Luxury marina and waterfront balcony view at Seascape Rashid Yachts and Marina by Emaar in Dubai Construction Update May 2024 Presented by Tohid Fetrat

Emaar Properties · Rashid Yachts & Marina · Construction Update

Seascape Construction Update - May 2024

DLD Register Records Seascape at 8.96% Construction Progress for the May 2024 Inspection at Rashid Yachts & Marina

Tower cranes stood over the basement works, with piling almost complete and foundations progressing, when the DLD register recorded Seascape at 8.96 percent on 01 May 2024.

Direct advisor access. Every message answered personally, never by a call center.

8.96%DLD Register Reading
01 May 2024Inspection Date
November 2026Scheduled Handover
2513DLD Project Number

DLD Register Record, May 2024

Seascape Construction Snapshot: May 2024

A 7.07 point rise on the register app's undated previous figure of 1.89% put Seascape at 8.96% on 01 May 2024, early in the enabling and foundations band, where a reading tracks work below ground rather than visible buildings. This page is the record of that inspection; every later reading sits on the Seascape construction updates page.

Project Name

Seascape at Rashid Yachts & Marina

Project Number

2513

Project Status

Active

Construction Progress

8.96%

Inspection Date

01 May 2024

Construction Start

13 April 2023

Total Units

Approx. 391 units

Total Built Area

46,460.50 sq m

Expected Completion

November 2026

Data source: the Dubai Land Department project register (Dubai REST) reading for the RERA inspection of 01 May 2024; the Independent Progress Monitoring Report for that date records the status as Main Contract - Progressing and prints no percentage. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. The hero image is project imagery, not a photograph from this inspection. Last updated: May 2024 (historical record, compiled September 2026).

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

The 01 May 2024 Inspection

Seascape Construction Progress Summary

The Independent Progress Monitoring Report for 01 May 2024 lists mobilisation as ongoing and enabling works at an advanced stage, alongside the piling and foundation packages. Everything above the two-level basement still lay ahead: four residential buildings, from Building 1 at G+18 to Building 4 at G+6, followed by the envelope, MEP and finishes.

Completed
  • Project registration in the DLD register on 05 December 2022
  • Construction start recorded on 13 April 2023
In Progress at 8.96%
  • Mobilisation, recorded as ongoing
  • Enabling works, at an advanced stage
  • Piling, almost completed
  • Foundation works, progressing at different stages
Ahead of Handover
  • Substructure across the two basement levels
  • Superstructure of Buildings 1 to 4 (G+18, G+7, G+8 and G+6)
  • External envelope, MEP and internal finishes
  • Handover, scheduled for November 2026
Next reading in this seriesThe 30 June 2025 inspection, covered in the June 2025 update linked in the timeline below.
Scheduled handoverNovember 2026, roughly 31 months after this inspection; the register lists 30 November 2026 as the registered completion date (read September 2026).
Remaining distance91.04 percentage points separated the 01 May 2024 reading from 100%.

Payment Linked Progress

What 8.96% Progress Meant for Seascape Buyers

The Seascape launch plan of record splits the price 80% during construction and 20% on completion, with its later rows labelled against construction milestones, so an early reading of 8.96% mattered mainly for what it said about the rows still ahead. At this stage, four actions mattered most.

Before Each Instalment

Verify the escrow account

Every instalment should go only to the DLD regulated escrow account registered for project 2513. Seascape escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.

After Booking

Confirm Oqood and your SPA schedule

Check that the purchase is registered on Oqood, the DLD interim register for off plan units, and read how your sale and purchase agreement defines the construction linked rows; in the 2022 launch schedule, the November 2024 instalment is marked upon 20% construction completion. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.

Closer to Handover

Plan the snagging window early

At 8.96% the pre handover inspection was still far off; it becomes relevant in the final stage before the November 2026 handover. The Seascape snagging inspection guide sets out the checks for apartments and two-level townhouses.

Every Cycle

Track the later readings

A foundation stage reading is the start of a long series. Seascape construction updates carries every later inspection, including the latest in the record.

General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.

Entering Seascape Early: The May 2024 Picture

An entry at the foundation stage traded a long wait for the widest payment runway: in May 2024 the structure was still below ground and handover was about two and a half years out. Every payment goes to the DLD-registered escrow account for project 2513, released against construction progress recorded at RERA inspections.

Entering at 8.96% (May 2024)
  • Piling and foundations under way at the 01 May 2024 inspection
  • Roughly 31 months to the November 2026 scheduled handover
  • 80/20 launch plan: 20% of the price due on completion
Typical Late Stage Entry
  • Structure complete and visible before you commit
  • Months rather than years to the handover date
  • Most of the price due within a short window
AED 1.65M ≈ USD 449KCurrent Starting Price
80/20 Plan20% Due on Completion
November 2026Scheduled Handover
Ask What Is Available at Seascape

Unit availability is not part of this May 2024 record; it shifts between cycles and is confirmed at the time you ask.

About the Development

Seascape Project Details

Seascape at Rashid Yachts & Marina by Emaar aerial view of residential buildings marina yachts and waterfront pools in Dubai, Presented by Tohid Fetrat
Rashid Yachts & Marina · Emaar Properties

At the May 2024 inspection, Seascape was a foundation stage site for approximately 391 homes in four buildings over a two-level basement: 1, 2 and 3 bedroom apartments and two-level 3 bedroom townhouses. Current starting price: AED 1.65M ≈ USD 449K.

For a buyer entering near this stage, the trade off was the longest wait in exchange for the earliest point in the payment plan, with handover scheduled for November 2026.

Seascape at Rashid Yachts & Marina Project Guide

Site Context in May 2024

Explore Seascape Location on Dubai Map

Seascape sits on plot 441, which the register places in Madinat Dubai Almelaheyah, as a four-building complex beside the community park and the canal pool at Rashid Yachts & Marina. In May 2024 that footprint was still a foundation site, with piling and foundation works for Buildings 1 to 4 and the two-level basement progressing at different stages.

The district is planned around a 430-berth marina for yachts up to 100 metres, a promenade and the canal pool, with Seagate beside Seascape on the masterplan, and the fact sheet puts Sheikh Zayed Road 10 minutes and Downtown Dubai 20 minutes away. For a buyer at this stage, the case rested on that planned setting and the November 2026 schedule, since the building itself was still below ground. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Seascape on Dubai Map

Buyer Resources for This Project

Investing in Seascape During Early Construction Progress

In the enabling and foundations band, the priorities are payment protection, residency planning at the right price tier, and knowing when the later steps arrive. Each resource below is matched to where Seascape stood in May 2024.

Seascape at Rashid Yachts and Marina construction updates featuring resort style pools, landscaped courtyards, and contemporary waterfront residences. Presented by Tohid Fetrat
You Are Here

Seascape Construction Updates

This page: Seascape's 01 May 2024 inspection record, from piling and foundations to the 8.96% reading.

Luxury waterfront view at Seascape Rashid Yachts and Marina by Emaar with UAE Golden Visa card in Dubai Presented by Tohid Fetrat

Seascape at Rashid Yachts & Marina Golden Visa: Four Residential Buildings

Seascape at Rashid Yachts & Marina, approximately 391 Emaar units, qualifies at 2 and 3 bedroom apartments and the townhouse.

Read Seascape Golden Visa Guide
Luxury waterfront residences at Seascape Rashid Yachts and Marina with escrow account security icons in Dubai Presented by Tohid Fetrat

Seascape at Rashid Yachts & Marina Escrow: Dubai Islamic Bank on Record

Seascape at Rashid Yachts & Marina, DLD project 2513, escrows 395 units at Dubai Islamic Bank, 79.13% certified May 2026.

Verify Seascape Escrow Account
Why Snagging Matters at This Stage of Seascape at Rashid Yachts and Marina featuring contemporary waterfront residences surrounded by landscaped gardens. Presented by Tohid Fetrat

Seascape at Rashid Yachts & Marina Snagging for Apartments and Two-Level Townhouses

Seascape at Rashid Yachts & Marina is Emaar Properties' four-building address beside the community park and canal pool, approximately 391 residences.

Book Seascape Snagging

Update Timeline

Other Seascape Construction Updates

Follow the inspection history forward from this foundation stage reading to see how Seascape moved through each later phase.

All Seascape Construction Updates

FAQs

Seascape Construction Progress in May 2024: Frequently Asked Questions

The Dubai Land Department project register recorded Seascape, project 2513, at 8.96% for the inspection of 01 May 2024, 7.07 points above the undated previous inspection figure of 1.89% shown in the register app. This is a historical reading; later readings, including the latest, are listed on the Seascape construction updates page.

Yes. A scheduled completion can be revised between inspection cycles, and one early reading does not by itself indicate delay or early delivery. When this record was compiled in September 2026, the register listed 30 November 2026 as the registered completion date, in line with the scheduled November 2026 handover.

The Independent Progress Monitoring Report for that date records mobilisation as ongoing, enabling works at an advanced stage, piling almost completed and foundation works progressing at different stages. Its inspection photographs, part of the RERA record and not reproduced here, show reinforcement laid across the basement area with tower cranes on site.

The register records construction start on 13 April 2023, so the 8.96% reading of 01 May 2024 came 384 days later, which works out to about 0.70 points a month on a 30-day month. That figure is arithmetic on two recorded dates, not a forecast, and on its own it says nothing about delay.

The register app shows 1.89% as the previous inspection figure next to the 8.96% reading of 01 May 2024, but gives no date for it. The 7.07 point gap can therefore be stated, but it cannot be turned into a monthly pace, because the length of the interval is not on record.

In the 2022 launch schedule of record, the 3rd instalment of 10% was dated February 2024 and the 4th instalment of 10% November 2024, the first row marked upon 20% construction completion against an estimated date. On 01 May 2024 the register reading of 8.96% was below that 20% mark; how an individual SPA ties instalments to recorded progress is set by the SPA itself.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the May 2024 inspection record for Seascape at Rashid Yachts & Marina correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.