Marine 1 at DAMAC Riverside Views by DAMAC Properties in DAMAC Riverside project rendering used for the July 2026 construction update showing planned residential buildings, a lagoon and landscaped pedestrian areas in Dubai - Presented by Tohid Fetrat

DAMAC Properties · DAMAC Riverside · Construction Update

Marine 1 at DAMAC Riverside Views Construction Update - July 2026

July 2026 Inspection Records Marine 1 at 11.8% Construction Progress in DAMAC Riverside

Foundation and substructure works stood well advanced at Marine 1 on 16 July 2026, with the superstructure at an early stage and 11.8% on the DLD register.

Direct advisor access. Every message answered personally, never by a call center.

11.8%Construction Progress
16 July 2026Inspection Date
Q2 2028Expected Handover
3372DLD Project Number

DLD Register Inspection Data

Marine 1 at DAMAC Riverside Views Construction Snapshot

11.8% on 16 July 2026, up from a previous reading of 6.02%, places Marine 1 in early-stage construction, the band where escrow, Oqood registration, and the payment schedule weigh more for buyers than the height of the building.

Project Name

Damac Riverside Views - Marine 1

Project Number

3372

Project Status

Active

Construction Progress

11.8%

Inspection Date

16 July 2026

Construction Start

29 January 2025

Total Units

358 residential units

Total Built Area

31,387.16 sq m

Expected Completion

31 May 2028

Data source: Dubai Land Department project register for project 3372, inspection recorded on 16 July 2026 (register dates as shown: registered 19-11-2024, started 29-01-2025, completion 31-05-2028), read with RERA's Independent Progress Monitoring Report of the same date. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. The hero image is a DAMAC project rendering, not a site photograph. Last updated: July 2026.

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

This Inspection Cycle

Marine 1 at DAMAC Riverside Views Construction Progress Summary

Because the register gives no date for the previous 6.02% reading, the July 2026 cycle for Marine 1 can be read for stage but not for speed. What the record does fix is that the main contract was progressing on 16 July 2026, 533 days after the registered construction start, with most of the recorded work still in the foundations and substructure of the G+3P+14+R building.

Completed
  • Enabling works, recorded as completed at the 16 July 2026 inspection
  • Project registration in the DLD register on 19 November 2024
  • Construction start recorded on 29 January 2025
In Progress at 11.8%
  • Mobilisation works, recorded as ongoing
  • Foundation and substructure works at an advanced stage
  • Superstructure of the residential building at an early stage
Ahead of Handover
  • Concrete structure through the ground floor, three podium levels, 14 floors and roof
  • Blockwork and the internal and external finishes named in the DLD description
  • Remaining inspection cycles toward the registered completion date of 31 May 2028
Next inspectionPublished in the DLD project register after the next RERA site visit; no date is announced in advance, and each new reading is added to this cluster with its date.
Registered completion31 May 2028 per the DLD record, inside the Q2 2028 handover window and 685 days after the 16 July 2026 reading.
Remaining distance88.2 percentage points separate the 16 July 2026 reading from 100%.
Arithmetic, not a forecastWhole-build average: 11.8 points over the 533 days from the registered start on 29 January 2025, about 0.66 points per 30-day month. Rate implied by the registered date: 88.2 points over the 685 days to 31 May 2028, about 3.86 points per 30-day month. The registered date is the developer's filing, not a promise.

Payment Plan and Progress

What 11.8% Progress Means for Marine 1 Buyers

The DAMAC Riverside Views regular payment plan schedules its 40 instalments by months from booking rather than by construction milestones, so at 11.8% a Marine 1 buyer's payments follow the calendar while the building is still in its foundations and substructure. Managing that gap between money paid and progress recorded is the work of this stage, and four actions matter most.

Before the Booking Deposit

Verify the escrow account

Every payment toward the price should go only to the DLD regulated escrow account registered for project 3372 with First Abu Dhabi Bank. Marine 1 escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record, under the register name Damac Riverside Views - Marine 1.

Before Signing the SPA

Read your SPA payment schedule

Check how your sale and purchase agreement sets the 20% deposit with the 4% DLD registration fee at booking, the 40 instalments scheduled by months from booking, and the 20% due on completion, and map those clauses against the Q2 2028 handover. DAMAC publishes this as the regular payment plan for DAMAC Riverside Views; confirm the schedule that applies to a Marine 1 unit with DAMAC and in the SPA. Not sure how your instalments line up with this reading? Send me your SPA schedule and I will map it against the recorded milestones.

After Booking

Confirm your Oqood registration

During construction, the Oqood is the DLD record that ties your unit and its price to project 3372. Check that it names the right apartment, area, and price before the instalment run builds up, because it is the reference every later payment and the eventual title deed follow.

Every Cycle

Track the readings to Q2 2028

With 88.2 points between the 16 July 2026 reading and 100%, many inspection readings remain before handover. The Marine 1 at DAMAC Riverside Views construction updates hub records each one with its date.

General framework, not legal advice: payment schedules, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.

Buying at 11.8%?

Entering a project at 11.8% trades certainty for runway: most of the build is still ahead and the building exists on DAMAC's renderings and plan, while the payment plan spreads 60% across 40 instalments before the 20% due on completion. Every payment goes to the DLD-registered escrow account for project 3372, released against construction progress as recorded in the DLD register.

Entering Now at 11.8%
  • Foundations and substructure well advanced as of 16 July 2026
  • Handover expected in Q2 2028, with most of the build still to come
  • 20% plus the 4% DLD registration fee at booking, then 40 instalments by months from booking
Typical Near-Handover Entry
  • Structure largely in place, so less construction risk is carried
  • A shorter wait between booking and the keys
  • Less instalment runway, with more of the price due close together
AED 1.10M ≈ USD 300KStarting Price
20/60/20 Plan20% Due on Completion
Q2 2028Expected Handover
Ask What Is Available at Marine 1

Units are listed as available on the project page as of this update; availability shifts between cycles.

About the Development

Marine 1 at DAMAC Riverside Views Project Details

Marine 1 at DAMAC Riverside Views by DAMAC Properties in DAMAC Riverside project rendering of multi-storey residential buildings with balconies beside a landscaped swimming pool at dusk in Dubai - Presented by Tohid Fetrat
DAMAC Riverside · DAMAC Properties

With foundations and substructure well advanced and the superstructure at an early stage as of 16 July 2026, Marine 1 is a G+3P+14+R building of 358 one and two bedroom apartments in DAMAC Riverside Views. Starting prices: AED 1.10M ≈ USD 300K.

For buyers entering at this stage, the trade off is a long run of 40 instalments scheduled by months from booking against the wait to a Q2 2028 handover; the image here is a DAMAC rendering of the planned setting, not the site today.

Marine 1 at DAMAC Riverside Views Project Guide

Site Context This Cycle

Explore Marine 1 at DAMAC Riverside Views Location on Dubai Map

Marine 1 carries its own DLD registration inside DAMAC Riverside Views, the group of apartment buildings that DAMAC's master plan sets within DAMAC Riverside in Dubai Investment Park 2. In July 2026 the work on its plot was still at and below ground level: the inspection recorded mobilisation ongoing and foundations and substructure at an advanced stage, the phase that fixes the building's footprint before the three podium levels rise.

DAMAC's DAMAC Riverside Views factsheet puts the community about 12 minutes' drive from Al Maktoum International Airport and from the Expo 2020 site, 14 from DAMAC Mall, 16 from Global Village and 19 from Dubai Outlet Mall (community figures, not specific to Marine 1). The amenities in DAMAC's materials are presented as planned and subject to final design, so buyers weighing occupancy or rental plans for Q2 2028 should judge the area on what is open at handover, not on renderings. See the building's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Marine 1 at DAMAC Riverside Views on Dubai Map

Buyer Resources for This Project

Investing in Marine 1 at DAMAC Riverside Views During Early-Stage Construction

The early-stage band is where payment protection, registration, and residency questions are settled while most of the price is still ahead. Each resource below is matched to where Marine 1 stands at 11.8%.

Marine 1 at DAMAC Riverside Views by DAMAC Properties in DAMAC Riverside construction updates cover image featuring a project rendering of a residential building overlooking an outdoor pool and landscaped terrace in Dubai - Presented by Tohid Fetrat
You Are Here

Marine 1 at DAMAC Riverside Views Construction Updates

This page: the 16 July 2026 DLD register reading for Marine 1, from enabling works upward.

Marine 1 at DAMAC Riverside Views by DAMAC Properties in DAMAC Riverside Golden Visa concept graphic with a gold card over an aerial rendering of residential buildings and a landscaped waterway in Dubai - Presented by Tohid Fetrat

Marine 1 Golden Visa: Two Apartment Types Short of AED 2M

Neither apartment type at Marine 1 at DAMAC Riverside Views, a DAMAC Properties building, reaches the AED 2M Golden Visa threshold.

Read the Marine 1 Golden Visa Guide
Marine 1 at DAMAC Riverside Views by DAMAC Properties in DAMAC Riverside escrow account concept graphic showing a shield and padlock over an aerial rendering of buildings beside a landscaped waterway in Dubai - Presented by Tohid Fetrat

Marine 1 Escrow Account: First Abu Dhabi Bank, Plot 1289

Marine 1 at DAMAC Riverside Views, DLD project 3372, escrows with First Abu Dhabi Bank and read 11.8% in July 2026.

Verify the Marine 1 Escrow Account

Update Timeline

Other Marine 1 at DAMAC Riverside Views Construction Updates

July 2026 is the first monthly record for Marine 1 on this cluster; each later reading joins the timeline with its own date, so the building's progress can be followed cycle by cycle.

All Marine 1 at DAMAC Riverside Views Construction Updates

FAQs

Marine 1 at DAMAC Riverside Views Construction Progress in July 2026: Frequently Asked Questions

The Dubai Land Department project register lists Marine 1, registered as project 3372 under the name Damac Riverside Views - Marine 1, at 11.8% construction progress, recorded on 16 July 2026. That is up from a previous reading of 6.02%, which the register does not date, and RERA's progress status for the same inspection is Main Contract - Progressing.

Yes. The completion date in the DLD project register is the developer's filing, not a promise, and it can be revised between inspection cycles. As recorded on 16 July 2026 it is 31 May 2028, inside the Q2 2028 handover window, with 88.2 percentage points of the build still to be recorded; any revision would appear in a later reading. How inspection cycles lead to handover is covered on the Marine 1 at DAMAC Riverside Views construction updates hub.

RERA's Independent Progress Monitoring Report for the 16 July 2026 inspection recorded mobilisation works as ongoing, enabling works as completed, foundation and substructure works progressing at an advanced stage, and the superstructure progressing at an early stage. The same report describes the project as a G+3P+14+R residential building, meaning a ground floor, three podium levels, 14 floors and a roof level, designed with a concrete structure and block with internal and external finishes.

It is the progress status printed in RERA's monitoring report for the 16 July 2026 inspection, and it records that works under the main construction contract were moving on that date, after the enabling works recorded as completed. The status carries no percentage and no completion date of its own, so it is read together with the 11.8% register reading and the registered completion date of 31 May 2028.

The DLD app's inspection card for Marine 1 shows 6.02% as the previous inspection beside the 11.8% current progress dated 16 July 2026, but it displays no date for the earlier figure. Without a date, the change between the two readings cannot be turned into a monthly pace, so 6.02% serves only as a reference point; the one rate printed on this page is the whole-build average from the registered start on 29 January 2025, labelled as arithmetic, not a forecast.

No. The hero image and the other project images on this page are DAMAC renderings of the planned building and its setting, not photographs of the site. The register record for the 16 July 2026 inspection carries inspection photographs; they belong to the official record and are not reproduced here.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the July 2026 inspection record for Marine 1 at DAMAC Riverside Views correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts