtiaz September 2026 construction update.
The Dubai Land Department register carries a registered completion date of 15-12-2026 for project 2770, which sits inside the Q4 2026 handover quarter and is still in the future as of October 2026. At the 90.02% reading of 17 September 2026 that date was 89 days away. Actual handover is confirmed by Imtiaz as final works complete, and this page's record is updated when the closing reading posts.
Luxor by Imtiaz holds 356 residences, studio, 1 and 2 bedroom apartments that Imtiaz lists as fully furnished, in one tower the RERA report describes as B+G+4P+31: a basement, ground floor, four podium levels and 31 upper floors in a concrete structure with blockwork and internal and external finishes. The full unit mix and prices are in the Luxor by Imtiaz project guide.
Spread across the 1,164 days from the 11-07-2023 start to the 90.02% reading of 17 September 2026, the register works out at about 2.32 percentage points per month; that is arithmetic, not a forecast. No pace between inspections can be measured yet because the earlier 80.04% reading has no date. The figures are laid out in the Luxor by Imtiaz pace analysis above.
The Dubai Land Department register gives 11-07-2023 as the construction start and 20-10-2023 as the registration date for project 2770. The first dated reading in this record came on 17 September 2026 at 90.02%, by which point the RERA report listed enabling, foundation, substructure and superstructure works as completed.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Luxor construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.