Piazza Roma at DAMAC Lagoons Construction Updates
Two Office Towers in the DAMAC Lagoons District, Tracked From the First Enabling Works
Piazza Roma read 0.2% in the DLD register at the 18 August 2026 inspection, the first figure for two DAMAC Lagoons office towers still at enabling works.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Piazza Roma at DAMAC Lagoons at a Glance
Piazza Roma at DAMAC Lagoons by DAMAC is a two-tower office project of 336 units, entered on the Dubai Land Department register as project 4379 on 23 February 2026 under the registered developer Island Oasis Properties, with its escrow trust account at Abu Dhabi Commercial Bank (ADCB). Construction was registered as starting on 30 July 2026, and the first figure above zero, 0.2% on 18 August 2026, came only 19 days later, so this record opens almost on the day works began. The RERA project description fixes what it will measure: Tower A and Tower B, with retail on the basement, ground and first two floors and seven office floors above plus a roof, the office side of the DAMAC Lagoons District.
4379
Active
30 July 2026
336 units
74,727.08 sq m
30 June 2030 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Piazza Roma at DAMAC Lagoons Construction Update Timeline
The Piazza Roma record holds one dated reading so far: 0.2% in the DLD register after the RERA inspection of 18 August 2026, which came 19 days into works the register dates from 30 July 2026. The register's previous-inspection field shows 0% with no date beside it, so that baseline sits on the track below as an unlabelled dot rather than a table row. For that August visit the RERA report gives a status, Enabling Works, Progressing, with no percentage beside it, and each later reading will join the track and the table with its monthly update linked.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| August 2026 | 0.2% | 18 August 2026 | View the August 2026 update |
Pace Analysis
How Fast Piazza Roma at DAMAC Lagoons Has Been Built
With a single dated reading on the Piazza Roma record, pace comes down to two calculations on a 30-day month, each one arithmetic, not a forecast:
- 30 Jul 2026 to 18 Aug 2026: enabling works, from the registered start to 0.2% over 19 daysAbout 0.32 points per month
- 18 Aug 2026 to 30 Jun 2030: rate needed to reach 100% by the registered completion date, 99.8 points over 1,412 daysAbout 2.12 points per month
Neither figure yet describes how Piazza Roma will be built. The first comes from a 19-day window in which the RERA report of 18 August 2026 records mobilisation and early enabling works, the part of a build that readies the plot rather than adding floors, so it moves the register percentage very little and says almost nothing on its own. The second is the distance left divided by the time left: holding about 2.12 points a month from the August 2026 reading would bring Tower A, Tower B and their retail levels to 100% on the registered completion date of 30 June 2030, inside the Q2 2030 handover window. For an investor pricing an office at this stage, and for a business owner planning premises around Q2 2030, the figure to watch is the next dated reading: a second inspection turns this arithmetic into the first measured rate between two readings on the record.
Get the Next Inspection Figure First
Tell me you are tracking Piazza Roma at DAMAC Lagoons and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Piazza Roma at DAMAC Lagoons
A reading of 0.2% on 18 August 2026 only means something against what is being delivered. The full project guide covers the office units this record is tracking toward:

Piazza Roma at DAMAC Lagoons: Office Towers Linked to the Mall
Piazza Roma at DAMAC Lagoons is a DAMAC office project of 336 units in two towers above retail levels.
View the Piazza Roma at DAMAC Lagoons Project GuideConsidering an Early-Stage Entry?
Buying while Piazza Roma is still at enabling works leaves the most time before the 40% completion payment falls due, and the office units still open shift with every cycle. If the record on this page is what brought you here, ask me which units remain before the choice narrows further.
Ask About Remaining Availability on WhatsAppStage Record
Piazza Roma at DAMAC Lagoons Build Stages, Mapped to the Inspections
Each stage below is tied to the window it occupies in the Piazza Roma record: the registration and start dates that opened it, one inspection on 18 August 2026, and three stages no reading has reached yet.
Registration Ahead of Works
Project 4379 entered the DLD register on 23 February 2026 with its ADCB trust account; construction start followed 157 days later, on 30 July 2026.
Mobilisation and Enabling Works
The RERA report of 18 August 2026 records mobilisation works ongoing and enabling works at an early stage, with the DLD register at 0.2%.
Tower A and Tower B Concrete Frames
No reading has entered this stage: the concrete structure of both towers, from the basement and retail levels to the seven office floors and roof.
Blockwork and Finishes
The block walls and the internal and external finishes named in the RERA project description, across the retail levels and office floors of both towers.
Completion and Office Handover
The closing readings toward 100%, with handover expected in Q2 2030 and the DLD registered completion date set at 30 June 2030.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Piazza Roma at DAMAC Lagoons's own record.
Buyer Position
Tracking Your Position at Piazza Roma at DAMAC Lagoons
This page is one of four project resources that together cover a Piazza Roma at DAMAC Lagoons purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Piazza Roma at DAMAC Lagoons Construction Updates
This page: every dated Piazza Roma register reading, from 0.2% in August 2026 to handover.

Piazza Roma at DAMAC Lagoons Golden Visa: Two DAMAC Office Towers
Piazza Roma at DAMAC Lagoons is DAMAC's freehold office project: two towers over retail levels, 336 units, under Oqood now.
Read the Piazza Roma at DAMAC Lagoons Golden Visa Guide
Piazza Roma at DAMAC Lagoons Escrow: DAMAC's Lagoons Account
Piazza Roma at DAMAC Lagoons, DLD project 4379, holds 336 units in Abu Dhabi Commercial Bank escrow, 0.2% certified August 2026.
Verify the Piazza Roma at DAMAC Lagoons Escrow AccountApproaching Handover
Between 0.2% and Handover: What Piazza Roma at DAMAC Lagoons Buyers Should Do Now
At 0.2% on 18 August 2026, nothing on the Piazza Roma record yet reflects a rising tower, which moves an office buyer's attention from the build itself to the payment routes and documents that protect the purchase across the 1,412 days to the registered completion date. The 20/40/40 launch plan counts its instalments from the booking date rather than from readings like this one, so the three checks below belong before the first transfer, not after it.
First, match the receiving account to the ADCB trust account set out in the Piazza Roma escrow verification steps, so the deposit and every later instalment land where the DLD register says they should.
Second, if residency is part of the reason for buying, read the Piazza Roma Golden Visa eligibility notes before you commit, since whether a commercial office unit counts under the property route is decided at application.
Third, settle the unit itself against the Piazza Roma office sizes and payment plan, choosing between Tower A and Tower B before the remaining mix narrows.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore DAMAC Lagoons Structure
A build record is only half the picture; the other half is the district rising around it. These three pages put the Piazza Roma record in its market, masterplan and developer context:

DAMAC Lagoons: Mediterranean-Themed Villas, Townhouses, Apartments and Offices
DAMAC Lagoons sits opposite DAMAC Hills in Dubailand, with 11 themed clusters and 3 projects of villas, townhouses, apartments and offices.
See DAMAC Lagoons Properties for Sale
DAMAC Lagoons Community Overview
Read the DAMAC Lagoons guide: Mediterranean-themed clusters and crystal lagoons across a 45 million sq ft waterfront masterplan.
Explore the DAMAC Lagoons Community
DAMAC Properties: Lagoon Communities, Golf Villas and Branded Collaborations
Founded in 2002, DAMAC has delivered 48,000 homes and is known for large-scale master communities, luxury residential projects and branded collaborations.
View the DAMAC Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Piazza Roma at DAMAC Lagoons Construction Updates Frequently Asked Questions
Piazza Roma at DAMAC Lagoons is an active project on the Dubai Land Department register (number 4379) in its enabling works phase, read at 0.2% in the DLD register after the inspection of 18 August 2026. The RERA report of that date records the status Enabling Works, Progressing, and the dated record is set out in the Piazza Roma inspection timeline above.
Piazza Roma moved 0.2 points, from the 0% shown in the register's previous-inspection field to 0.2% at the inspection of 18 August 2026. That 0% carries no date, so it marks the starting baseline rather than a dated reading, and the August record is published in full in the Piazza Roma August 2026 construction update.
The DLD register sets 30 June 2030 as the registered completion date for Piazza Roma, the last day of Q2 2030, the quarter in which handover is expected, so the two dates agree. At the 0.2% reading of 18 August 2026, 1,412 days separated that inspection from the registered date, which has not passed, and this record is updated whenever a new reading or a change to the register date is posted.
Piazza Roma is recorded with 336 units in the DLD register for project 4379, spread across two towers, Tower A and Tower B. The RERA project description places retail on the basement, ground and first two floors, with seven office floors above plus a roof level; the register shows a single unit total and does not split it between office and retail units.
Construction at Piazza Roma started on 30 July 2026, 157 days after the project was registered with the Dubai Land Department on 23 February 2026. The first reading followed 19 days after that start, at 0.2% on 18 August 2026, a reading taken within the first three weeks of works.
About 2.12 percentage points per month: 99.8 points remained after the 0.2% reading of 18 August 2026, with 1,412 days left to the registered completion date of 30 June 2030, counted on a 30-day month. The only measured window so far, the 19 days from the 30 July 2026 start, works out to about 0.32 points per month, too short to read as a trend; both figures are arithmetic, not a forecast, and the working is shown in the Piazza Roma pace analysis above.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Piazza Roma at DAMAC Lagoons construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.