Bay Grove Residences Phase 1 Construction Update - June 2025

June 2025 Inspection Records Bay Grove Residences Phase 1 at a 0% Baseline on Dubai Islands

Bay Grove Residences Phase 1 enters the DLD register at 0% on 17 June 2025, the starting line for every later inspection of its four-building site.

Direct advisor access. Every message answered personally, never by a call center.

0%DLD Register Reading
17 June 2025Inspection Date
September 2028Scheduled Handover
3293DLD Project Number

Dated DLD Register Data

Bay Grove Residences Phase 1 Construction Snapshot

A 0% baseline dated 17 June 2025 sets Phase 1 at the very start of the enabling and foundations band, so this entry measures nothing yet and anchors everything that follows: each later reading is read against it.

Project Name

Bay Grove Residences Phase 1 by Nakheel

Project Number

3293

Project Status

Active

Construction Progress

0%

Inspection Date

17 June 2025

Construction Start

22 December 2024

Total Units

296 residential units

Total Built Area

40,086.68 sq m

Expected Completion

15 March 2028

Data source: the Dubai Land Department project register (Dubai REST, listed as "Bay Grove Residences, Dubai Islands") and the Independent Progress Monitoring Report for the inspection conducted on 17 June 2025. This page is a record of that inspection: the reading was 465 days old when the page was prepared in September 2026, and later readings appear on the following monthly updates. The hero image is developer project imagery, not an inspection photograph. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: June 2025.

Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp

This Inspection Cycle

Bay Grove Residences Phase 1 Construction Progress Summary

The 17 June 2025 inspection is the first dated entry for Phase 1. The monitoring report recorded the status as Pre-Construction - On Hold, noting no progress seen at site since the last visit and the project still in the tendering stage. The register lists the project as registered on 04 October 2024, with construction start recorded as 22 December 2024.

On Record
  • DLD project 3293 registered on 04 October 2024, status Active
  • Construction start recorded in the register as 22 December 2024
  • Escrow trust account held with First Abu Dhabi Bank P.J.S.C.
Recorded at 0%
  • Progress status: Pre-Construction - On Hold
  • Inspector note: no progress seen at site since the last visit
  • Inspector note: project still in the tendering stage
  • Three inspection photographs filed with the 17 June 2025 entry
Ahead of Handover
  • Enabling works for one combined basement and ground level
  • Four buildings: B+G+8+R, B+G+13+R, B+G+7+R and B+G+20+R
  • 296 apartments from 1 bedroom units to 4 bedroom penthouses
  • Handover scheduled by Nakheel for September 2028
Next inspectionPublished in the DLD project register after the next RERA site visit; the next dated reading in this record is covered on the January 2026 update.
Completion target15 March 2028 is the registered completion date in the DLD record, 1,002 days after this inspection; Nakheel schedules handover for September 2028.
Remaining distanceThe full 100 percentage points lay ahead of the 17 June 2025 reading.

Payment Linked Progress

What 0% Progress Means for Bay Grove Residences Phase 1 Buyers

Phase 1 launched on a date-based schedule rather than a construction-linked one: 70% across the down payment and six dated instalments, and 30% on handover in September 2028. At a 0% reading, instalments therefore follow the calendar, not the site, which makes four checks the priority.

Before Any Transfer

Verify the escrow account

Every payment should go only to the DLD regulated escrow account registered for project 3293, held with First Abu Dhabi Bank. Bay Grove Residences Phase 1 escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.

Before the Next Instalment

Reread your SPA payment schedule

Check whether your sale and purchase agreement ties each instalment to a calendar date or to a construction milestone, and how it defines the September 2028 handover. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the recorded register readings.

After Booking

Confirm your Oqood registration

Oqood is the Dubai Land Department's interim register entry for an off plan unit. Confirm that your Phase 1 unit is registered under project 3293 in your own name before further instalments fall due.

Every Cycle

Track the register from the baseline

The first move off 0% and the first change of report status are the readings to watch. Bay Grove Residences Phase 1 construction updates hub keeps every dated entry in one place.

General framework, not legal advice: payment dates, milestone definitions, and notice periods are set by your individual SPA and the DLD record, and both should be read directly.

Buying at 0%?

Entering at a 0% reading means carrying the whole construction timeline in exchange for the first choice of layouts, floors and views across four buildings. Every payment goes to the DLD-registered escrow account for project 3293, released against inspected construction progress.

Entering at the 0% Baseline
  • Register reading of 0% dated 17 June 2025, the full build ahead
  • Registered completion date 15 March 2028; handover scheduled for September 2028
  • 30% of the launch schedule due on handover, not during construction
Typical Late Stage Entry
  • Most construction risk already resolved before purchase
  • A much shorter wait between purchase and handover
  • Narrower choice of layouts and floors as stock is absorbed
AED 1.85M ≈ USD 504KStarting Price
70/30 Launch Schedule30% Due on Handover
September 2028Scheduled Handover
Ask What Is Available at Bay Grove Residences Phase 1

Availability is not part of the DLD record and shifts between cycles; current units and booking terms are confirmed at reservation and set out in the SPA.

About the Development

Bay Grove Residences Phase 1 Project Details

Bay Grove Residences Phase 1 beachfront exterior view of the waterfront apartments on Island B at Dubai Islands Presented by Tohid Fetrat
Dubai Islands · Nakheel

At the June 2025 inspection, Phase 1 was recorded at 0% with its site in tendering: a plan of 296 residential units in four buildings over one combined basement, from 1 bedroom apartments to 4 bedroom penthouses. Starting prices: AED 1.85M ≈ USD 504K.

For buyers entering at this point, the trade off is the longest wait in the build against the widest choice of units, with handover scheduled by Nakheel for September 2028.

Bay Grove Residences Phase 1 by Nakheel Project Guide

Site Context This Cycle

Explore Bay Grove Residences Phase 1 Location on Dubai Map

Phase 1 holds the first plot you reach on arriving at Island B, inside the island's Marina district, with its four buildings set behind the 500 m frontage of Crystal Beach. The monitoring report describes a single combined basement and ground level beneath all four buildings, so the register follows the plot as one construction site rather than four, and in June 2025 that site recorded no progress.

Dubai Islands is a district still taking shape, tied to the mainland by the new access bridge and Infinity Bridge, which the developer fact sheet places 6 minutes from the project, with Dubai International Airport 18 minutes away. For buyers at a 0% reading, that means the neighborhood and the building are maturing on parallel timelines toward the September 2028 handover. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Bay Grove Residences Phase 1 on Dubai Map

Buyer Resources for This Project

Investing in Bay Grove Residences Phase 1 Before Construction Starts on Site

At the baseline stage, the questions that matter are where your payments are held and whether the purchase supports residency. Each resource below is matched to where Phase 1 stood in June 2025.

Bay Grove Residences Phase 1 waterfront towers and lagoon-style beachfront community featured on the construction updates page in Dubai Presented by Tohid Fetrat
You Are Here

Bay Grove Residences Phase 1 Construction Updates

This page: the 17 June 2025 register entry for Phase 1, its first dated reading.

Bay Grove Residences Phase 1 waterfront community with UAE Golden Visa concept featured in Dubai Presented by Tohid Fetrat

Bay Grove Residences Phase 1 Golden Visa: 296 Island B Units

Nakheel's Bay Grove Residences Phase 1 on Island B qualifies at 2 and 3 bedroom apartments and the 4 bedroom penthouse.

Read Bay Grove Residences Phase 1 Golden Visa Guide
Bay Grove Residences Phase 1 waterfront residence with escrow account security concept in Dubai Presented by Tohid Fetrat

Bay Grove Residences Phase 1 Escrow: Nakheel's Island B Account

Bay Grove Residences Phase 1, DLD project 3293, escrows 296 units at First Abu Dhabi Bank, certified 6.6% in July 2026.

Verify Bay Grove Residences Phase 1 Escrow Account

Update Timeline

Other Bay Grove Residences Phase 1 Construction Updates

June 2025 opens the Phase 1 record; every later inspection is read against this 0% baseline, one dated entry at a time.

All Bay Grove Residences Phase 1 Construction Updates

FAQs

Bay Grove Residences Phase 1 Construction Progress in June 2025: Frequently Asked Questions

The Dubai Land Department project register recorded 0% for Bay Grove Residences Phase 1 (project 3293) at the inspection dated 17 June 2025. It is the first dated reading in this record. The register app also lists a previous inspection at 0% without a date, so no change or pace can be measured from this entry.

The register carried a registered completion date of 15 March 2028, while the developer's payment schedule estimates construction completion for September 2028, the scheduled handover. Registered dates can be revised between inspection cycles, and the handover terms that bind a buyer are the ones set out in the individual sales and purchase agreement.

It is the progress status the Independent Progress Monitoring Report assigned to Phase 1 at the 17 June 2025 inspection. The same report noted no progress seen at site since the last visit and the project still in the tendering stage. The report gives no reason for the status, and this record adds none: it describes the site on that date only.

Tendering is the procurement period in which a developer invites and evaluates contractor bids for the construction works before the main packages are awarded. A project recorded in this stage has typically not yet mobilised a main contractor on site, which matches the 0% register reading and the no-progress note on the 17 June 2025 report for Phase 1.

The entry has two parts carrying the same inspection date, 17 June 2025. The Dubai REST register screen shows the percentage (0% current, 0% previous, three inspection photos), while the downloadable Independent Progress Monitoring Report prints no percentage and instead gives the progress status, the inspector notes, and the four-building project description. How to read each part over time is covered on the Bay Grove Residences Phase 1 construction updates hub.

Three fields in the next register entry: whether the reading moves above 0%, whether the report status changes from Pre-Construction - On Hold to an active works status, and whether the registered completion date of 15 March 2028 stays unchanged. The next dated inspection in this record is covered on the Bay Grove Residences Phase 1 January 2026 construction update.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the June 2025 inspection record for Bay Grove Residences Phase 1 correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.