Amazonia at Al Jaddaf Waterfront by Palladium Developments in Al Jaddaf Waterfront project rendering used for the June 2026 construction update showing street level and full exterior views of the planned residential tower in Dubai - Presented by Tohid Fetrat

Palladium Developments · Al Jaddaf Waterfront · Construction Update

Amazonia at Al Jaddaf Waterfront Construction Update - June 2026

June 2026 DLD Register Reading Places Amazonia at 0.02% at the Pre-Construction Stage in Al Jaddaf Waterfront

Mobilization was progressing on site when Amazonia was inspected on 29 June 2026, and the DLD register logged 0.02% for this pre-construction tower beside Dubai Creek.

Direct advisor access. Every message answered personally, never by a call center.

0.02%DLD Register Reading
29 June 2026Inspection Date
Q3 2027Expected Handover
3595DLD Project Number

DLD Register Inspection Data

Amazonia Construction Snapshot

Up 0.02 of a point from 0% at the previous inspection (undated in the register view), Amazonia sits at the opening of the earliest stage band, 0 to 20%, where the record so far shows a mobilizing site rather than built works.

Project Name

Amazonia at Al Jaddaf Waterfront

Project Number

3595

Project Status

Active

Construction Progress

0.02%

Inspection Date

29 June 2026

Construction Start

20 October 2025

Total Units

75 residences

Total Built Area

6,335.94 sq m

Expected Completion

Q3 2027

Data source: the DLD project register for project 3595, reading of 29 June 2026, with the Independent Progress Monitoring Report from the same inspection recording the Progress Status; that report prints no percentage. The image at the top of this page is a developer rendering of the planned tower, not a site photograph. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: June 2026.

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

This Inspection Cycle

Amazonia Construction Progress Summary

The only dated reading in the register view is 0.02% on 29 June 2026, set against a previous inspection shown at 0% with no date attached, so no monthly pace can be measured from this pair. The reading came 252 days after Amazonia was registered and construction formally started on 20 October 2025, and the independent progress report from the same visit classed the project as Pre-Construction - Progressing.

Completed
  • DLD registration as project 3595 on 20 October 2025
  • Registered construction start on the same date
  • Escrow trust account on record with Abu Dhabi Islamic Bank
In Progress at 0.02%
  • Mobilization recorded as progressing on site at the 29 June 2026 inspection
  • Progress Status logged as Pre-Construction - Progressing
  • Register reading moved off an undated 0% baseline
Ahead of Handover
  • Excavation and foundation works for the single tower
  • Structure of all 12 storeys, then the facade and its external waterfall
  • Fit out of the 75 residences and handover, expected Q3 2027
Next inspectionAppears in the DLD register for project 3595 after the next RERA site visit, with no date announced in advance; the 29 June 2026 reading was 94 days old when this record was compiled.
Completion targetHandover expected in Q3 2027; the registered completion date in the DLD record is 30 October 2027, 488 days after this reading.
Remaining distance99.98 percentage points remain; spread over those 488 days that is about 6.15 points per 30-day month (arithmetic, not a forecast).

Payments Versus Progress

What 0.02% Progress Means for Amazonia Buyers

Amazonia runs on a time-linked 60/40 plan, so instalments fall due on each buyer's own calendar regardless of site progress: a 0.02% reading neither pauses nor triggers a payment. While the record shows mobilization and not yet structure, four checks matter most.

Before Any Transfer

Verify the escrow account

Every instalment should go only to the DLD regulated escrow account registered for project 3595, held with Abu Dhabi Islamic Bank. The Amazonia escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.

Before Booking

Map your SPA against the calendar

Check how your sale and purchase agreement dates the 10% instalments after one and two months, the 5% instalments every two months after that, and the handover notice for Q3 2027. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the register readings.

After Booking

Confirm your Oqood registration

Oqood is the DLD off plan registration of your unit. Once issued, it should name project 3595 and your unit, the same project the register showed at 0.02% on 29 June 2026, before any later instalment is paid.

Every Cycle

Track the next readings

With a single dated reading on file, the coming inspections will show when works move beyond mobilization. The Amazonia construction updates hub logs each reading as it is recorded.

General framework, not legal advice: instalment dates, notice periods, and payment obligations are set by your individual SPA and the DLD record, and both should be read directly.

Buying at 0.02%?

Entering at the pre-construction stage trades certainty for runway: no structure is recorded yet, the time-linked instalments start from your own booking date, and 40% of the price waits until handover. Every payment goes to the DLD-registered escrow account for project 3595, released against verified construction progress.

Entering Now at 0.02%
  • Pre-Construction - Progressing at the 29 June 2026 inspection
  • 40% of the 60/40 plan deferred to handover, expected Q3 2027
  • 5% every two months once the first three instalments are paid
Typical Late Stage Entry
  • Structure largely visible before you commit
  • Months rather than years to wait for handover
  • A larger share of the price due within a short window
AED 920K ≈ USD 251KStarting Price
60/40 Plan40% Due on Handover
Q3 2027Expected Handover
Ask What Is Available at Amazonia

23 Units Available on the project page as of this update; availability shifts between cycles.

About the Development

Amazonia Project Details

Amazonia at Al Jaddaf Waterfront rooftop terrace with lounge seating, palm trees, and waterfall feature in Dubai Presented by Tohid Fetrat
Al Jaddaf Waterfront · Palladium Developments

Recorded as a mobilizing pre-construction site in June 2026, Amazonia is planned as one 12-storey tower of 75 studio to three bedroom residences on the Dubai Creek side of Al Jaddaf. Starting prices: AED 920K ≈ USD 251K.

For buyers entering at this stage, the trade off is the longest wait in the build cycle against the full instalment runway: 60% is paid on a calendar from your booking date and 40% on handover, expected in Q3 2027.

Amazonia at Al Jaddaf Waterfront Project Guide

Site Context This Cycle

Explore Amazonia Location on Dubai Map

Amazonia sits on a waterfront plot in Al Jaddaf Waterfront, the stretch the developer brochure also calls Dubai Wharf, running parallel to Dubai Creek. On a single tower site, mobilization, the stage the 29 June 2026 inspection recorded, generally means establishing access, hoarding, and temporary facilities before excavation can begin.

Al Jaddaf Waterfront is a mixed-use freehold community by Dubai Properties, and the brochure places Al Jaddaf Metro Station a one-minute walk from the building, so Amazonia is rising beside an existing metro station rather than waiting on future links, which matters for buyers modelling rent or occupancy from Q3 2027. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Amazonia on Dubai Map

Buyer Resources for This Project

Investing in Amazonia at the Pre-Construction Stage

Before the structure rises, payment protection and residency eligibility are the two questions that cannot wait. Each resource below is matched to where Amazonia stands at the June 2026 reading.

Amazonia at Al Jaddaf Waterfront by Palladium Developments in Al Jaddaf Waterfront construction updates cover image featuring project renderings of the residential tower from front and angled exterior views in Dubai - Presented by Tohid Fetrat
You Are Here

Amazonia Construction Updates

This page: the June 2026 DLD register reading for Amazonia, recorded at 0.02% during site mobilization.

Amazonia at Al Jaddaf Waterfront by Palladium Developments in Al Jaddaf Waterfront Golden Visa graphic with a gold visa card beside a project rendering of the residential tower in Dubai - Presented by Tohid Fetrat

Amazonia at Al Jaddaf Waterfront Golden Visa: One Creekside Tier

Palladium's Amazonia at Al Jaddaf Waterfront, 75 residences on Dubai Creek, qualifies only at the 3 bedroom apartment.

Read the Amazonia Golden Visa Guide
Amazonia at Al Jaddaf Waterfront by Palladium Developments in Al Jaddaf Waterfront escrow account protection graphic with shield and padlock icons above the project building entrance rendering in Dubai - Presented by Tohid Fetrat

Amazonia at Al Jaddaf Waterfront: Palladium's Abu Dhabi Islamic Bank Escrow

Amazonia at Al Jaddaf Waterfront, DLD project 3595, escrows 76 units at Abu Dhabi Islamic Bank, 0.02% certified June 2026.

Verify the Amazonia Escrow Account

Update Timeline

Other Amazonia Construction Updates

June 2026 opens the monthly record for Amazonia on this site; each later inspection will be added as its own update, reading by reading.

All Amazonia Construction Updates

FAQs

Amazonia Construction Progress in June 2026: Frequently Asked Questions

At the inspection of 29 June 2026, the DLD project register recorded Amazonia, project 3595, at 0.02% construction progress. The register view shows the previous inspection at 0% without a date, so the June figure is the first dated position on file rather than a measured rate of progress.

Nothing in the June 2026 record moves the expected handover, which remains Q3 2027. With only one dated reading of 0.02%, there is no measured pace yet from which to judge the schedule either way, and dates held in the DLD register can be revised between inspection cycles. How the timeline is followed across cycles is covered on the Amazonia construction updates hub.

It is the Progress Status printed on the Independent Progress Monitoring Report for the 29 June 2026 inspection, and it places the project before main construction with activity moving forward. That report prints no percentage of its own; the 0.02% figure for the same date comes from the DLD project register.

The inspection notes for 29 June 2026 state that mobilization was progressing on site. Nothing beyond mobilization was recorded at that inspection, so no excavation, foundation, or structural progress should be read into the June 2026 record.

The register view for project 3595 lists the previous inspection as 0% with no date beside it. Without a date there is no time span to divide the 0.02 point change by, so no monthly pace can be drawn from the pair; the change only confirms that the record moved off zero by 29 June 2026.

No date for the next inspection is announced in advance. A new reading appears in the DLD project register for project 3595 after the next RERA site visit, and it becomes the next dated entry in the Amazonia construction record once it is published.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the June 2026 inspection record for Amazonia at Al Jaddaf Waterfront correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts