VELA Viento Dorchester Collection by OMNIYAT in Marasi Bay project rendering used for the May 2026 construction update showing the planned tower facade with Burj Khalifa in the background in Dubai - Presented by Tohid Fetrat

OMNIYAT · Marasi Bay · Construction Update

VELA Viento Construction Update - May 2026

May 2026 DLD Register Reading Places VELA Viento at 21.81% Construction Progress in Marasi Bay

Structural, internal, and MEP works were progressing at VELA Viento when inspectors visited on 18 May 2026, with enabling and foundation works already recorded complete.

Direct advisor access. Every message answered personally, never by a call center.

21.81%DLD Register Reading
18 May 2026Inspection Date
Q3 2027Expected Handover
2885DLD Project Number

Verified DLD Register Data

VELA Viento Construction Snapshot

At 3.78 points above the previous register reading (date not shown), VELA Viento stood at 21.81% on 18 May 2026: the superstructure band, where the frame climbing toward 41 floors, not finishing work, drives each new reading.

Project Name

VELA Viento, Dorchester Collection by OMNIYAT

Project Number

2885

Project Status

Active

Construction Progress

21.81%

Inspection Date

18 May 2026

Construction Start

09 January 2024

Total Units

95 Ultra-Luxury Residences

Total Built Area

45,561.81 sq m

Expected Completion

13 May 2027

Data source: RERA Independent Progress Monitoring Report dated 18 May 2026 (progress status Main Contract - Progressing; the report prints no percentage) and the Dubai Land Department project register, which records the 21.81% reading, register status Active, registration on 10 July 2024 and the construction start of 09 January 2024. The reading was 134 days old at this page's build on 29 September 2026: re-verify project 2885 on Dubai REST before publishing. The hero image is a project rendering of the planned tower, not a site photograph. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: May 2026.

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

This Inspection Cycle

VELA Viento Construction Progress Summary

The inspection report dated 18 May 2026 prints no percentage of its own: it records the status Main Contract - Progressing for a 2B + G + 41 Floors + Roof tower in concrete structure and block, and its photographs showed the concrete frame rising above the podium with tower cranes on site. The 21.81% figure comes from the Dubai Land Department register, which is why every percentage on this page is labelled a register reading.

Completed
  • Enabling works on plot 207, recorded complete on 18 May 2026
  • Foundation works for the tower, recorded complete on the same date
  • Registration in the DLD project register on 10 July 2024
In Progress at 21.81%
  • Structural works on the concrete frame of the tower
  • Internal works, recorded as progressing at the site
  • MEP works: mechanical, electrical, and plumbing systems
Ahead of Handover
  • Structure through the 41 floors to roof level
  • Block work with internal and external finishes, per the RERA project description
  • Remaining register readings toward 100%
  • Expected handover Q3 2027; registered completion date 13 May 2027
Next inspectionPublished in the DLD project register after the next RERA site visit; no date is announced in advance, and the next reading gets its own monthly page.
Completion datesRegistered completion date 13 May 2027 in the DLD register, 360 days after the 18 May 2026 reading; expected handover Q3 2027 per the developer.
Remaining distance78.19 percentage points separated the 18 May 2026 reading from 100%.
Whole-build averageAbout 0.76 points per 30-day month: 21.81 points over the 860 days from the registered start on 09 January 2024 to 18 May 2026. Arithmetic, not a forecast.
Reading age134 days on 29 September 2026; re-verify project 2885 on Dubai REST before publishing.

Payment Linked Progress

What 21.81% Progress Means for VELA Viento Buyers

The developer documents reviewed for this page publish no payment schedule for VELA Viento, so your SPA is the only source for which instalments, if any, follow construction stages. With the frame rising and 78.19 points still ahead on 18 May 2026, four actions matter most at this stage.

Before Any Transfer

Verify the escrow account

Every instalment should go only to the DLD regulated escrow account registered for project 2885, which the inspection report places with Commercial Bank of Dubai. VELA Viento escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.

Before Your Next Instalment

Reread your SPA milestone schedule

Check whether your sale and purchase agreement ties any instalment to a construction stage, and map those clauses against the 21.81% reading and the Q3 2027 expected handover. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.

After Booking

Confirm your Oqood registration

Make sure your VELA Viento residence is registered with the Dubai Land Department through Oqood under project 2885 before further instalments: that interim registration ties your purchase to the register until title is issued at completion.

Every Cycle

Track the structural readings

While the frame climbs toward the 41st floor, each new register reading shows how quickly the structure is closing the 78.19 point gap. The VELA Viento construction updates hub keeps every reading in one sequence.

General framework, not legal advice: instalment triggers, notice periods, and registration obligations are set by your individual SPA and the DLD record, and both should be read directly.

Buying at 21.81%?

Entering while the frame is still rising trades certainty for time: enabling and foundation works are recorded complete, the structure is under way, and handover is expected in Q3 2027. Every payment goes to the DLD-registered escrow account for project 2885, released against construction progress recorded in the DLD register.

Entering Now at 21.81%
  • Enabling and foundation works recorded complete on 18 May 2026
  • Structural, internal, and MEP works recorded as progressing
  • Expected handover Q3 2027 per the developer
Typical Launch Entry
  • Construction risk carried from excavation onward
  • The longest wait between purchase and handover
  • Widest choice of floors and layouts, at launch pricing
AED 17.00M ≈ USD 4.63MStarting Price
95 ResidencesTotal in the Tower
Q3 2027Expected Handover
Ask What Is Available at VELA Viento

09 units listed available on the VELA Viento project page as of this update; availability shifts between cycles.

About the Development

VELA Viento Project Details

VELA Viento Dorchester Collection by Omniyat illuminated luxury tower architecture at dusk in Dubai - Presented by Tohid Fetrat
Marasi Bay · OMNIYAT

Recorded at 21.81% on 18 May 2026, VELA Viento is a structural stage tower of 95 ultra-luxury residences, planned at 180 metres and 41 floors by Foster + Partners, with Gilles & Boissier interiors. Starting prices: AED 17.00M ≈ USD 4.63M.

For buyers entering at this stage, the trade off is a longer wait against an earlier position in the build, with handover expected in Q3 2027 and Dorchester Collection managing the residences once the tower is complete.

VELA Viento by OMNIYAT Project Guide

Site Context This Cycle

Explore VELA Viento Location on Dubai Map

VELA Viento occupies plot 207, registered under Business Bay, on the Marasi Bay waterfront beside its sister property VELA, and every residence is planned with Burj Khalifa views. In May 2026 the site was still defined by its podium and lower frame: the views that set the price of the upper residences only open up as the structure climbs toward 180 metres over the coming cycles.

Marasi Bay sits inside an established Business Bay grid, with Marasi Drive, Sheikh Zayed Road, and Al Khail Road already in service and the promenade linking VELA and The Lana, so VELA Viento is being built into a working waterfront rather than an unfinished district, which matters for buyers weighing a Q3 2027 move in or rental plan. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view VELA Viento on Dubai Map

Buyer Resources for This Project

Investing in VELA Viento During Structural Construction Progress

While the structure rises, payment protection and residency planning matter more than handover logistics. Each resource below is matched to where VELA Viento stood on 18 May 2026.

VELA Viento Dorchester Collection by OMNIYAT in Marasi Bay construction updates cover image featuring project renderings of the residential towers and landscaped waterfront surroundings in Dubai - Presented by Tohid Fetrat
You Are Here

VELA Viento Construction Updates

This page: the 18 May 2026 register reading for VELA Viento, from foundations to frame.

VELA Viento Dorchester Collection by OMNIYAT in Marasi Bay Golden Visa graphic with a gold card beside project tower renderings in Dubai - Presented by Tohid Fetrat

VELA Viento Golden Visa: Four Types Far Above the Line

OMNIYAT's VELA Viento, a 95-residence Dorchester Collection address at Marasi Bay, qualifies at all four types from the 2 bedroom.

Read VELA Viento Golden Visa Guide
VELA Viento Dorchester Collection by OMNIYAT in Marasi Bay escrow account graphic with shield and padlock icons above a waterfront city view in Dubai - Presented by Tohid Fetrat

VELA Viento Escrow: OMNIYAT's Marasi Bay Account at Commercial Bank of Dubai

OMNIYAT's VELA Viento, DLD project 2885, escrows 96 units at Commercial Bank of Dubai, certified 21.81% in May 2026.

Verify VELA Viento Escrow Account

Update Timeline

Other VELA Viento Construction Updates

May 2026 is the first VELA Viento monthly update on this site, so the timeline starts here; each later register reading will be added as its own page.

All VELA Viento Construction Updates

FAQs

VELA Viento Construction Progress in May 2026: Frequently Asked Questions

The Dubai Land Department project register recorded VELA Viento, project 2885, at 21.81% construction progress after the RERA inspection of 18 May 2026. The inspection report itself prints no percentage; it lists the progress status as Main Contract - Progressing. The reading was 134 days old on 29 September 2026, so check project 2885 on Dubai REST for any newer figure.

The register showed 18.03% as the previous inspection reading and 21.81% as the current reading on 18 May 2026, a difference of 3.78 points. The register does not show the date of the 18.03% reading, so no monthly pace can be measured from this pair.

The 18 May 2026 inspection notes recorded enabling and foundation works as completed, and structural, internal, and MEP works as progressing at the site. The RERA project description sets the building out as a 2B + G + 41 Floors + Roof tower with a concrete structure and block, followed by internal and external finishes.

The DLD register lists 13 May 2027 as the registered completion date for project 2885, 360 days after the 18 May 2026 reading, while the developer's expected handover for VELA Viento is Q3 2027. Both are stated here as recorded. Registered dates can be revised between inspection cycles, so read the register again before planning around either date; how the register records dates across cycles is covered on the VELA Viento construction updates hub.

From the registered construction start on 09 January 2024 to the 18 May 2026 reading, VELA Viento gained 21.81 points over 860 days, about 0.76 points per 30-day month. That figure is whole-build arithmetic, not a forecast: it describes the past average only and says nothing about the pace of the remaining 78.19 points.

It is the progress status the RERA inspection report gave VELA Viento on 18 May 2026, recording that works under the main construction contract were proceeding at the site. Read together with the 21.81% register reading and the notes on structural, internal, and MEP works, it places the tower in its structural phase, well before any finishing stage.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the May 2026 inspection record for VELA Viento correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts