Rosemont Residences Construction Update - June 2026
June 2026 Inspection Records Rosemont Residences at 42.87% on the DLD Register in Jumeirah Village Triangle
Superstructure, MEP and internal finishes were progressing at different stages at Rosemont Residences when the DLD register logged 42.87 percent for the 8 June 2026 inspection.
Direct advisor access. Every message answered personally, never by a call center.
DLD Register Inspection Data
Rosemont Residences Construction Snapshot
A 19.34 point rise on the previous DLD reading of 23.53%, an earlier figure the register leaves undated, puts Rosemont Residences at 42.87% on 8 June 2026: the superstructure band, where the plan's construction-linked instalments come into play.
Rosemont Residences
2993
Active
42.87%
8 June 2026
14 March 2024
47 residences
4,683.35 sq m
Q4 2025 (passed)
Data source: Dubai Land Department project register for project 2993, inspection dated 8 June 2026, read with the RERA Independent Progress Monitoring Report of the same date (progress status: Main Contract, Progressing), which prints no percentage of its own. The register records construction as started on 14 March 2024 and the project as registered on 1 May 2024. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. The hero image is a project rendering, not verified on-site construction photography. Last updated: June 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Rosemont Residences Construction Progress Summary
By the 8 June 2026 inspection, which the register logged at 42.87% against the undated earlier reading of 23.53%, Rosemont Residences had moved beyond its groundworks: the RERA report for that visit lists enabling, piling, foundation and substructure works as completed. Recorded progress now sits in the frame, services and fit out of a building planned as a ground floor, two podium levels and seven residential floors.
- Enabling works on the District 2 plot
- Piling and foundation works
- Substructure, recorded complete in the 8 June 2026 RERA report
- Superstructure works, at different stages per the RERA report
- Internal works within the building
- MEP systems: mechanical, electrical, and plumbing
- Internal finishes works
- Further register readings across the 57.13 points still to record
- The 30% balance due on completion under the 70/30 plan
- Handover on the date Ellington confirms in writing; the original Q4 2025 schedule has passed
Payment Linked Progress
What 42.87% Progress Means for Rosemont Residences Buyers
Rosemont Residences is sold on a 70/30 plan with 5% instalments tied to 20%, 30%, 40%, 50%, 60% and 70% construction, so a register reading of 42.87% is a payment marker as much as a progress figure. As of that reading, the instalments tied to 20%, 30% and 40% had been triggered and those at 50%, 60% and 70% had not; Ellington confirms when each falls due under each SPA. At this stage, four actions matter most.
Verify the escrow account
Every instalment should go only to the DLD regulated escrow account registered for project 2993 with Abu Dhabi Commercial Bank. Rosemont Residences escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA milestone schedule
Check how your sale and purchase agreement words the construction milestones from 20% to 70%, the notice Ellington issues before each one falls due, and the completion clause that governs the 30% balance. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Confirm your Oqood registration
Off plan purchases are recorded with the Dubai Land Department through Oqood, the interim register entry that ties your contract to project 2993 until a title deed follows completion. Ask for the Oqood confirmation once your booking clears and check that the unit number and buyer names match your SPA.
Track the remaining cycles
The next construction instalment on the plan is tied to 50%, and each new register reading shows how close the build has come to it. Rosemont Residences construction updates hub logs every reading as it is published.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 42.87%?
Entering Rosemont Residences mid-construction means joining a 70/30 plan part way through: a buyer signing now settles whatever is already due under Ellington's current terms at signing, so confirm the applicable schedule with Ellington. Every payment goes to the DLD-registered escrow account for project 2993, released against verified construction progress.
- Foundations and substructure recorded complete in the 8 June 2026 RERA report
- Instalments already triggered are settled under the terms in force at signing
- 30% of the 70/30 plan due on completion, on a date Ellington confirms
- Construction risk carried from excavation to handover
- The longest wait between signing and keys
- Instalments spread from booking across the whole build
Limited Units Available, per the project page as of this update; availability shifts between cycles. The original Q4 2025 handover schedule has passed, so confirm the current date with Ellington in writing.
About the Development
Rosemont Residences Project Details

With substructure recorded complete and the upper building in progress as of 8 June 2026, Rosemont Residences is a mid-construction boutique building of 47 one and two bedroom apartments in District 2 of Jumeirah Village Triangle. Starting prices: AED 1.36M ≈ USD 370K.
For buyers entering at this stage, the trade off is a building already past its foundations against a plan whose 20%, 30% and 40% construction instalments had been triggered by that reading; the original Q4 2025 handover schedule has passed, so confirm the current date with Ellington.
Rosemont Residences by Ellington Project GuideSite Context This Cycle
Explore Rosemont Residences Location on Dubai Map
Rosemont Residences occupies a single plot in District 2 of Jumeirah Village Triangle, a community Ellington describes as family-friendly and built around landscaped communal areas and parks, so the build rises among existing streets rather than on an open site. With substructure done by 8 June 2026, the work shifts upward into the two podium levels, where the developer plans the first-floor pool and amenity deck, and the seven residential floors above.
Because the schools and road links around Jumeirah Village Triangle are already in use, buyers here are waiting on one building rather than on a district: per the developer's location guide, Sunmarke School is about 4 minutes' drive and Dubai Marina about 13 minutes' drive. That settled setting matters most while the current handover date still has to be confirmed with Ellington. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Rosemont Residences During Mid-Construction Progress
The superstructure band is where instalment timing, payment protection, and residency planning meet. Each resource below is matched to where Rosemont Residences stood at the 8 June 2026 reading.

Rosemont Residences Construction Updates
This page: the 8 June 2026 DLD register reading for Rosemont Residences, from substructure to superstructure.

Rosemont Residences Golden Visa: 1 and 2 Bedroom Apartments Against AED 2M
At Rosemont Residences, Ellington's boutique JVT building, neither the 1 nor 2 bedroom apartment reaches the AED 2M threshold.
Read the Rosemont Residences Golden Visa Guide
Rosemont Residences Escrow With Abu Dhabi Commercial Bank, Project 2993
Rosemont Residences, DLD project 2993, escrows its 47 residences with Abu Dhabi Commercial Bank and read 42.87% in June 2026.
Verify the Rosemont Residences Escrow AccountUpdate Timeline
Other Rosemont Residences Construction Updates
June 2026 opens the monthly series for Rosemont Residences; the hub gathers each later reading as the register records it.
Where This Update Fits
Explore Rosemont Residences Structure
The 8 June 2026 reading sits inside a wider picture: the Jumeirah Village Triangle market Rosemont competes in, the community it belongs to, and the developer responsible for it.

Jumeirah Village Triangle Properties for Sale
Explore JVT apartments by Binghatti and Ellington, comparing available projects, property types, prices, payment plans and handover dates.
See Jumeirah Village Triangle Properties for Sale
Jumeirah Village Triangle by Nakheel: Villas, Townhouses, Apartments and Nine Residential Districts
Explore JVT's nine residential districts, garden villas, townhouses, apartment towers, community parks, schools and upcoming developments in Dubai.
Explore the Jumeirah Village Triangle Community
Ellington Properties: Design-Led Boutique Residences With Curated Interiors
Ellington Properties, founded in 2014, is a design-led developer of apartments, villas and waterfront homes, with 30 developments launched and delivered.
View the Ellington Developer ProfileFAQs
Rosemont Residences Construction Progress in June 2026: Frequently Asked Questions
The Dubai Land Department register recorded Rosemont Residences, project 2993, at 42.87% construction progress for the inspection dated 8 June 2026. The RERA progress report for that visit prints no percentage of its own, so the figure is the register reading, and it describes the build only as of that date.
The register's inspection card lists 23.53% as the previous inspection reading but shows no date for it. Because the earlier reading is undated, no monthly pace can be measured between the two figures; the only dated point in this record is 42.87% on 8 June 2026.
The RERA Independent Progress Monitoring Report dated 8 June 2026 lists enabling works, piling, foundations and substructure as completed. Superstructure, internal works, MEP systems and internal finishes were progressing at different stages, and the report gives the progress status as Main Contract, Progressing. The inspector's site photographs sit with the RERA record and are not published here.
It places the building in its superstructure stage, with 57.13 points still to record before the register reaches 100%. It is a progress measure rather than a date: the original Q4 2025 handover schedule has passed, so the current completion date should be confirmed with Ellington in writing. How readings are logged from one cycle to the next is covered on the Rosemont Residences construction updates hub.
On the developer's 70/30 plan, 5% instalments are tied to completion of 20%, 30%, 40%, 50%, 60% and 70% construction. As of the 42.87% register reading, the instalments tied to 20%, 30% and 40% had been triggered and those tied to 50%, 60% and 70% had not; with the three reservation-date instalments, a launch buyer would have had 55% fall due by then, with the 30% balance due on completion. Ellington confirms when each instalment falls due under each SPA, and its milestone notice governs rather than the register figure.
The figure was recorded on 8 June 2026 and does not change on this page between cycles. A newer inspection may already appear on the Dubai REST record for project 2993, Rosemont Residences, which is also where the registered completion date is shown, so check that record before relying on any figure here.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the June 2026 inspection record for Rosemont Residences correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.