Ellington · Dubai South Residential District · Construction Update
Windsor House 2 Construction Update - August 2026
August 2026 DLD Register Reading Places Windsor House 2 at 0.6% in Dubai South Residential District
RERA found enabling works, piling and foundation progressing at Windsor House 2 on 20 August 2026, the inspection date beside its 0.6 percent DLD register reading.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Windsor House 2 Construction Snapshot
A 0.6 point move from an undated 0% previous reading places Windsor House 2 in the enabling and foundations band, where the payment plan, not the site, sets most of what a buyer owes next.
Windsor House 2 by Ellington
4300
Active
0.6%
20 August 2026
12 February 2026
414 Residences
39,161.66 sq m
Q3 2028
Data source: the DLD project register reading for project 4300, registered as WINDSOR HOUSE II, recorded on 20 August 2026, read with the RERA Independent Progress Monitoring Report of the same date, which prints no percentage of its own; the building configuration is as described in that report. The main image on this page is a developer rendering of the planned courtyard, not evidence of site works. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: August 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Windsor House 2 Construction Progress Summary
The DLD register moved Windsor House 2 from an undated 0% to 0.6% at the 20 August 2026 inspection, about six months after the recorded construction start. The RERA report for that date lists enabling works, piling and foundation as progressing and records nothing as complete, so the basement levels, the podium deck and the ten residential floors of each tower all still lie ahead.
- Registered as DLD project 4300 on 13 February 2026
- Construction start recorded as 12 February 2026
- Trust account bank named on the RERA report: Mashreq Bank PSC
- Enabling works on the Dubai South Residential District site
- Piling, progressing per the 20 August 2026 report
- Foundation works, progressing per the same report
- Report progress status: Enabling Works, Progressing
- Basement, lower ground and upper ground levels (B+LG+UG)
- Ten residential floors in each of Tower A and Tower B
- The podium amenity deck between the two towers
- Handover, expected in Q3 2028
Payment Linked Progress
What 0.6% Progress Means for Windsor House 2 Buyers
Windsor House 2 runs a 70/30 plan that mixes calendar and construction triggers, so a 0.6% reading shows which instalments the site can move and which it cannot. By 20 August 2026 none of the four construction-linked instalments, the first due at 20% construction, had been triggered, while the six reservation-date instalments, 50% of the price, fall due within 360 days of each buyer's own reservation date, independent of construction progress. At this stage, four actions matter most.
Verify the escrow account
Reservation-date instalments keep falling due while the site is at its enabling, piling and foundation stage, so every transfer should go only to the DLD regulated escrow account for project 4300 held with Mashreq. Windsor House 2 escrow account verification sets out the check; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA milestone schedule
Check how your sale and purchase agreement defines the instalments linked to 20%, 30%, 40% and 50% construction and the payment on completion, and map those clauses against the Q3 2028 expected handover. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Confirm your Oqood registration
Off-plan units are recorded with the Dubai Land Department through Oqood, the interim register that comes before a title deed. While Windsor House 2 is still at enabling and foundation stage, confirm that your unit appears in Oqood under your name and that its details match your SPA.
Track the readings toward 20%
The first construction-linked instalment falls due at 20% construction, so each register reading between 0.6% and 20% shows how close it is. Windsor House 2 construction updates records every dated reading as it publishes.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 0.6%?
Entering at the enabling and foundation stage trades a longer wait for a longer runway: you choose from plans across Tower A and Tower B rather than from a finished building, and 30% of the price waits for completion. Every payment goes to the DLD-registered escrow account for project 4300, released against construction progress recorded by RERA inspections.
- Enabling works, piling and foundation progressing: the record above is the risk picture
- Four 5% instalments wait for construction milestones from 20%
- 30% held until completion, with handover expected in Q3 2028
- Much of the construction risk resolved before you commit
- A shorter wait between purchase and keys
- A smaller remaining choice of units, floors and views
Limited Units Available on the project page as of this update; availability shifts between cycles.
About the Development
Windsor House 2 Project Details

With enabling works, piling and foundation progressing at the 20 August 2026 inspection, Windsor House 2 is an early-stage development of 414 studio to 3 bedroom apartments in two towers around a landscaped courtyard. Starting prices: AED 716K ≈ USD 195K.
For buyers entering at this stage, the trade off is the longest wait to the keys against the earliest position in the payment plan, with handover expected in Q3 2028.
Windsor House 2 by Ellington Project GuideSite Context This Cycle
Explore Windsor House 2 Location on Dubai Map
On the developer's location aerial, Windsor House 2 fronts Community Road and Boulevard Road, with Tower A and Tower B set on either side of a central courtyard. In August the work recorded on that site was enabling, piling and foundation, so the basement and ground levels that the RERA report describes as B+LG+UG come before any of the ten residential floors.
Dubai South is a master development anchored by Al Maktoum International Airport (DWC), about 10 minutes' drive away per the developer's location guide, with Expo City Dubai about 16 minutes' drive. The district around the site already holds homes and roads in use, so buyers are following one building site rather than an unbuilt district, and the developer's brief ties the area's longer-term story to the planned expansion of DWC. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Windsor House 2 During Early Construction Progress
The enabling and foundations band is when payment protection, unit registration and residency planning are settled, long before handover. Each resource below is matched to where Windsor House 2 stands right now.

Windsor House 2 Construction Updates
This page: the August 2026 inspection record for Windsor House 2, read against its 70/30 plan.

Windsor House 2 Golden Visa: Only 3 Bedroom Apartments Qualify
At Windsor House 2 by Ellington in Dubai South, only 3 bedroom apartments meet the Golden Visa threshold.
Read Windsor House 2 Golden Visa Guide
Windsor House 2 Escrow Account at Mashreq Bank, DLD Project 4300
Windsor House 2 by Ellington escrows 414 residences at Mashreq Bank under DLD project 4300 in Dubai South.
Verify Windsor House 2 Escrow AccountUpdate Timeline
Other Windsor House 2 Construction Updates
August 2026 is the first dated reading published for Windsor House 2; each new inspection joins the record on the construction updates hub, reading by reading.
Where This Update Fits
Explore Windsor House 2 Structure
This August 2026 report is one node in the wider Windsor House 2 record: the apartment market around the site, the Dubai South Residential District community itself, and Ellington as developer.

Dubai South Residential District: Inara Residence in the Freehold Core
Dubai South Residential District, the established freehold core of Dubai South, lists Inara Residence apartments on a 60/40 payment plan.
See Dubai South Residential District Properties for Sale
Dubai South Residential District: A Freehold Zone Beside Expo City Dubai
Dubai South Residential District has gated villa, townhouse and apartment communities, a lagoon beachfront and freehold title for all nationalities.
Explore the Dubai South Residential District Community
Ellington Properties: Design-Led Boutique Residences With Curated Interiors
Ellington Properties, founded in 2014, is a design-led developer of apartments, villas and waterfront homes, with 30 developments launched and delivered.
View the Ellington Developer ProfileFAQs
Windsor House 2 Construction Progress in August 2026: Frequently Asked Questions
The Dubai Land Department project register shows Windsor House 2, project 4300, at 0.6% construction progress, recorded on 20 August 2026, against a previous inspection value of 0% that carries no date. The RERA report of the same date prints no percentage of its own and gives the site status as Enabling Works, Progressing.
Handover is expected in Q3 2028. At the time of the 20 August 2026 reading, the DLD project register recorded a completion date of 31-07-2029. Both dates can be revised between inspection cycles, so buyers should confirm the current construction and handover timetable with the developer in writing; how readings and register dates are followed over time is set out in the Windsor House 2 construction updates record.
The Independent Progress Monitoring Report dated 20 August 2026 found enabling works, piling and foundation progressing at the time of inspection, for a project described as B+LG+UG+10 Floors, 2 Buildings (Tower A and Tower B). No element of the build is recorded as complete, and the report carries inspection photographs.
The register pairs the 0.6% reading of 20 August 2026 with a previous inspection value of 0% but shows no date for that earlier value, so no measured pace between the two readings can be calculated. Counted instead from the recorded construction start of 12 February 2026, the average is about 0.1 points per month (arithmetic over the first six months, not a forecast).
No. The 70/30 plan ties four 5% instalments to completion of 20%, 30%, 40% and 50% construction, and the 0.6% reading of 20 August 2026 had not reached the first of them. Instalments paid up to that point followed the reservation-date schedule in each buyer's SPA, and the final 30% is paid on completion.
No. The main image is a developer rendering of the planned landscaped residential courtyard, used to illustrate this update, and it is not evidence of site works or construction progress. The RERA report for 20 August 2026 carries its own inspection photographs, which are not reproduced on this page.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the August 2026 inspection record for Windsor House 2 correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.