DAMAC Properties · DAMAC Hills 2 · Construction Update
Violet at DAMAC Hills 2 Construction Update - April 2026
April 2026 Inspection Records Violet at 85.44% Construction Progress Across 526 Townhouses
Envelope, MEP, finishes, and infrastructure packages all run at advanced stages across Violet's 526 townhouses, verified at 85.44 percent in the April 2026 RERA inspection.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Violet Construction Snapshot
A 15.21 point gain since the previous recorded inspection puts Violet at 85.44%, past the stage where the 526 townhouses are being built and into the stage where they are being finished, fitted, and connected.
Violet at DAMAC Hills 2
2734
Active
85.44%
14 April 2026
23 October 2023
526 townhouses
73,408.11 sq m
No date published in the DLD record
Data source: RERA inspection conducted on 14 April 2026, tracked against DLD inspection records. The expected completion field for project 2734 is empty in the register as of this update, so the developer's anticipated completion date of June 2026, published on the Violet payment plans, is the only completion date on the file. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: July 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else.
This Inspection Cycle
Violet Construction Progress Summary
Violet moved from 70.23% at its previous recorded inspection to 85.44% on 14 April 2026, a gain of 15.21 points. The inspector's note for this cycle is specific: enabling, foundation, structural, and internal works are recorded as substantially completed, while envelope, MEP, finishes, and infrastructure are all at advanced stages and external works sit at different stages across the site. In a 526 unit townhouse project that distinction matters, because the remaining percentage is spread across streets rather than concentrated in one building.
- Enabling and foundation works across plot 11385
- Concrete structure and blockwork on the G+1+R townhouses
- Internal works recorded as substantially completed at inspection
- Envelope packages, described as at an advanced stage
- MEP installation across the townhouse clusters
- Internal and external finishes on the 526 units
- Community infrastructure serving the Violet cluster
- External works, progressing at different stages street by street
- Remaining RERA inspection cycles toward 100%
- Building completion certificate procedures
- Unit by unit handover once completion is certified
Payment Linked Progress
What 85.44% Progress Means for Violet Buyers
Both published Violet payment plans put the single largest installment at completion: 40 percent on the 60/40 launch plan, 30 percent on the 70/30 regular plan. Both also carry construction linked triggers at 70, 80, and 90 percent. At a recorded 85.44 percent, that puts most Violet buyers between two triggers, which is exactly when the paperwork is worth rereading. Four actions matter at this stage.
Verify the escrow account
Any payment still ahead of handover belongs in the DLD regulated escrow account registered for project 2734, held with Emirates NBD Bank per the April 2026 inspection record. Violet escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA milestone schedule
The published plans release money at 70, 80, and 90 percent completion, and your SPA, not the brochure, defines which plan applies to your unit and what percentage those triggers are read against. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the certified milestones.
Book the snagging window
At 85.44% recorded progress, with the developer's own anticipated date already behind it, Violet is inside the booking window for a pre handover inspection. Violet snagging inspection guide covers the booking window before acceptance.
Track the remaining cycles
With no expected completion date published in the register, the inspection reading is the only dated evidence of where Violet actually stands. Violet construction updates hub keeps the final stretch free of surprises.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 85.44%?
Entering a townhouse project this late trades payment plan runway for a structure you can see: the concrete is up, the internal works are recorded as substantially complete, and the remaining choice is between the units still available. Every payment goes to the DLD-registered escrow account for project 2734, released against certified construction progress.
- Certified structure: the inspection record above is the risk picture
- Finishing works, not foundations, decide the remaining timeline
- The completion installment, 30 or 40 percent, arrives soon rather than in years
- Construction risk carried from excavation to handover
- Two to four years of waiting is the usual delivery horizon
- Longer installment runway, priced at launch levels
Availability at this stage moves unit by unit rather than by release, and shifts between cycles; ask for the current list before planning around a specific type.
About the Development
Violet Project Details

With structure and internal works recorded as substantially completed, Violet is a finishing stage cluster of 526 four bedroom G+1+R townhouses in two prototypes, sized 2,352 and 2,415 sq ft. Starting prices: AED 1.87M ≈ USD 509K.
For buyers entering at this stage, the trade off is a short remaining wait against a large completion installment, on a project whose expected completion date is currently absent from the DLD record.
Violet at DAMAC Hills 2 Project GuideSite Context This Cycle
Explore Violet Location on Dubai Map
Violet occupies plot 11385 in Madinat Hind 4 per the April 2026 inspection record, on the DAMAC Hills 2 edge that faces Water Town, and the shape of the plot explains the shape of this cycle's report: 526 townhouses are delivered street by street, so envelope, finishes, and external works sit at different stages across the clusters rather than advancing as a single front.
Because DAMAC Hills 2 is an occupied master community with its Water Town, Sports Town, and Down Town amenities already running, Violet is finishing into a neighborhood that already works, which matters for buyers weighing an occupancy or rental plan against an inspection record that is still 14.56 points short of complete. See the project's position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Violet During Final Construction Progress
At 85.44%, the questions that decide a Violet purchase change from build risk to money and handover: where the remaining installments sit, what residency a purchase supports, and how a townhouse gets inspected before it is accepted.

Violet Construction Updates
This page: the 14 April 2026 RERA reading for Violet, recorded at 85.44 percent construction progress.
Violet Golden Visa
Check whether a Violet townhouse purchase clears the property value threshold for Golden Visa eligibility.
Read Violet Golden Visa Guide
Violet Escrow Account
Confirm the DLD registered Emirates NBD escrow account for project 2734 before releasing any remaining installment.
Verify Violet Escrow Account
Violet Snagging Inspection
At 85.44 percent recorded progress, document defects independently before you accept your Violet townhouse.
Book Violet Snagging InspectionUpdate Timeline
Other Violet Construction Updates
Every published reading for Violet lands in one place, so the record between 70.23 percent and handover stays readable in order.
Where This Update Fits
Explore Violet Structure
This reading sits inside a larger file: the master community around the plot, the developer named on the record, and the listings competing with Violet for the same buyer.

DAMAC Hills 2 Properties for Sale
Compare completed and off plan DAMAC Hills 2 listings against Violet's remaining finishing timeline.
DAMAC Hills 2 Properties for Sale
About DAMAC Hills 2 Master Community
See how Water Town, Sports Town, and Down Town amenities frame daily life around Violet.
DAMAC Hills 2 Community GuideDAMAC Properties Developer Profile
Review DAMAC's delivery record across Dubai master communities before your remaining Violet payment decisions.
DAMAC Properties Developer ProfileFAQs
Violet at DAMAC Hills 2 Construction Progress in April 2026: Frequently Asked Questions
As of the RERA inspection conducted on 14 April 2026, Violet stands at 85.44% construction progress in the DLD project register, against 70.23% at the previous recorded inspection.
No. As of the 14 April 2026 inspection, the expected completion field for project 2734 is empty in the register, which is why no DLD completion date appears anywhere on this page. The only completion date on the file is the developer's anticipated date of June 2026, printed on the Violet payment plans. How inspection cycles lead to completion certification is covered on the Violet construction updates hub.
Yes, and it is worth saying plainly. The anticipated completion date published on the Violet launch and regular payment plans is June 2026. The most recent published inspection, dated 14 April 2026, recorded 85.44%, which is 14.56 points short of a completed project, and no revised date has appeared in the DLD register as of this update. The next inspection reading is the document that will show where delivery now stands.
The inspection notes record enabling, foundation, structural, and internal works as substantially completed, with envelope, MEP, finishes, and infrastructure all progressing at advanced stages and external works progressing at different stages across the site. The progress status for the main contract is recorded as progressing.
Both published plans carry completion linked triggers: the 60/40 launch plan releases 5% at 80% completion and 5% at 90%, while the 70/30 regular plan releases 4% at each of 70%, 80%, and 90% villa completion. A reading of 85.44% therefore sits between the 80% and 90% triggers. Whether your own installment is read against the RERA percentage or against the developer's certification of your specific villa is defined in your SPA, not in the register.
Yes, the window is open. A pre handover inspection is normally booked once a project passes roughly 70% or comes within nine months of expected handover, and Violet clears both tests as of the April 2026 reading, with its anticipated date already behind it. Booking ahead of the handover notice avoids compressing the inspection and the defect rectification into the same few weeks.
The project description in the inspection report reads 526 G+1+R villas, designed as a concrete structure and block with internal and external finishes. In the sales collateral these are the 4 bedroom townhouses in two prototypes, 312 units of 2,352 sq ft and 214 units of 2,415 sq ft, which together account for the 526 units in the register.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the April 2026 inspection record for Violet at DAMAC Hills 2 correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.