Emaar Properties · Emaar Beachfront · Construction Update
Bayview by Address Resorts Construction Update - September 2026
September 2026 Inspection Records Bayview by Address Resorts at 63.02% with the Superstructure Progressing at Advanced Stages at Emaar Beachfront
On 14 September 2026 Bayview by Address Resorts recorded 63.02%, its superstructure progressing at advanced stages, with internal, envelope, MEP, finishing, and external works alongside.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Bayview by Address Resorts Construction Snapshot
A 14.10 point rise in the 76 days after the 30 June 2026 reading, about 5.57 points per month and the fastest pace between any two dated readings in the record, took Bayview by Address Resorts to 63.02% on 14 September 2026, the first reading above the 60% level that the 2023 schedule ties to its 8th instalment.
Bayview by Address Resorts
2646
Active
63.02%
14 September 2026
15 October 2023
676 residential units
84,972.40 sq m
July 2028
Data source: RERA inspection conducted on 14 September 2026, tracked against DLD inspection records and the Independent Progress Monitoring Report filed for that visit, with 48.92% on 30 June 2026 as the reading before it. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. As of 24 September 2026 this reading is 10 days old and is the latest in the DLD register; the Bayview by Address Resorts construction updates record will carry any reading taken after it. The beachfront towers and the family on the shoreline shown at the top of this page are a project rendering, not a site photograph. Last updated: September 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Bayview by Address Resorts Construction Progress Summary
Between the 30 June 2026 and 14 September 2026 inspections, Bayview by Address Resorts moved from 48.92% to 63.02%, a 14.10 point gain over 76 days, or about 5.57 points per month: the fastest pace of any dated pair in the record, above the 3.08 and 2.90 points per month of the two pairs before it, although the 14.30 points of the February to June 2026 pair remain the larger single gain. The IPMR Progress Status held at "Main Contract - Progressing", while the notes changed their wording: enabling, piling and foundation, and substructure work are now substantially completed, the superstructure has a line of its own as progressing at advanced stages, internal work, external envelope, MEP works, internal finishes, and external works progress at different stages, and mobilization is named as ongoing, a line absent from the February and June 2026 notes.
- Enabling, piling and foundation, and substructure work, described as substantially completed in the September 2026 IPMR
- The 10%, 20%, 40%, and 60% construction completion levels of the 2023 schedule, the 60% level first passed at this reading
- Registered construction start of 15 October 2023, 1,065 days before this inspection
- Superstructure, recorded on its own line as progressing at advanced stages
- Internal work, external envelope, MEP works, internal finishes, and external works, each progressing at different stages
- Mobilization, listed as ongoing for the first time since October 2025
- RERA photographs of an open ceiling grid carrying cable trays and ductwork, and of a white-walled corridor ending at a dark door
- 80% construction completion, 16.98 points above this reading and the trigger for the 9th instalment on the 2023 schedule
- The rest of the superstructure of both towers over their shared podium (Tower 1: Ground + 49 floors; Tower 2: Ground + 34 floors, per the IPMR)
- Handover in July 2028, set against the registered completion date of 31 July 2028
Payment Linked Progress
What 63.02% Progress Means for Bayview by Address Resorts Buyers
At 63.02% Bayview by Address Resorts stood 3.02 points above the 60% construction completion that the 2023 schedule links to its 8th instalment, estimated for March 2027, and 16.98 points below the 80% linked to its 9th, estimated for September 2027. With the 60% level on the record, four actions matter most.
Verify the escrow account
The 9th instalment, keyed to 80% on the 2023 schedule, sat 16.98 points above this reading, and like each construction-linked payment before it, it belongs only in the DLD regulated escrow account registered for project 2646, which the September 2026 IPMR places with Abu Dhabi Commercial Bank. Bayview by Address Resorts escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Match your SPA to the 60% reading
The register first showed Bayview above 60% at this 14 September 2026 inspection, and the 2023 schedule gives March 2027 as the estimated date for the 8th instalment tied to that level, so check whether your sale and purchase agreement and Oqood entry call that instalment by the recorded level, by the estimated date, or by a developer notice. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Note the finishes now under way
The September 2026 notes run internal finishes alongside a superstructure at advanced stages, and the RERA photographs show one corridor with white walls and ceiling beside another still under an open ceiling grid; at handover, each fully furnished, Address Resorts branded home is inspected across those finishes as well as furniture, fitted furnishings, joinery, glazing, balconies, and MEP fittings. Bayview by Address Resorts snagging inspection guide lists what that inspection covers.
Price any assignment off the dated record
With the register past 60% after the fastest interval on record, a buyer or seller weighing an assignment before handover should work from dated readings rather than from the recent pace, and 63.02% stays current only until RERA's next visit. Bayview by Address Resorts construction updates sets out all ten dated readings in order; the assignment conditions themselves sit in your SPA and the developer's consent terms.
General framework, not legal advice: how the 60% and 80% construction-linked instalments are called, how an assignment is approved, and how the 4% DLD registration fee applies are set by your own SPA and the DLD record, so read both directly.
Buying After the September 2026 Reading?
As of 24 September 2026, the 63.02% reading of 14 September 2026 is 10 days old and the latest in the DLD register, so a purchase made now starts from it, with any instalment already due by date or by construction level handled on the developer's current terms rather than the 2023 launch schedule. Every payment goes to the DLD-registered escrow account for project 2646, released against construction progress recorded in the DLD register.
- 63.02% recorded on 14 September 2026, with the superstructure at advanced stages
- The 10%, 20%, 40%, and 60% triggers of the 5th to 8th instalments all passed on the record
- 3.02 points above the 60% trigger and 16.98 points below the 80% trigger
- Later dated readings on the record to set beside this one
- Any further construction-linked level passed by then, handled on the developer's current terms
- Less time left to wait before the July 2028 handover
3+ Units Available listed on the project page as of September 2026; availability shifts between cycles.
About the Development
Bayview by Address Resorts Project Details

At 63.02% on 14 September 2026, the first reading past the 60% level of the 2023 schedule, Bayview by Address Resorts had its superstructure at advanced stages with finishing trades at work inside: 676 branded, fully furnished residences, from 1 bedroom apartments to 6 bedroom penthouses. Starting prices: AED 3.30M ≈ USD 899K.
A buyer entering at this reading faced about one year and ten months to handover in July 2028, with four construction-linked levels of the 2023 schedule on the record and two, 80% and 100%, still ahead.
Bayview by Address Resorts Project GuideSite Context This Cycle
Explore Bayview by Address Resorts Location on Dubai Map
The IPMR places plot 3648 in Marsa Dubai, and the two September 2026 exterior photographs taken there look up the towers against a clear sky: one shows curved balcony edges stacked floor after floor with blue protective film over much of the glazing and a lifting mast along one face, and the other, from street level, shows a tower crane still at a crown, a second tower and crane to its left, and a low glass-fronted building with traffic signals in front.
Around the plot, Emaar Beachfront's beach, promenade, and road link to Sheikh Zayed Road were in use at this reading, so what Bayview buyers can still watch change is the project's own frontage: the notes list external works progressing at different stages, and the brochure's ground-level plan of a waterfront urban plaza, retail and dining, and a private beach is the documented intent those works are meant to deliver by the July 2028 handover. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Bayview by Address Resorts Past the 60% Level
With the 60% level on the record and 80% next, 16.98 points away, escrow routing, residency planning, and the scope of the furnished handover each deserve a fresh look. Each resource below is matched to Bayview by Address Resorts at 63.02%.

Bayview by Address Resorts Construction Updates
This page: Bayview's 63.02% record of 14 September 2026, its superstructure at advanced stages.

Bayview by Address Resorts at Emaar Beachfront Golden Visa: Six Tiers
Emaar's 676-residence Bayview by Address Resorts at Emaar Beachfront qualifies at every tier from the 1 bedroom to 6 bedroom penthouse.
Read Bayview by Address Resorts Golden Visa Guide
Bayview by Address Resorts at Emaar Beachfront: Its Escrow Account
Bayview by Address Resorts at Emaar Beachfront, DLD project 2646: Abu Dhabi Commercial Bank escrow, 63.02% certified September 2026.
Verify Bayview by Address Resorts Escrow Account
Bayview by Address Resorts at Emaar Beachfront Snagging for Furnished Homes
Bayview by Address Resorts at Emaar Beachfront is Emaar Properties' fully furnished, branded development: 676 residences in two towers.
Read Bayview by Address Resorts Snagging GuideUpdate Timeline
Other Bayview by Address Resorts Construction Updates
The June 2026 update that precedes this one records 48.92% and the first IPMR mention of external works; with September 2026 as the tenth dated reading, the hub lays out the whole sequence from the 0% reading of May 2023 onward.
Where This Update Fits
Explore Bayview by Address Resorts Structure
The September 2026 visit found the superstructure at advanced stages on a two-tower beachfront plot; the cards below widen the view to the Emaar Beachfront community, the developer behind Bayview, and the listings a buyer would compare against it.

Emaar Beachfront Properties for Sale
Browse apartments and penthouses for sale in Emaar Beachfront, Dubai's private beach community in Dubai Harbour.
See Emaar Beachfront Properties for Sale
Emaar Beachfront: A Private-Beach Island Community Inside Dubai Harbour
Emaar Beachfront holds 27 residential towers and around 10,000 homes along a private beachfront, with two marinas, retail and dining.
Explore the Emaar Beachfront Community
Emaar Properties: Burj Khalifa, Downtown Dubai and Twenty Master Communities
Emaar, founded in 1997, built Burj Khalifa and Downtown Dubai and has delivered over 85,000 homes across twenty master communities.
View the Emaar Properties Developer ProfileFAQs
Bayview by Address Resorts Construction Progress in September 2026: Frequently Asked Questions
The RERA inspection of 14 September 2026 recorded Bayview by Address Resorts, DLD project 2646, at 63.02% construction progress, the tenth dated reading in its record, and the Independent Progress Monitoring Report (IPMR) filed for that visit kept the Progress Status at "Main Contract - Progressing". As of 24 September 2026 the reading is 10 days old and is still the latest entry in the DLD register; any reading taken after it will be added to the Bayview by Address Resorts construction updates record in date order.
At the 14 September 2026 inspection, 36.98 percentage points were still to be recorded, and the registered completion date of 31 July 2028 lay 686 days ahead, about one year and ten months, with handover set for July 2028. Spread evenly over those 686 days, the remaining points come to about 1.62 points per month: an arithmetic benchmark only, not a forecast, and a figure that would change if the register revised its completion date.
The DLD register moved from 48.92% on 30 June 2026 to 63.02% on 14 September 2026, a gain of 14.10 points over 76 days, or about 5.57 points per month. That is the fastest pace between any two dated readings in the record, above the 3.08 points per month of the October 2025 to February 2026 pair and the 2.90 of the February to June 2026 pair, although the 14.30 points gained between February and June 2026 remain the larger single step. The 76 days between the two visits are also the shortest interval between any two readings since the record opened in May 2023.
The September 2026 IPMR notes read: "Project construction activity brief: At the time of inspection found;Mobilization on going.Enabling,piling and foundation and Substructure work substantially completed. Superstructure progressing at advanced stages. Internal work, External Envelope, MEP works, Internal finishes and External works progressing at different stages." The report reproduces four inspection photographs, while the Dubai REST card counts ten: an upward view of one tower against a clear sky, its curved balcony edges stacked floor after floor, blue protective film over much of the glazing, and a lifting mast along one face; a street-level view of a tower with a tower crane at its crown and a hoist up its side, a second tower and crane to the left, and a low glass-fronted building and traffic signals in front; an interior corridor under an open metal ceiling grid with cable trays, ductwork, a red vertical pipe, and a lamp hanging on a white cable, between partly boarded walls with a stepladder beyond; and a narrow corridor with white walls and ceiling, small fittings on the walls, and a dark door at its far end.
Three changes stand out against the June 2026 notes. Enabling, piling and foundation, and substructure work, listed as completed in every set of notes from October 2025 to June 2026, are now described as substantially completed; the superstructure moves to a line of its own as progressing at advanced stages, where the earlier notes grouped it with the works progressing at different stages; and mobilization is named as ongoing, a line last seen in the October 2025 notes. The IPMR gives no reason for any of these changes, and this page draws no conclusion from them.
On the 2023 launch schedule of record, the 10% 8th instalment is tied to 60% construction completion with an estimated date of March 2027, and the 10% 9th instalment to 80%, estimated for September 2027. The 63.02% reading of 14 September 2026 was the first in the record above the 60% trigger, sitting 3.02 points above it and 16.98 points below the 80% trigger. Whether and how either level appears on a particular buyer's invoices is governed by that buyer's own SPA, and anyone buying today does so on the developer's current terms.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the September 2026 inspection record for Bayview by Address Resorts at Emaar Beachfront correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.