Marine 4 at DAMAC Riverside Views by DAMAC Properties in DAMAC Riverside Views project rendering used for the August 2026 construction update showing a planned multi-storey residential building and reflecting pool in Dubai - Presented by Tohid Fetrat

DAMAC Properties · DAMAC Riverside · Construction Update

Marine 4 at DAMAC Riverside Views Construction Update - August 2026

August 2026 Inspection Records Marine 4 at 21.17% Construction Progress in DAMAC Riverside

Foundations substantially complete, superstructure under way and early MEP works marked the 26 August 2026 inspection of Marine 4, recorded at 21.17 percent in the DLD register.

Direct advisor access. Every message answered personally, never by a call center.

21.17%DLD Register Reading
26 August 2026Inspection Date
Q1 2029Expected Handover
3375DLD Project Number

Dated DLD Inspection Data

Marine 4 at DAMAC Riverside Views Construction Snapshot

21.17% recorded on 26 August 2026, up from a previous reading of 9.17% puts Marine 4 in the superstructure band of early-stage construction, where the dated register reading is the clearest independent check a buyer has between instalments.

Project Name

Marine 4 at DAMAC Riverside Views

Project Number

3375

Project Status

Active

Construction Progress

21.17%

Inspection Date

26 August 2026

Construction Start

29 January 2025

Total Units

276 residences

Total Built Area

22,421.49 sq m

Expected Completion

Q1 2029

Data source: DLD project register reading recorded on 26 August 2026 for project 3375, "Damac Riverside Views - Marine 4", and the RERA Independent Progress Monitoring Report for the same inspection, which prints no percentage of its own. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. The hero image is a DAMAC rendering, not a site photograph. Last updated: August 2026.

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

This Inspection Cycle

Marine 4 at DAMAC Riverside Views Construction Progress Summary

Between an undated previous reading of 9.17% and the 21.17% recorded on 26 August 2026, the DLD register added 12 points to Marine 4, the G+2P+8 residential building that the RERA report describes as a concrete structure and block, designed with internal and external finishes. Because the earlier reading carries no date, the gain is stated as a difference only, never as a monthly pace.

Completed
  • DLD project registration on 22 November 2024
  • Registered construction start on 29 January 2025
  • Enabling and foundation works, reported substantially complete at the 26 August 2026 inspection
In Progress at 21.17%
  • Mobilisation works on site
  • Substructure and superstructure works at different stages
  • MEP works at an early stage alongside the structure
  • Main contract progressing, per the RERA report
Ahead of Handover
  • Remaining superstructure of the ground, two podium and eight floor building
  • Block work with internal and external finishes
  • Remaining RERA inspection cycles toward 100%
  • Registered completion date 31 May 2028; expected handover Q1 2029
Next inspectionPublished in the DLD project register after the next RERA site visit; the record sets no date for it, and this page updates with each cycle.
Completion targetThe DLD record lists a registered completion date of 31 May 2028; the expected handover for Marine 4 is Q1 2029. The contractual completion date is the one in the SPA.
Remaining distance78.83 percentage points remain after the 26 August 2026 reading. Arithmetic, not a forecast: since the registered start on 29 January 2025 (574 days) the build has averaged about 1.11 points per 30-day month; reaching 100% by the registered completion date of 31 May 2028 (644 days after the reading) works out to about 3.67 points per month, and by the end of Q1 2029 (948 days) to about 2.49.

Payments and Progress

What 21.17% Progress Means for Marine 4 Buyers

The regular payment plan for Marine 4 schedules its instalments by months from booking rather than by construction milestones, so a reading of 21.17% does not trigger a payment on its own: it shows how far the building has moved while your instalments keep falling due. At this stage of Marine 4, four checks matter most.

Before Each Instalment

Verify the escrow account

Every instalment should go only to the DLD regulated escrow account registered for project 3375, "Damac Riverside Views - Marine 4", held with First Abu Dhabi Bank. Marine 4 escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.

Before You Sign

Read your SPA payment schedule

The DAMAC Riverside Views regular payment plan sets 20% plus the 4% DLD registration fee on booking, 60% in 40 instalments after booking and 20% on completion; check how your sale and purchase agreement dates each one against the Q1 2029 handover. Not sure how your instalments line up with this reading? Send me your SPA schedule and I will map it against the recorded milestones.

After Booking

Register the Oqood

Off-plan purchases at Marine 4 are recorded with the DLD through Oqood registration, and the 4% DLD registration fee paid at booking goes to the DLD, not into escrow. Check that the registration shows your apartment under project 3375 before the next instalment falls due.

Every Cycle

Track the remaining cycles

With 78.83 points still to be recorded, many inspection readings lie ahead of handover. The Marine 4 construction updates hub keeps every dated reading in one place.

General framework, not legal advice: instalment dates, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly. This is DAMAC's regular payment plan for the DAMAC Riverside Views release that includes Marine 4; confirm the schedule that applies to your unit with DAMAC and in the SPA.

Buying at 21.17%?

Entering Marine 4 during early-stage construction trades certainty for payment-plan runway: at the 26 August 2026 inspection the foundations were reported substantially complete and the superstructure was under way, while the full instalment schedule runs from your own booking date. Every instalment goes to the DLD-registered escrow account for project 3375, released against construction progress.

Entering Now at 21.17%
  • A dated DLD register reading and a RERA report on record for the site
  • Foundations reported substantially complete on 26 August 2026
  • 20% plus the 4% DLD registration fee at booking, then 40 instalments by months from booking
Typical Near-Handover Entry
  • Most construction risk retired before the purchase
  • Months rather than years to the handover date
  • A shorter runway to spread the remaining payments
AED 880K ≈ USD 240KStarting Price
80/20 Plan20% Due on Completion
Q1 2029Expected Handover
Ask What Is Available at Marine 4

Units listed available on the project page as of this update, with no quantity stated; availability shifts between cycles.

About the Development

Marine 4 at DAMAC Riverside Views Project Details

Marine 4 at DAMAC Riverside Views by DAMAC Properties in DAMAC Riverside Views project rendering of a landscaped blue waterway between residential buildings and pedestrian promenades at dusk in Dubai - Presented by Tohid Fetrat
DAMAC Riverside · DAMAC Properties

With foundations reported substantially complete and the superstructure under way at the 26 August 2026 inspection, Marine 4 is an early-stage build of 276 one and two bedroom apartments in DAMAC Riverside, Dubai Investment Park 2. Starting prices: AED 880K ≈ USD 240K.

For buyers entering at this stage, the trade off is a longer wait for keys against the full instalment runway of the 20/60/20 plan, with handover expected in Q1 2029.

Marine 4 at DAMAC Riverside Views Project Guide

Site Context This Cycle

Explore Marine 4 at DAMAC Riverside Views Location on Dubai Map

Marine 4 is one building of the DAMAC Riverside Views collection inside DAMAC Riverside, the Dubai Investment Park 2 community that DAMAC's materials organise around a landscaped Green Vein and a waterfront Water Vein. That setting frames this cycle: the RERA report for the inspection described substructure and superstructure works still progressing, so the waterways, promenades and planned amenities in DAMAC's renderings are future works, not part of the 21.17% recorded on 26 August 2026.

DAMAC's investment presentation cites direct access to the E311 and E611 highways, and its factsheet puts the Expo 2020 site and Al Maktoum International Airport each about 12 minutes' drive away (community figures, not specific to Marine 4), so the road links exist today while the surrounding DAMAC Riverside amenities remain planned, which matters for buyers weighing occupancy or rental plans against a Q1 2029 handover. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Marine 4 on Dubai Map

Buyer Resources for This Project

Investing in Marine 4 at DAMAC Riverside Views During Early Construction

Early-stage construction is when escrow checks and Golden Visa questions are best settled, before most of the instalment schedule has been paid. Each resource below is matched to where Marine 4 stands after the 26 August 2026 inspection.

Marine 4 at DAMAC Riverside Views by DAMAC Properties in DAMAC Riverside Views construction updates cover image featuring a project rendering of a multi-storey residential building with balconies and palm trees in Dubai - Presented by Tohid Fetrat
You Are Here

Marine 4 Construction Updates

This page: the 26 August 2026 DLD register reading for Marine 4, with the reported works.

Marine 4 at DAMAC Riverside Views by DAMAC Properties in DAMAC Riverside Views Golden Visa concept graphic displaying a gold visa card in front of a rendered residential building and outdoor pool in Dubai - Presented by Tohid Fetrat

Marine 4 Golden Visa: How 1 and 2 Bedroom Apartments Compare

Marine 4 at DAMAC Riverside Views, a DAMAC Properties building, has no single apartment type that reaches the AED 2M threshold.

Read Marine 4 Golden Visa Guide
Marine 4 at DAMAC Riverside Views by DAMAC Properties in DAMAC Riverside Views escrow account concept graphic with a shield and padlock above a rendered landscaped waterway and residential buildings in Dubai - Presented by Tohid Fetrat

Marine 4 Escrow Account: DAMAC MRY Investment and First Abu Dhabi Bank

Marine 4 at DAMAC Riverside Views escrows 276 residential units under DLD project 3375, certified 21.17% in August 2026.

Verify Marine 4 Escrow Account

Update Timeline

Other Marine 4 at DAMAC Riverside Views Construction Updates

August 2026 is the first dated monthly record for Marine 4 on this site; the hub collects every reading as the building moves from superstructure toward finishes.

All Marine 4 Construction Updates

FAQs

Marine 4 at DAMAC Riverside Views Construction Progress in August 2026: Frequently Asked Questions

The DLD project register records Marine 4 at 21.17% after the inspection of 26 August 2026, under project 3375, "Damac Riverside Views - Marine 4". The RERA Independent Progress Monitoring Report for the same visit gives the progress status as "Main Contract - Progressing", meaning the main construction contract is under way on site rather than enabling or preparatory works alone; that report prints no percentage of its own, so 21.17% is the register's figure.

Yes. The DLD record lists a registered completion date of 31 May 2028; the expected handover for Marine 4 is Q1 2029. The contractual completion date is the one in the SPA. Registered dates in the DLD project register can be revised between inspection cycles, so the date shown here reflects the record as of the 26 August 2026 inspection, and any revision would appear in a later monthly update.

According to the RERA report for that inspection, mobilisation works were ongoing, enabling and foundation works were substantially completed, substructure and superstructure works were progressing at different stages, and MEP works were progressing at an early stage alongside the structure. The same report describes Marine 4 as a G+2P+8 residential building, ground plus two podium levels plus eight floors, with a concrete structure and block, designed with internal and external finishes.

The DLD register lists 9.17% as the previous inspection for Marine 4 but gives no date for that reading, so the 12 point difference to the 21.17% recorded on 26 August 2026 cannot be converted into a monthly pace. This page therefore shows 9.17% as an undated dot on the progress track only; a measured pace needs two dated readings, which become available from the next dated inspection of project 3375 onward.

No. The image at the top of this page is a DAMAC project rendering of the planned building with a reflecting pool; it is not a photograph of the site and shows no construction progress. The register record for the 26 August 2026 inspection carries inspection photographs, which are RERA record material and are not republished on this page.

The 21.17% figure was recorded on 26 August 2026 and is the latest reading this page reflects. RERA inspects registered projects in cycles, so a newer reading may exist: searching project 3375 or the register name "Damac Riverside Views - Marine 4" in the Dubai REST app shows the current figure. Every dated reading is collected on the Marine 4 construction updates hub.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the August 2026 inspection record for Marine 4 at DAMAC Riverside Views correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts