Maybach 6 Residences construction update night view of illuminated towers and development progress in Dubai Presented by Tohid Fetrat

Binghatti · Mercedes-Benz Places | Binghatti City

Vision Mercedes-Maybach 6 Residences Construction Updates

The Dated DLD Record for Towers 4 and 5 of Binghatti City

Vision Mercedes-Maybach 6 Residences opened its DLD register record at 0% on 29 December 2025, the pre-construction baseline every later Towers 4 and 5 reading starts from.

Construction tracking against RERA inspection data, updated after every recorded inspection.

Direct advisor access. Every message answered personally, never by a call center.

0%Construction Progress
29 December 2025Latest RERA Inspection
1,844 residencesTotal Units
Project 4321DLD Registration

Construction Snapshot

Vision Mercedes-Maybach 6 Residences at a Glance

Vision Mercedes-Maybach 6 Residences puts 1,844 residences into two Binghatti towers, labelled Tower 4 and Tower 5 in the Mercedes-Benz Places | Binghatti City plan for Nad Al Sheba. Its record is unusually short and unusually early: one DLD register reading of 0% on 29 December 2025, taken sixteen days before the register lists the project as registered and started on 14 January 2026. Because both towers stand on a single shared basement, ground, mezzanine and five-level parking base, the first readings above zero here will largely measure work on that common base rather than on either tower alone.

DLD Project Number

4321

Project Status

Active

Construction Start

14 January 2026 (DLD)

Total Units

1,844 residences

Total Built-Up Area

91,523.58 sq m

Registered Completion Date

31 August 2027 (DLD)

Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.

Inspection Record

Vision Mercedes-Maybach 6 Residences Construction Update Timeline

The record for Towers 4 and 5 holds a single dated entry: the inspection of 29 December 2025, entered in the DLD register at 0%, with the monitoring report from that visit giving a Progress Status of N/A and finding the plot without any construction under way. That is why the only dot on the track below sits at its left edge, and why the table has one row, linking the December 2025 update that documents the visit.

Inspection MonthConstruction ProgressInspection DateFull Update
December 20250%29 December 2025View the December 2025 update

Pace Analysis

How Fast Vision Mercedes-Maybach 6 Residences Has Been Built

Pace is measured between two dated readings, and this record holds one. What can be set out precisely are the dated anchors that the first real pace figure will be read against:

  • 29 Dec 2025: first DLD register reading, taken with no construction under way on plot 10830%, no pace yet
  • 14 Jan 2026: project registered and construction started, per the DLD registerStart on record
  • 31 Aug 2027: completion date registered for project 4321Register date
  • Q4 2028: the handover quarter Binghatti states for Towers 4 and 5Expected handover

A single point has no slope. The 0% of 29 December 2025 was logged sixteen days before the register's 14 January 2026 start date, so it describes the plot before work began rather than any early rate of work, and dividing it by the months since would produce a number with no meaning. The first genuine pace figure for Maybach 6 arrives with the second dated reading: the points it records, divided by the months elapsed since 29 December 2025. Until then the two forward dates stand side by side exactly as recorded, the 31 August 2027 registered completion and the Q4 2028 expected handover, with neither adjusted here. An end user planning a move and an investor weighing delivery risk both learn more from that second reading than from anything that can be computed today.

Get the Next Inspection Figure First

Tell me you are tracking Vision Mercedes-Maybach 6 Residences and I will send you the next recorded figure and site photos directly, ahead of the page update.

Get the Next Update on WhatsApp

Project Profile

About Vision Mercedes-Maybach 6 Residences at Binghatti City

A reading taken before construction only makes sense next to what is being delivered. The full project guide covers what buyers of Towers 4 and 5 are tracking toward on this page:

Sunset aerial view of Mercedes-Benz Places at Binghatti City with stepped high-rise towers and landscaped podium courtyards. Presented by Tohid Fetrat.

Vision Mercedes-Maybach 6 Residences: Towers 4 and 5 of Binghatti City

Vision Mercedes-Maybach 6 Residences is a Binghatti City project in Nad Al Sheba of 1,844 studio to three bedroom apartments.

View the Vision Mercedes-Maybach 6 Residences Project Guide

Considering a Pre-Construction Entry?

Availability at Maybach 6 will keep moving as Binghatti releases and sells units through the build. If the record on this page is what brought you here, ask me for current availability while the project still sits at its December 2025 baseline.

Ask About Remaining Availability on WhatsApp

Stage Record

Vision Mercedes-Maybach 6 Residences Build Stages, Mapped to the Inspections

Each stage below is tied to the window it occupies in this project's own record. With one reading on file, only the first stage carries a dated inspection; the other four show the register and Binghatti dates they will be measured against, and gain inspection dates as readings for Towers 4 and 5 publish.

Current Phase29 Dec 2025, 0% at last reading

Pre-Construction Baseline

The only inspection on file: 0% in the DLD register and a Progress Status of N/A in the monitoring report, with plot 1083 still clear of construction.

From 14 Jan 2026, registered start

Enabling Works and Shared Base

The register's start date opens this window; no reading yet records work on the basement, ground, mezzanine and five parking levels both towers share.

Awaiting dated readings

Two Residential Towers Rising

The residential floors of the pair, the taller reaching 34, rise above the shared base; this window gains dates once readings record the structure.

Awaiting dated readings

Facade, Fit-Out and Retail Podium

Enclosure, apartment fit-out and the ground-floor retail level follow the structure; no inspection on the Maybach 6 record has reached this stage.

Toward the Q4 2028 handover

Finishing, Commissioning and Handover

Final finishing and building systems ahead of the Q4 2028 handover Binghatti states, with 31 August 2027 on the DLD register as the registered completion date.

What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Vision Mercedes-Maybach 6 Residences's own record.

Buyer Position

Tracking Your Position at Vision Mercedes-Maybach 6 Residences

This page is one of four project resources that together cover a Vision Mercedes-Maybach 6 Residences purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Maybach 6 Residences construction update night view of illuminated towers and development progress in Dubai Presented by Tohid Fetrat
You Are Here

Vision Mercedes-Maybach 6 Residences Construction Updates

This page: the DLD register record for Maybach 6, from its December 2025 baseline to handover.

Maybach 6 Residences Golden Visa concept with luxury towers and Dubai skyline view Presented by Tohid Fetrat

Vision Mercedes-Maybach 6 Residences Golden Visa From the One Bedroom

Binghatti's Vision Mercedes-Maybach 6 Residences, 1,844 residences in Nad Al Sheba, qualifies at 1, 2 and 3 bedrooms but not studio.

Read the Vision Mercedes-Maybach 6 Residences Golden Visa Guide
Maybach 6 Residences escrow account concept with aerial masterplan view and secure investment symbol in Dubai Presented by Tohid Fetrat

Vision Mercedes-Maybach 6 Residences Escrow: Binghatti City's 1878-Unit Account

Vision Mercedes-Maybach 6 Residences, DLD project 4321, escrows 1878 units at Dubai Islamic Bank, 0% certified December 2025.

Verify the Vision Mercedes-Maybach 6 Residences Escrow Account

Approaching Handover

Between 0% and Handover: What Vision Mercedes-Maybach 6 Residences Buyers Should Do Now

Vision Mercedes-Maybach 6 Residences sits at the very start of its record, a 0% register reading from 29 December 2025 followed by a registered start on 14 January 2026, so the useful moves now concern where your money goes and what the next reading has to show, not handover preparation. Every payment made before a second reading publishes is made against a record that still shows that December 2025 baseline, which is why the three checks below belong before your next instalment rather than after the next inspection.

First, match every instalment you are asked to pay against the release rules on the Maybach 6 escrow account page, so money reaches the account registered to DLD project 4321 and nowhere else.

Second, if residency is part of the plan, check your layout against the AED 2M line in the Maybach 6 Golden Visa guide before you commit, since the studio tier sits below it.

Third, follow each reading as it is dated: the Maybach 6 December 2025 construction update documents the baseline visit, and the next monthly update is the first that can show work on the Towers 4 and 5 plot.

Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.

The Wider Picture

Explore Binghatti City Structure

A build record is only half the picture; the other half is what rises around it. These three pages set the Maybach 6 record in its branded city, community, and developer context:

Aerial masterplan view of Mercedes Benz Places Binghatti City properties for sale in Dubai with residential towers and landscaped community spaces, Presented by Tohid Fetrat

Mercedes-Benz Places: Binghatti's Branded Residential City in Meydan

Mercedes-Benz Places Binghatti City offers apartments across 3 branded projects in Meydan: Vision Iconic and both Mercedes-Maybach residences.

See Binghatti City Properties for Sale
Binghatti City skyline at sunset featuring Mercedes-Benz Places, a landmark branded residential city in Dubai with iconic high-rise towers. Presented by Tohid Fetrat.

Binghatti City Community Overview

Explore the Mercedes-Benz Places Binghatti City community in Meydan, including its masterplan, branded residential towers, location, connectivity, developer, and luxury lifestyle vision.

Explore the Binghatti City Community
Binghatti luxury towers in Dubai – Bugatti Residences, Mercedes-Benz Places, and Skyblade by Binghatti, representing iconic branded architecture and innovation, presented by Tohid Fetrat.

Binghatti: Record Construction Speed and Branded Towers With Bugatti and Mercedes-Benz

Binghatti has delivered more than 60 projects since 2008, with 27 under development and two master communities across Dubai.

View the Binghatti Developer Profile

Construction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.

FAQs

Vision Mercedes-Maybach 6 Residences Construction Updates Frequently Asked Questions

Vision Mercedes-Maybach 6 Residences is an active DLD-registered project (number 4321) whose only reading on record is 0%, entered in the DLD register at the inspection of 29 December 2025, when the site showed no construction under way. The register lists the project as registered and started on 14 January 2026; the reading was about nine months old at this update, and the full record is in the inspection timeline above.

The history of Vision Mercedes-Maybach 6 Residences holds one entry: 0% in the DLD register on 29 December 2025. No earlier reading exists, so no point change can be stated; the RERA monitoring report filed for that inspection lists its Progress Status as N/A. That visit is documented in the Vision Mercedes-Maybach 6 Residences December 2025 update.

A pace figure for Vision Mercedes-Maybach 6 Residences needs two dated readings, and the record has one: 0% on 29 December 2025, logged before the 14 January 2026 start date in the DLD register. The first measurable pace will be the points recorded at the next dated inspection divided by the months elapsed since 29 December 2025, and it will be set out in the pace section once that reading publishes.

The DLD register records a completion date of 31 August 2027 for Vision Mercedes-Maybach 6 Residences (project 4321), while the expected handover Binghatti states is Q4 2028. Both are shown exactly as recorded, with neither adjusted; the registered date had not passed at this update, and the 0% reading of 29 December 2025 is the only progress figure on record against either date.

Vision Mercedes-Maybach 6 Residences comprises 1,844 residences, from studios to three bedroom apartments, split across the two towers Binghatti numbers 4 and 5, with retail at ground level. Per Binghatti's fact sheet, the two residential towers stand on a shared basement, ground, mezzanine and five parking levels, the taller of them rising 34 residential floors.

The DLD register gives 14 January 2026 as the construction start date for Vision Mercedes-Maybach 6 Residences, the same day it lists the project as registered. The first tracked inspection, dated 29 December 2025, came before that start and recorded 0%; both dates appear on this page exactly as the register holds them.

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is keeping the Vision Mercedes-Maybach 6 Residences construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

WhatsApp +971543443597
Get the Latest Status