Emaar · Grand Polo Club & Resort · Construction Update
Selvara at Grand Polo Construction Update - May 2026
May 2026 Inspection Records Selvara at Grand Polo at 2.81% Construction Progress in Dubai Investment Park Second
Mobilization, enabling works, piling, and deep infrastructure services were the activities recorded on site at Selvara, verified at 2.81 percent in the May 2026 RERA inspection.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Selvara at Grand Polo Construction Snapshot
A 2.16 point rise to 2.81% places Selvara at Grand Polo in the enabling and foundations band, the stage where what a buyer can verify is the payment route rather than the building.
Selvara at Grand Polo by Emaar
3822
Active
2.81%
14 May 2026
02 November 2025
237 villas
79,477.06 sq m
30 April 2029
Data source: RERA inspection conducted on 14 May 2026, tracked against DLD inspection records for project 3822. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. This reading was 126 days old when the page was written, so 2.81% is the last confirmed position for Selvara and not a live figure. Last updated: September 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Selvara at Grand Polo Construction Progress Summary
Selvara at Grand Polo moved from 0.65% to 2.81% between its first two readings, a gain of 2.16 points recorded on 14 May 2026. The earlier figure is held on the register without a date, so the movement is real but the interval behind it is not on record. What the 14 May 2026 note does fix in time is the shape of the work: mobilization, enabling works, piling, and deep infrastructure services all running together across plot 3939.
- Project 3822 entered on the DLD register on 13 June 2025
- Main contract awarded and construction start recorded 02 November 2025
- Trust account opened for the project with National Bank of Ras Al Khaimah
- Mobilization across the 237 villa site in Dubai Investment Park Second
- Enabling works on plot 3939
- Piling ongoing at the time of the 14 May 2026 inspection
- Deep services for infrastructure progressing on site
- Villa superstructure in the registered G+2 form across the plot
- Remaining RERA inspection cycles from 2.81% toward 100%
- Handover from the registered completion date of 30 April 2029
Payment Linked Progress
What 2.81% Progress Means for Selvara Buyers
Most Dubai off plan payment plans tie instalments either to construction milestones or to fixed dates, so a verified reading of 2.81% tells a Selvara buyer which protections carry the weight right now and which are years away. At this stage of the build, four actions matter most.
Verify the escrow account
Every instalment ahead of handover should reach only the DLD regulated escrow account registered for project 3822, held with National Bank of Ras Al Khaimah. Selvara at Grand Polo escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA instalment schedule
The launch schedule of record runs nine instalments on an 80/20 split, and the first one tied to a construction percentage sits at 50% completion, a long way beyond the 2.81% recorded on 14 May 2026. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the recorded inspection milestones.
Confirm your Oqood registration
At 2.81% the only title in existence is the interim one, and Oqood is where the Dubai Land Department records it against project 3822 before a villa physically exists. Ask for the Oqood receipt in your own name and check that the unit reference on it matches the one written into your SPA.
Track the readings toward 2029
From 2.81% there are 97.19 points to cover before handover readiness. Selvara at Grand Polo construction updates records each RERA reading as it publishes, which is the only dated evidence a buyer gets between this cycle and 2029.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 2.81%?
Entering at the enabling stage buys the longest runway and the least evidence: the villas exist as a registered form rather than a structure, and almost everything before 30 April 2029 is programme rather than record. Every payment goes to the DLD-registered escrow account for project 3822, released against verified construction progress.
- Construction start recorded 02 November 2025, with a dated reading on the register
- Four of the nine launch instalments already dated before this inspection
- Roughly thirty five months of build time to the registered completion date
- No inspection reading on the register to read at all
- The full instalment runway ahead, priced at launch levels
- Construction risk carried from first works through to handover
Limited Units Available is the figure shown on the project page as of this update; availability shifts between cycles.
About the Development
Selvara at Grand Polo Project Details

With mobilization and piling on the record, Selvara is an enabling stage release of 237 four bedroom villas in the registered G+2 form, spread across plot 3939 rather than stacked in a tower. Starting prices: AED 6.20M ≈ USD 1.69M.
For a buyer entering here the trade off is the full construction horizon against the longest payment runway, with handover expected from Apr 2029 per the current DLD record.
Selvara at Grand Polo Project GuideSite Context This Cycle
Explore Selvara at Grand Polo Location on Dubai Map
Selvara occupies plot 3939 in Dubai Investment Park Second, inside the 5.54 million sq m Grand Polo Club & Resort masterplan, and its 237 villas sit near the Green Core instead of on one concentrated footprint. That spread is why the May 2026 cycle reads as it does: mobilization, enabling works, piling, and deep infrastructure services all run across the plot at once rather than rising floor by floor in a single place.
The district around the site is still filling in, so the context that matters to a Selvara buyer at 2.81% is the corridor rather than the street: five minutes to Al Maktoum International Airport, ten minutes to Expo City, thirty minutes to Downtown Dubai. The villas and the infrastructure serving them are maturing on broadly the same timeline, which is the honest read for anyone weighing a 2029 move in date. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Selvara at Grand Polo During Early Construction Progress
The enabling band is where payment protection, residency planning, and registration paperwork decide a buyer's position. Each resource below is matched to where Selvara stands right now.

Selvara at Grand Polo Construction Updates
This page: the verified 14 May 2026 inspection record for Selvara, from enabling works onward.

Selvara at Grand Polo Golden Visa, Roughly Three Times Over
Selvara at Grand Polo, Emaar's 237-villa release in Dubai Investment Park Second, offers only the 4 bedroom villa, and it qualifies.
Read Selvara at Grand Polo Golden Visa Guide
Selvara at Grand Polo Escrow, the First Selvara Release on Record
Selvara at Grand Polo, DLD project 3822, holds 237 units with National Bank of Ras Al Khaimah, 2.81% certified May 2026.
Verify Selvara at Grand Polo Escrow AccountUpdate Timeline
Other Selvara at Grand Polo Construction Updates
May 2026 is the first published inspection record for Selvara at Grand Polo, so the timeline starts here; every later cycle joins it on the updates hub as it is recorded.
Where This Update Fits
Explore Selvara at Grand Polo Structure
This monthly report is one node in the wider record: the community around plot 3939, the developer building on it, and the villa releases competing with it.

Grand Polo Dubai Properties for Sale
Browse villas and townhouses for sale at Grand Polo Club & Resort, comparing Equiterra, Selvara and Chevalia.
See Grand Polo Dubai Properties for Sale
Grand Polo Dubai Community Overview
Read the Grand Polo Club & Resort guide: Emaar's 60 million sq ft equestrian estate community of villas and townhouses.
Explore the Grand Polo Dubai Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileFAQs
Selvara at Grand Polo Construction Progress in May 2026: Frequently Asked Questions
As of the RERA inspection conducted on 14 May 2026, Selvara at Grand Polo stands at 2.81% construction progress in the DLD project register for project 3822, with the progress status recorded as Main Contract, Progressing.
The register shows a rise from 0.65% to 2.81%, a gain of 2.16 points as at 14 May 2026. The earlier reading is held without a date, so the interval between the two is not on the record and the movement cannot honestly be expressed as a monthly rate.
It dates from 14 May 2026 and was 126 days old when this update was written, so it is the last confirmed position rather than a live one. New figures appear only after a site visit is recorded, and the publishing cadence for this project is set out on the Selvara at Grand Polo construction updates hub.
The registered completion date of 30 April 2029 was unchanged in the DLD record at the 14 May 2026 inspection, so nothing on the register had slipped at that point. The record also shows the distance involved: 97.19 points remained after that reading, with roughly thirty five months of build time to run and almost all of the villa construction still ahead.
The 14 May 2026 inspection recorded mobilization, enabling works and piling ongoing, with deep services for infrastructure progressing across plot 3939. None of the 237 villas in the registered G+2 form was standing at that point: the work was still below and around the future villa footprints.
The launch schedule of record runs nine instalments on an 80/20 split, and the first instalment tied to a construction percentage sits at 50% completion, far beyond the 2.81% recorded on 14 May 2026. Instalments falling due in this period are therefore date driven rather than progress driven, which makes the escrow account for project 3822 the protection that matters at this stage.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the May 2026 inspection record for Selvara at Grand Polo correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.