
Sobha Realty · Sobha Hartland 2 · Construction Update
350 Riverside Crescent Construction Update - August 2026
August 2026 Inspection Records 350 Riverside Crescent at 57.85% Construction Progress in Sobha Hartland 2
The RERA report describes structure works at an advanced stage, with envelope, MEP and finishes progressing, as the DLD register records 350 Riverside Crescent at 57.85 percent.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
350 Riverside Crescent Construction Snapshot
A 7.78 point rise over the previous register reading of 50.07%, which the register shows without a date, takes 350 Riverside Crescent past the halfway mark and into the envelope and MEP band, where checking the build against your payment schedule matters most.
350 Riverside Crescent by Sobha Realty
3083
Active
57.85%
18 August 2026
10 May 2024
742 residential units
62,125.97 sq m
Q4 2027
Data source: DLD project register reading for inspection dated 18 August 2026 (project registered 03 June 2024), with the RERA Independent Progress Monitoring Report of the same date for the works description and tower configuration; that report prints no percentage. Q4 2027 is the handover quarter stated by Sobha Realty. The hero image is a Sobha Realty project rendering, not a site photograph, and shows no construction progress. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: August 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
350 Riverside Crescent Construction Progress Summary
The RERA report dated 18 August 2026 describes project 3083 working on two fronts at once: structure works progressing at an advanced stage, while internal works, the external envelope, internal finishes and MEP move forward at different stages. The register reading of 57.85% sits against a previous reading of 50.07% that carries no date, and the main contract is listed as progressing.
- Enabling works for the tower and podium
- Foundation works
- Substructure works, as recorded in the RERA report
- Structure works at an advanced stage per the RERA report
- External envelope, progressing at different stages
- Internal works and internal finishes
- MEP systems: mechanical, electrical and plumbing
- Remaining structure works up to the 59 floors and roof
- Envelope, MEP and finishes across the 742 residences
- Further RERA inspection cycles toward 100% and the Q4 2027 handover
Payment Linked Progress
What 57.85% Progress Means for 350 Riverside Crescent Buyers
Sobha Realty's 80/20 plan places 60% of the price in the construction phase, so the 57.85% register reading is a payment question as much as a progress one: how much of that 60% is already due at today's stage is set in each SPA. Past the halfway mark, four actions matter most.
Verify the escrow account
Every construction payment should go only to the DLD regulated escrow account registered for project 3083. 350 Riverside Crescent escrow account verification comes before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Map your SPA against the 60%
Ask Sobha Realty for the schedule showing how much of the construction 60% falls due on signing at this stage and how the rest is triggered, read alongside the Q4 2027 handover quarter. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Confirm your Oqood registration
Off plan units are recorded on the DLD interim register, Oqood, after booking; check that your unit sits under project 3083 before construction payments continue. The purchase price recorded there is also the value a Golden Visa application is measured against, as the 350 Riverside Crescent Golden Visa guide explains.
Track the remaining cycles
With 42.15 points still to be recorded before Q4 2027, several more register readings will land before handover. 350 Riverside Crescent construction updates hub logs each one as it publishes.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 57.85%?
Entering at this stage trades part of the launch-era installment runway for evidence: enabling, foundation and substructure works are recorded as completed, the RERA report puts the structure at an advanced stage, and the handover quarter is a little over a year away. Every payment goes to the DLD-registered escrow account for project 3083, released against recorded construction progress.
- Recorded build: the register reading and RERA notes above set the risk picture
- Handover quarter Q4 2027, a little over a year after this reading
- Part of the construction 60% may already be due; your SPA sets how much
- Construction risk carried from excavation through to handover
- A delivery horizon usually measured in years, not quarters
- Longer installment runway at launch-stage pricing
9 units listed available on the project page as of this update; availability shifts between cycles.
About the Development
350 Riverside Crescent Project Details

With substructure works completed and the structure at an advanced stage in the 18 August 2026 RERA report, 350 Riverside Crescent is a mid-construction Sobha Realty tower of 742 residences in 1, 1.5 and 2 bedroom layouts. Starting prices: AED 1.09M ≈ USD 297K.
For buyers entering at this stage, the trade off is a shorter wait to the Q4 2027 handover against a larger share of the 80/20 plan falling due on or soon after signing.
350 Riverside Crescent by Sobha Realty Project GuideSite Context This Cycle
Explore 350 Riverside Crescent Location on Dubai Map
350 Riverside Crescent is one of the six towers Sobha Realty arranges in a tapered crescent in Sobha Hartland 2, a single tower of two basements, a ground level, four podium levels and 59 floors plus roof according to the RERA report. In a building of that height, an advanced structure stage running alongside envelope, MEP and finishes usually means the trades are stacked by level, with later packages following the frame upward through this cycle.
Sobha Realty plans Sobha Hartland 2 as a master community of about 8 million sq ft with an international school, offices, a mall, clubhouses and retail, so buyers weighing a Q4 2027 move-in or rental plan should check which of those facilities will be open by handover rather than assume a finished district. The developer's brochure places Downtown Dubai and Meydan Racecourse about 10 minutes from Sobha Hartland 2 and Dubai International Airport about 12. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in 350 Riverside Crescent During Mid-Construction Progress
Past the halfway mark, payment protection and residency eligibility are the two checks that cannot wait for handover. Each resource below is matched to where 350 Riverside Crescent stands right now.

350 Riverside Crescent Construction Updates
This page: the August 2026 register reading of 57.85% and RERA notes for 350 Riverside Crescent.

350 Riverside Crescent Golden Visa: Only 2 Bedroom Apartments Qualify
350 Riverside Crescent by Sobha has three apartment layouts, but only 2 bedroom units exceed the AED 2M Golden Visa threshold.
Read 350 Riverside Crescent Golden Visa Guide
350 Riverside Crescent Escrow Account: Emirates NBD, DLD Project 3083
350 Riverside Crescent's 742 residences use an Emirates NBD escrow account under DLD project 3083, inspected at 57.85% in August 2026.
Verify 350 Riverside Crescent Escrow AccountUpdate Timeline
Other 350 Riverside Crescent Construction Updates
August 2026 opens the monthly record for 350 Riverside Crescent on this site; each later register reading joins the hub as it publishes, so the tower can be followed reading by reading.
Where This Update Fits
Explore 350 Riverside Crescent Structure
This monthly report is one node in the wider record: the Sobha Hartland 2 market around the tower, the master community it belongs to, and the developer building both.

Sobha Hartland 2 Properties for Sale: Riverside Crescent and Skyscape Apartments
Explore Sobha Hartland 2 properties for sale, comparing Riverside Crescent and Skyscape apartments, payment plans, handover dates and availability.
See Sobha Hartland 2 Properties for Sale
Sobha Hartland 2: A Swimmable Lagoon Master Community in Bukadra
Sobha Hartland 2 is Sobha Realty's second MBR City master community, with 15 named projects around a swimmable lagoon.
Explore the Sobha Hartland 2 Community
Sobha Realty: In-House Construction, From High-Grade Materials to the Façade Panels
Sobha Realty controls every stage of construction itself, from producing high-grade materials to the marble flooring and façade panels.
View the Sobha Realty Developer ProfileFAQs
350 Riverside Crescent Construction Progress in August 2026: Frequently Asked Questions
As of the inspection dated 18 August 2026, the Dubai Land Department project register records 350 Riverside Crescent, project 3083, at 57.85% construction progress, up from a previous register reading of 50.07% that is shown without a date. The RERA progress report issued for the same inspection describes the works but prints no percentage of its own, so the register figure is the one to quote.
No change is stated: Q4 2027 remains the handover quarter Sobha Realty gives for 350 Riverside Crescent as of this update, and the 18 August 2026 RERA report records the state of the works, not a revised date. A handover quarter can still move between inspection cycles; any revision would come from Sobha Realty and the DLD project record and would be reflected on the 350 Riverside Crescent construction updates hub.
The Independent Progress Monitoring Report for project 3083 records enabling, foundation and substructure works as completed, and structure works progressing at an advanced stage, with internal works, the external envelope, internal finishes and MEP progressing at different stages. It describes the building as two basements, a ground level, four podium levels, 59 floors and a roof, and the register record carries inspection photographs that are not published here.
The register view used for this update shows 50.07% as the previous inspection beside the 18 August 2026 reading but does not display when that earlier inspection took place. This page therefore gives it no month and calculates no pace between the two readings; the only dated figures are the 10 May 2024 construction start, the 03 June 2024 registration and the August 2026 reading.
No. The hero image is a Sobha Realty project rendering of the planned pool deck and surrounding towers, used to illustrate the August 2026 update, and it shows no actual construction progress. The progress evidence for this month is the DLD register reading and the written RERA report, not the image.
Under the 80/20 plan, 20% is paid at booking, 60% during construction and 20% on completion, and the 57.85% reading of 18 August 2026 places the tower past the halfway mark of construction. How much of the construction 60% is already due at this stage is set in each SPA, so a buyer entering after this reading should ask Sobha Realty for the unit's schedule before signing.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the August 2026 inspection record for 350 Riverside Crescent correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.