Sobha Realty · Sobha Hartland 2 · Construction Update
320 Riverside Crescent Construction Update - August 2026
August 2026 DLD Register Reading Places 320 Riverside Crescent at 56.67% Construction Progress in Sobha Hartland 2
With the substructure complete, structure works, external envelope, MEP and internal finishes now advance together at 320 Riverside Crescent, logged at 56.67 percent on 24 August 2026.
Direct advisor access. Every message answered personally, never by a call center.
DLD Project Register Data
320 Riverside Crescent Construction Snapshot
Past the halfway mark at 56.67%, 320 Riverside Crescent sits in the envelope and MEP band, the stage where the register reading starts to shape mid-plan payment checks, resale conversations and Golden Visa checks.
320 Riverside Crescent by Sobha Realty
3088
Active
56.67%
24 August 2026
10 May 2024
630 residential units
63,061.93 sq m
Q3 2027
Data source: Dubai Land Department project register entry for project 3088, reading of 24 August 2026, read with the RERA Independent Progress Monitoring Report from the same visit, which describes the works and the 2B+G+4P+59F+R configuration but prints no percentage. The register lists the project as registered on 30 May 2024, with construction start recorded as 10 May 2024. Progress tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: August 2026.
The hero image on this page is a developer rendering of the planned towers, not a site photograph, and does not show the construction stage recorded on 24 August 2026. Message me on WhatsApp
This Inspection Cycle
320 Riverside Crescent Construction Progress Summary
The DLD register placed 320 Riverside Crescent at 56.67% on 24 August 2026, 6.51 points above the previous reading of 50.16%, which the register lists without a date, so the gain cannot be spread across a known period. The RERA report from the same visit closes out the below-ground phase and shows every later trade under way at once.
- Enabling works on the tower site
- Foundation works
- Substructure works, recorded as completed in the RERA report
- Structure works, recorded as progressing at good stages
- External envelope works
- MEP: mechanical, electrical, and plumbing installations
- Internal works and internal finishes, at different stages
- Completion of the structure through 59 floors and the roof
- Podium amenity deck, from the leisure pool to the sensory garden
- Further register readings from 56.67% toward 100%
- Handover expected in Q3 2027
Payment Linked Progress
What 56.67% Progress Means for 320 Riverside Crescent Buyers
320 Riverside Crescent runs on a 60/40 plan: 20% at booking, 40% during construction and 40% on handover. A register reading of 56.67% therefore lands in the middle of the construction share, and how much of that 40% is already due at today's stage is set in each SPA; ask Sobha Realty for the schedule. At this stage, four actions matter most.
Verify the escrow account
Every construction installment should go only to the DLD regulated escrow account registered for project 3088, held with Emirates NBD. 320 Riverside Crescent escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Map your SPA against this reading
Check how your sale and purchase agreement times the 40% construction share and compare those clauses with the 56.67% reading of 24 August 2026. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Confirm your Oqood registration
An off plan purchase at 320 Riverside Crescent is recorded on the DLD interim register, known as Oqood, against project 3088. Check that the unit, buyer names and price on that record match your SPA, since any resale or assignment before handover runs through it and through Sobha Realty's own conditions.
Track the remaining cycles
43.33 points remain between the August 2026 reading and 100%, recorded one RERA visit at a time. The 320 Riverside Crescent construction updates hub logs each new reading as it appears in the register.
General framework, not legal advice: payment triggers, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 56.67%?
Entering a tower past its halfway reading trades part of the launch-stage installment runway for a shorter wait: the below-ground works are recorded as complete, handover is expected in Q3 2027, and the remaining choice is between the units still available. Every payment goes to the DLD-registered escrow account for project 3088, released against construction progress recorded in the DLD register.
- Enabling, foundation and substructure works recorded as completed
- Q3 2027 expected handover, about a year after this reading
- 40% of the 60/40 plan due on handover; the construction 40% is timed in each SPA
- Construction risk carried from excavation onward
- Two to four years of waiting is the usual delivery horizon
- Longest installment runway, priced at launch levels
3 units listed available on the project page as of this update; availability shifts between cycles.
About the Development
320 Riverside Crescent Project Details

With the substructure complete and structure works still progressing, 320 Riverside Crescent is a mid-construction tower of 630 residences, offered as 1, 1.5, 2 and 3 bedroom apartments within Sobha Realty's Riverside Crescent cluster. Starting prices: AED 1.42M ≈ USD 387K.
For buyers entering at this stage, the trade off is a shorter wait than at launch against less of the construction 40% left to spread, with handover expected in Q3 2027 and the 2 and 3 bedroom types priced above the AED 2M ≈ USD 545K Golden Visa property threshold.
320 Riverside Crescent by Sobha Realty Project GuideSite Context This Cycle
Explore 320 Riverside Crescent Location on Dubai Map
320 Riverside Crescent is one tower in the Riverside Crescent cluster, which Sobha Realty describes as six towers arranged in a tapered crescent inside Sobha Hartland 2, with unit plans labelling views over the lagoons, the community or the creek depending on the unit. Its two basements, ground floor and four podium levels sit beneath 59 floors, so the envelope and MEP works recorded this cycle run through both the residential stack and the podium that will carry the pool deck.
Sobha Hartland 2 sits beside Ras Al Khor Road and Al Meydan Road, next to the original Sobha Hartland, and Sobha Realty's brochure puts Downtown Dubai about 10 minutes and Dubai International Airport about 12 minutes away. The arterial roads are already in place while the community's school, mall and clubhouses form part of the wider masterplan, so buyers weighing occupancy or rental plans against Q3 2027 should check which community facilities will be open by then. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in 320 Riverside Crescent at Mid-Construction
Past the halfway mark, the questions shift to residency eligibility and to where the construction installments go. Each resource below is matched to where 320 Riverside Crescent stands in August 2026.

320 Riverside Crescent Construction Updates
This page: the 24 August 2026 DLD register reading for 320 Riverside Crescent at 56.67 percent.

320 Riverside Crescent Golden Visa: Qualifying Apartments and Eligibility Guide
Explore 320 Riverside Crescent Golden Visa eligibility, qualifying two and three bedroom apartments, off-plan application timing and complimentary VIP assistance.
Read 320 Riverside Crescent Golden Visa Guide
320 Riverside Crescent Escrow Account: DLD Registration and Bank Verification
Verify 320 Riverside Crescent's Emirates NBD escrow account, DLD registration, payment safeguards and bank details before transferring property installments.
Verify 320 Riverside Crescent Escrow AccountUpdate Timeline
Other 320 Riverside Crescent Construction Updates
August 2026 is the first published reading for 320 Riverside Crescent on this site; the hub collects every cycle as the register moves toward handover.
Where This Update Fits
Explore 320 Riverside Crescent Structure
This monthly report is one node in the wider record: the Sobha Hartland 2 market around the tower, the master community it belongs to, and the developer building it.

Sobha Hartland 2 Properties for Sale: Riverside Crescent and Skyscape Apartments
Explore Sobha Hartland 2 properties for sale, comparing Riverside Crescent and Skyscape apartments, payment plans, handover dates and availability.
See Sobha Hartland 2 Properties for Sale
Sobha Hartland 2: A Swimmable Lagoon Master Community in Bukadra
Sobha Hartland 2 is Sobha Realty's second MBR City master community, with 15 named projects around a swimmable lagoon.
Explore the Sobha Hartland 2 Community
Sobha Realty: In-House Construction, From High-Grade Materials to the Façade Panels
Sobha Realty controls every stage of construction itself, from producing high-grade materials to the marble flooring and façade panels.
View the Sobha Realty Developer ProfileFAQs
320 Riverside Crescent Construction Progress in August 2026: Frequently Asked Questions
320 Riverside Crescent stood at 56.67% construction progress in the Dubai Land Department project register on 24 August 2026, under project number 3088 with status Active. The RERA Independent Progress Monitoring Report from the same visit describes the works but prints no percentage of its own, so 56.67% is the register's figure.
The register showed 50.16% as the previous inspection reading when the 24 August 2026 figure of 56.67% was recorded. That earlier reading carries no date in the record, so the gap between the two readings cannot be converted into a monthly pace.
The report for the 24 August 2026 visit records enabling, foundation and substructure works as completed, structure works progressing at good stages, and the external envelope, MEP, internal works and internal finishes progressing at different stages. It lists the main contract as progressing and describes the building as two basements, ground, four podium levels, 59 floors and a roof.
Nothing in the 24 August 2026 record used for this page revises the Q3 2027 handover stated for 320 Riverside Crescent. A register reading measures built progress rather than setting a timetable, and the handover quarter remains Sobha Realty's to confirm; how the readings compare with the pace that Q3 2027 implies is tracked on the 320 Riverside Crescent construction updates hub.
Under the 60/40 plan, 40% is paid during construction, but the 56.67% reading alone does not show how much of that share has fallen due. How the construction 40% is timed, and how much of it is already payable for a buyer signing after August 2026, is set in each SPA, so the schedule should be requested from Sobha Realty and read against the register.
No. The image used for the August 2026 update is a developer rendering of the planned towers and does not show any construction stage. The register record for the 24 August 2026 visit carries inspection photographs, which remain part of the DLD and RERA record and are not reproduced here.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the August 2026 inspection record for 320 Riverside Crescent correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.