AVA at Palm Jumeirah
AVA at Palm Jumeirah reached 79.84% construction progress at its 27 February 2026 inspection, with completion expected on 30 June 2026. As the OMNIYAT residences move through finishing, this is the stage to prepare an independent pre-handover snagging inspection, so defects can be documented and raised with the developer before you accept your residence.
Progress recorded at the latest site inspection. Handover timing is set by the developer.
Snagging at a Glance
AVA at Palm Jumeirah is moving toward its 30 June 2026 completion, the handover-preparation stage where a snagging inspection protects an ultra-luxury purchase.
The inspection covers AVA's full-floor 3 and 4 bedroom residences, the 4 bedroom duplex, and the 5 bedroom penthouse, with attention to private pools, terraces, and full-height glazing.
Pricing is indicative by residence type, since a 32,160 sq ft penthouse takes far longer to inspect than a full-floor 3 bedroom home.
Defects are documented with photographs, locations, and recommended actions for OMNIYAT rectification, with optional reinspection.
Advanced Construction Phase

AVA at Palm Jumeirah has moved through completed foundation and substructure works into superstructure, facade installation, MEP systems, internal finishes, and external works, with construction progress recorded at 79.84% at the 27 February 2026 inspection and completion expected on 30 June 2026. Late-stage finishing and commissioning define the quality you receive at handover, so an inspection now captures issues while OMNIYAT can still correct them before you sign for the residence.
Because AVA delivers only 17 ultra-luxury residences, from full-floor 3 and 4 bedroom homes to a 4 bedroom duplex and a 5 bedroom penthouse with private pools, expansive terraces, and approximately 4 metre ceilings, the defects that matter vary far more by residence than in a standard apartment tower. Inspecting against the specific layout you are buying produces a more useful record than a generic checklist. You can confirm the live build stage any time on the construction updates hub, with the latest figures drawn from the February 2026 construction update. New to the topic? Start with the complete Property Snagging Guide.
Project Profile

AVA at Palm Jumeirah, Dorchester Collection Dubai is an ultra-prime waterfront address by OMNIYAT, offering only 17 private residences at the entrance of Palm Jumeirah and defined by expansive layouts, private pools, panoramic terraces, and uninterrupted Gulf and Dubai skyline views. Managed by Dorchester Collection, it combines bespoke hospitality services, resort-style amenities, and exceptional privacy. Explore the full project profile, layouts, and investment detail before your inspection.
Plan Before Handover
Before handover, AVA buyers should review construction progress, Golden Visa eligibility, and escrow protection together. These resources help OMNIYAT residence buyers make safer, better-informed decisions on Palm Jumeirah ahead of completion.



Matched to Your Residence
The inspection is matched to your residence type, from a full-floor 3 bedroom home to the 5 bedroom penthouse, then covers the complete residence:
Prefer a printable version to take to your handover? Use the room-by-room snagging checklist.
The Wider Picture
Snagging should be reviewed alongside the wider Palm Jumeirah setting, the available residences, and OMNIYAT's developer record. These resources help buyers understand the property context before handover.



Ultra-Luxury Residences
Ultra-luxury full-floor and multi-level waterfront residences show a different defect profile from standard apartments near handover:
For the Buyer, Not the Developer

An independent snagging inspection works only for the buyer, not the developer, so the report reflects your interests at handover. Each AVA residence is assessed against a structured finishing and commissioning checklist, and every defect is recorded with a photograph, a location, and a recommended action. For a 4 bedroom duplex or the 5 bedroom penthouse, that documented record is especially valuable, because larger multi-level layouts carry far more premium finishes to verify before you accept the residence from OMNIYAT.
Indicative Pricing
There is no fixed snagging tariff in Dubai, so fees vary by firm and scale with the size and complexity of the residence. Ultra-luxury residences like those at AVA are commonly priced per square foot of built-up area, typically AED 0.50 to AED 1.50 per sq ft, because there is more glazing, terrace, pool, and premium finish to verify. The indicative ranges below reflect AVA's confirmed residence sizes, from the full-floor 3 bedroom home to the 5 bedroom penthouse, and a sample report is available before you commit.
| Residence type at AVA at Palm Jumeirah | Approx. size | Indicative inspection cost (AED) |
|---|---|---|
| 3 Bedroom Residence | 6,593 sq ft | AED 3,300 to 9,900 |
| 4 Bedroom Residence | 7,024 to 7,303 sq ft | AED 3,500 to 11,000 |
| 4 Bedroom Duplex Residence | 16,164 sq ft | AED 8,000 to 24,000+ |
| 5 Bedroom Penthouse | 32,160 sq ft | AED 16,000 to 48,000+ |
| Reinspection After Rectification | Per visit | Free to AED 1,500 |
Three things change any quote, so confirm them before booking. First, whether 5% VAT is included or added on top. Second, the inspection depth, since a basic visual check costs less than a premium inspection that adds thermal imaging, moisture metering, and air conditioning and water-pressure testing across the residence. Third, whether one reinspection after rectification is included or charged separately. For a 4 bedroom duplex or 5 bedroom penthouse at AVA, the comprehensive tier with full systems and thermal checks is the better fit, given the scale and the number of premium finishes to verify. For why this is money well spent, see how snagging saves you money.
Your Recourse
Buyers at AVA at Palm Jumeirah are not without recourse once they accept the residence. Under Dubai practice, a new home carries a developer rectification period for finishing and installation defects after handover, and a longer warranty applies to major structural elements of the building. A documented snagging inspection strengthens your position within those windows, because defects raised on a dated, photographed report are easier to pursue than issues recalled later, which is particularly relevant across the larger duplex and penthouse layouts. For the full picture of your rights, see the guide to the defect liability period and structural warranty.
How It Works
Book your inspection around your handover appointment for AVA at Palm Jumeirah.
A full walkthrough of the residence, glazing, terraces, pool, systems, and finishes.
A documented report with photographs, defect locations, and recommended actions.
The report is structured for submission to OMNIYAT for correction.
A return visit to confirm the listed defects have been resolved.
See exactly how defects at an ultra-luxury Palm Jumeirah residence are documented, categorized, and presented for developer rectification before you book your own inspection at AVA.
Time-sensitive
With AVA at Palm Jumeirah at 79.84% construction and approaching its 30 June 2026 completion, the weeks before delivery are the time to prepare your inspection and protect your purchase before acceptance.
Book a Snagging InspectionCommon Questions
The best time is close to handover. With AVA recorded at 79.84% construction progress at its 27 February 2026 inspection and completion expected on 30 June 2026, buyers should arrange an independent inspection around their handover appointment so defects can be raised with OMNIYAT before they accept the residence.
Fees vary by firm and residence size. AVA's ultra-luxury residences are commonly priced per square foot of built-up area, typically AED 0.50 to AED 1.50 per sq ft, so a full-floor 3 bedroom residence sits in the low thousands while the 5 bedroom penthouse runs considerably higher given its 32,160 sq ft. Confirm whether VAT and a reinspection are included, and a sample report is available before booking.
Yes. The 4 bedroom duplex and 5 bedroom penthouse are checked for items a full-floor residence may not have, including multiple terraces and bathrooms, private pool areas, motorized sliding doors, and extensive floor-to-ceiling glazing across split levels.
Dubai practice provides a developer rectification period for finishing defects after handover and a longer warranty on major structural elements. A dated, photographed snagging report strengthens any request for correction within those windows.
Yes. Every defect is recorded with a photograph, its location within the residence, and a recommended action, so the report is ready for OMNIYAT rectification.
Yes. An optional reinspection confirms that the listed defects at your AVA residence have been resolved before you finalize acceptance.
The Complete Guide
This page covers snagging for AVA at Palm Jumeirah specifically. For the wider how-to of inspecting any new Dubai home, these guides go deeper.