Beach Walk Residence 2 Construction Update - August 2026

August 2026 Inspection Records Beach Walk Residence 2 at 100% in the DLD Register on Island A, Dubai Islands

Deep cleaning and developer snagging and de-snagging were under way at Beach Walk Residence 2 on 6 August 2026, with the Building Completion Certificate issued in July.

Direct advisor access. Every message answered personally, never by a call center.

100%DLD Register Progress
6 August 2026Inspection Date
ReadyHandover Status
3224DLD Project Number

Verified DLD Inspection Data

Beach Walk Residence 2 Construction Snapshot

A 2.85 point step from a previous register reading of 97.15%, which carries no date, brings Beach Walk Residence 2 to 100% and into the handover preparation band, where the record matters less for construction risk and more for the completion payment and acceptance.

Project Name

Beach Walk Residence 2 by Imtiaz

Project Number

3224

Project Status

Finished

Construction Progress

100%

Inspection Date

6 August 2026

Construction Start

10 August 2024

Total Units

63 residences

Total Built Area

7,116.87 sq m

Expected Completion

10 August 2026, met

Data source: the DLD project register for project 3224, listed on Dubai REST as Beach Walk Residences 2, read with the RERA inspection report dated 6 August 2026, which records the Progress Status as Completed and prints no percentage of its own. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. The image at the top of this page is a developer rendering, not a site photograph. Last updated: August 2026.

Want to know the day the record changes? Message me on WhatsApp and I will send it to you directly: one message when the status changes, nothing else. Message me on WhatsApp

This Inspection Cycle

Beach Walk Residence 2 Construction Progress Summary

Measured from the registered construction start on 10 August 2024 to the 6 August 2026 reading, Beach Walk Residence 2 covered the full 100 points in 726 days, about 4.13 points per month on a 30-day month: arithmetic over the whole build, not a forecast. The register recorded 100% on 6 August 2026, four days before the registered completion date of 10 August 2026, and the RERA report lists the building as Completed.

Completed
  • Concrete structure and blockwork across the G+2P+8F+R building
  • Internal and external finishes, recorded as substantially completed
  • Dubai Civil Defence certificate issued 27-04-2026 and DCD LPG approval issued 16-07-2026
  • Building Completion Certificate issued 9 July 2026
  • DEWA water and electricity meters installed, air conditioning connected by DEWA
In Progress at 100%
  • Deep cleaning across the building, recorded on 6 August 2026
  • The developer's own snagging and de-snagging programme at site
  • Handover readiness for the 63 furnished residences, status Ready
Ahead of Handover
  • Completion notice and the 40% completion payment under each SPA
  • An independent snagging inspection by each buyer before acceptance
  • Key release, utility accounts and service charge set-up, on dates the developer confirms
Next inspectionNo further RERA progress reading is needed: the register stands at 100% and the 6 August 2026 report reads Completed, so the next change to watch is the start of handover.
Completion target10 August 2026 registered completion date, met: the register recorded 100% on 6 August 2026, four days before it.
Remaining distanceZero percentage points remain after the August 2026 reading, so no required-rate figure applies.

Payment Linked Progress

What 100% Progress Means for Beach Walk Residence 2 Buyers

Beach Walk Residence 2 launched on a date-based 60/40 schedule, and by the 6 August 2026 reading all six dated instalments, 60% of the price, had fallen due against 100% registered progress, leaving the 40% completion payment as the remaining step on the plan of record. With the building complete, four actions matter most.

Before the Completion Payment

Verify the escrow account

The 40% completion payment should go only to the DLD regulated escrow account registered for project 3224, searchable on Dubai REST as Beach Walk Residences 2. Beach Walk Residence 2 escrow account verification is the step before that transfer; the lookup itself takes about two minutes against the official DLD project record.

Before You Sign Completion Documents

Reread your SPA handover clauses

Check how your sale and purchase agreement defines the completion notice, the 40% completion payment and the handover period, and read those clauses against the Building Completion Certificate issued on 9 July 2026. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.

Window Open Now

Book your independent snagging inspection

At 100% with the BCC issued, the inspection window is open now, and the developer's own snagging recorded on 6 August 2026 is not an inspection on your behalf. Beach Walk Residence 2 snagging inspection guide covers what to check in a furnished unit before you accept handover.

Through Handover

Track the handover record

No further progress readings are needed, but the project's status can still change after the 6 August 2026 inspection. Beach Walk Residence 2 construction updates hub keeps the complete record in one place.

General framework, not legal advice: completion notices, handover periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.

Buying at 100%?

Entering at this point trades payment-plan runway for certainty: the building is complete on the record, its Building Completion Certificate is issued, and the remaining choice is between the units still available. Payments on this project run through the DLD-registered escrow account for project 3224, released against recorded construction progress; confirm in writing where any payment for a remaining unit is directed.

Entering Now at 100%
  • Completed building: the BCC was issued on 9 July 2026
  • Handover status Ready, with no construction wait ahead
  • Terms on a remaining unit set by the developer, confirmed in writing
Typical Launch Entry
  • Build risk carried through every stage until completion
  • A multi-year wait is the usual horizon from launch to keys
  • A longer instalment runway at launch-stage pricing
AED 1.90M ≈ USD 517KStarting Price
63 ResidencesTotal in the Building
ReadyHandover Status
Ask What Is Available at Beach Walk Residence 2

Limited units available, as listed on the project page at this update; availability shifts between cycles.

About the Development

Beach Walk Residence 2 Project Details

Beach Walk Residence 2 by Imtiaz in Island A at Dubai Islands project rendering of the residential building with flowing white balconies, landscaped grounds and palm trees in Dubai - Presented by Tohid Fetrat
Island A, Dubai Islands · Imtiaz

With its Building Completion Certificate issued on 9 July 2026, Beach Walk Residence 2 is a finished G+2P+8F+R building of 63 fully furnished 1 and 2 bedroom apartments and 3 bedroom duplexes on Island A. Starting prices: AED 1.90M ≈ USD 517K.

For buyers entering now, the trade off is paying for a completed home that can be inspected before purchase rather than spreading payments across a build, with handover status Ready and terms on each remaining unit confirmed with the developer.

Beach Walk Residence 2 by Imtiaz Project Guide

Site Context This Cycle

Explore Beach Walk Residence 2 Location on Dubai Map

Beach Walk Residence 2 occupies a single plot on Island A at Dubai Islands, a short walk from the beach with the mall across the road according to the developer's brochure. That compact position shaped the final cycle: with building works recorded as substantially completed, the 6 August 2026 inspection found the site at the deep cleaning and snagging stage rather than at external works.

Island A is a district that is still filling in around its finished buildings, reached by road over the Infinity Bridge, and the developer's brochure lists Mall by Nakheel at two minutes and Dubai International Airport at about 10 minutes by car. For buyers deciding whether to occupy or let a ready, furnished unit now, an open beachfront beside a neighbourhood still taking shape is the context to price in. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Interactive Dubai real estate map preview
Click to view Beach Walk Residence 2 by Imtiaz on Dubai Map

Buyer Resources for This Project

Investing in Beach Walk Residence 2 at Completion and Handover

At a completed building three decisions arrive together: whether your unit supports a Golden Visa, where the completion payment goes, and what to check before you sign for the keys. The guides below take them one at a time.

Beach Walk Residence 2 by Imtiaz in Island A at Dubai Islands construction updates cover image featuring a project rendering of a white residential tower with rounded balconies viewed from above in Dubai - Presented by Tohid Fetrat
You Are Here

Beach Walk Residence 2 Construction Updates

This page: the 6 August 2026 inspection record for Beach Walk Residence 2 at 100%.

Beach Walk Residence 2 by Imtiaz in Island A at Dubai Islands Golden Visa concept graphic with a gold card beside a rendered rooftop pool and curved residential terraces in Dubai - Presented by Tohid Fetrat

Beach Walk Residence 2 Golden Visa: 2 Bedroom and 3 Bedroom Duplex

Beach Walk Residence 2, Imtiaz's 63 residences on Island A, qualifies at 2 bedroom apartments and 3 bedroom duplexes.

Read Beach Walk Residence 2 Golden Visa Guide
Beach Walk Residence 2 by Imtiaz in Island A at Dubai Islands escrow account concept graphic with a shield and padlock in front of a rendered residential tower in Dubai - Presented by Tohid Fetrat

Beach Walk Residence 2 Escrow: The Second Release, Fully Certified

Beach Walk Residence 2, DLD project 3224, read 100% certified August 2026, its 63 units escrowed at First Abu Dhabi Bank.

Verify Beach Walk Residence 2 Escrow Account
Beach Walk Residence 2 by Imtiaz in Island A at Dubai Islands snagging inspection graphic over a rendered bedroom with an upholstered bed and full-height windows in Dubai - Presented by Tohid Fetrat

Beach Walk Residence 2 Snagging: Apartments and 3 Bedroom Duplexes

Beach Walk Residence 2 is configured as G+2P+8F+R, holding 63 fully furnished residences, 1 and 2 bedroom apartments plus duplexes.

Book Beach Walk Residence 2 Snagging

Update Timeline

Other Beach Walk Residence 2 Construction Updates

August 2026 is the first monthly record published for Beach Walk Residence 2, so the hub below is where the full inspection history sits, from the August 2024 start to the completed building.

All Beach Walk Residence 2 Construction Updates

FAQs

Beach Walk Residence 2 Construction Progress in August 2026: Frequently Asked Questions

As of the RERA inspection conducted on 6 August 2026, Beach Walk Residence 2 stands at 100% in the DLD project register, where project 3224 carries the status Finished. The inspection report itself prints no percentage: it records the Progress Status as Completed, so the 100% figure is a register reading rather than a number taken from the report.

The register shows a previous inspection reading of 97.15% beside the 6 August 2026 figure, but it does not show the date of that earlier inspection. Without a date no monthly pace can be measured between the two readings, so this page plots 97.15% as an undated point on the progress track rather than as a dated entry.

The inspector found all building construction activities substantially completed on the G+2P+8F+R residential building. The report lists the Dubai Civil Defence (DCD) certificate issued 27-04-2026, the DCD LPG approval issued 16-07-2026 and the Building Completion Certificate issued 9 July 2026, together with all DEWA water and electricity meters installed, air conditioning connected by DEWA, and deep cleaning plus the developer's snagging and de-snagging progressing at site.

Not on its own. The 6 August 2026 record shows a completed building with the developer's deep cleaning and snagging still in progress and a handover status of Ready, but no source on file records any unit as transferred to its buyer. Handover starts with the developer's completion notice under each sale and purchase agreement, and the status may have moved on since the inspection date.

The DLD register lists construction as started on 10 August 2024 and the project as registered on 28 August 2024, 18 days later. Both dates are printed here exactly as recorded. The register gives no reason for the order, and it does not change the 6 August 2026 reading of 100%.

No. It is a side-by-side pair of developer renderings showing two planned exterior views of the building, used to illustrate this update, and it does not show physical construction progress. The RERA inspection report carries inspection photographs, which are record documents and are not reproduced on this page.

A Question the FAQ Can Not Answer?

Portrait of Tohid Fetrat, Dubai real estate advisor and portfolio manager with expertise in luxury developments

Your Advisor

Tohid Fetrat

Independent of the developer: I work for the buyer, and my only job on this page is helping you read the August 2026 inspection record for Beach Walk Residence 2 correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.

Ask your question, get your answer. No obligation and no follow-up unless you ask for it.

Get Progress Alerts