Imtiaz · Island A, Dubai Islands · Construction Update
Beach Walk Residence 2 Construction Update - August 2026
August 2026 Inspection Records Beach Walk Residence 2 at 100% in the DLD Register on Island A, Dubai Islands
Deep cleaning and developer snagging and de-snagging were under way at Beach Walk Residence 2 on 6 August 2026, with the Building Completion Certificate issued in July.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Beach Walk Residence 2 Construction Snapshot
A 2.85 point step from a previous register reading of 97.15%, which carries no date, brings Beach Walk Residence 2 to 100% and into the handover preparation band, where the record matters less for construction risk and more for the completion payment and acceptance.
Beach Walk Residence 2 by Imtiaz
3224
Finished
100%
6 August 2026
10 August 2024
63 residences
7,116.87 sq m
10 August 2026, met
Data source: the DLD project register for project 3224, listed on Dubai REST as Beach Walk Residences 2, read with the RERA inspection report dated 6 August 2026, which records the Progress Status as Completed and prints no percentage of its own. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. The image at the top of this page is a developer rendering, not a site photograph. Last updated: August 2026.
Want to know the day the record changes? Message me on WhatsApp and I will send it to you directly: one message when the status changes, nothing else. Message me on WhatsApp
This Inspection Cycle
Beach Walk Residence 2 Construction Progress Summary
Measured from the registered construction start on 10 August 2024 to the 6 August 2026 reading, Beach Walk Residence 2 covered the full 100 points in 726 days, about 4.13 points per month on a 30-day month: arithmetic over the whole build, not a forecast. The register recorded 100% on 6 August 2026, four days before the registered completion date of 10 August 2026, and the RERA report lists the building as Completed.
- Concrete structure and blockwork across the G+2P+8F+R building
- Internal and external finishes, recorded as substantially completed
- Dubai Civil Defence certificate issued 27-04-2026 and DCD LPG approval issued 16-07-2026
- Building Completion Certificate issued 9 July 2026
- DEWA water and electricity meters installed, air conditioning connected by DEWA
- Deep cleaning across the building, recorded on 6 August 2026
- The developer's own snagging and de-snagging programme at site
- Handover readiness for the 63 furnished residences, status Ready
- Completion notice and the 40% completion payment under each SPA
- An independent snagging inspection by each buyer before acceptance
- Key release, utility accounts and service charge set-up, on dates the developer confirms
Payment Linked Progress
What 100% Progress Means for Beach Walk Residence 2 Buyers
Beach Walk Residence 2 launched on a date-based 60/40 schedule, and by the 6 August 2026 reading all six dated instalments, 60% of the price, had fallen due against 100% registered progress, leaving the 40% completion payment as the remaining step on the plan of record. With the building complete, four actions matter most.
Verify the escrow account
The 40% completion payment should go only to the DLD regulated escrow account registered for project 3224, searchable on Dubai REST as Beach Walk Residences 2. Beach Walk Residence 2 escrow account verification is the step before that transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA handover clauses
Check how your sale and purchase agreement defines the completion notice, the 40% completion payment and the handover period, and read those clauses against the Building Completion Certificate issued on 9 July 2026. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Book your independent snagging inspection
At 100% with the BCC issued, the inspection window is open now, and the developer's own snagging recorded on 6 August 2026 is not an inspection on your behalf. Beach Walk Residence 2 snagging inspection guide covers what to check in a furnished unit before you accept handover.
Track the handover record
No further progress readings are needed, but the project's status can still change after the 6 August 2026 inspection. Beach Walk Residence 2 construction updates hub keeps the complete record in one place.
General framework, not legal advice: completion notices, handover periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 100%?
Entering at this point trades payment-plan runway for certainty: the building is complete on the record, its Building Completion Certificate is issued, and the remaining choice is between the units still available. Payments on this project run through the DLD-registered escrow account for project 3224, released against recorded construction progress; confirm in writing where any payment for a remaining unit is directed.
- Completed building: the BCC was issued on 9 July 2026
- Handover status Ready, with no construction wait ahead
- Terms on a remaining unit set by the developer, confirmed in writing
- Build risk carried through every stage until completion
- A multi-year wait is the usual horizon from launch to keys
- A longer instalment runway at launch-stage pricing
Limited units available, as listed on the project page at this update; availability shifts between cycles.
About the Development
Beach Walk Residence 2 Project Details

With its Building Completion Certificate issued on 9 July 2026, Beach Walk Residence 2 is a finished G+2P+8F+R building of 63 fully furnished 1 and 2 bedroom apartments and 3 bedroom duplexes on Island A. Starting prices: AED 1.90M ≈ USD 517K.
For buyers entering now, the trade off is paying for a completed home that can be inspected before purchase rather than spreading payments across a build, with handover status Ready and terms on each remaining unit confirmed with the developer.
Beach Walk Residence 2 by Imtiaz Project GuideSite Context This Cycle
Explore Beach Walk Residence 2 Location on Dubai Map
Beach Walk Residence 2 occupies a single plot on Island A at Dubai Islands, a short walk from the beach with the mall across the road according to the developer's brochure. That compact position shaped the final cycle: with building works recorded as substantially completed, the 6 August 2026 inspection found the site at the deep cleaning and snagging stage rather than at external works.
Island A is a district that is still filling in around its finished buildings, reached by road over the Infinity Bridge, and the developer's brochure lists Mall by Nakheel at two minutes and Dubai International Airport at about 10 minutes by car. For buyers deciding whether to occupy or let a ready, furnished unit now, an open beachfront beside a neighbourhood still taking shape is the context to price in. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Beach Walk Residence 2 at Completion and Handover
At a completed building three decisions arrive together: whether your unit supports a Golden Visa, where the completion payment goes, and what to check before you sign for the keys. The guides below take them one at a time.

Beach Walk Residence 2 Construction Updates
This page: the 6 August 2026 inspection record for Beach Walk Residence 2 at 100%.

Beach Walk Residence 2 Golden Visa: 2 Bedroom and 3 Bedroom Duplex
Beach Walk Residence 2, Imtiaz's 63 residences on Island A, qualifies at 2 bedroom apartments and 3 bedroom duplexes.
Read Beach Walk Residence 2 Golden Visa Guide
Beach Walk Residence 2 Escrow: The Second Release, Fully Certified
Beach Walk Residence 2, DLD project 3224, read 100% certified August 2026, its 63 units escrowed at First Abu Dhabi Bank.
Verify Beach Walk Residence 2 Escrow Account
Beach Walk Residence 2 Snagging: Apartments and 3 Bedroom Duplexes
Beach Walk Residence 2 is configured as G+2P+8F+R, holding 63 fully furnished residences, 1 and 2 bedroom apartments plus duplexes.
Book Beach Walk Residence 2 SnaggingUpdate Timeline
Other Beach Walk Residence 2 Construction Updates
August 2026 is the first monthly record published for Beach Walk Residence 2, so the hub below is where the full inspection history sits, from the August 2024 start to the completed building.
Where This Update Fits
Explore Beach Walk Residence 2 Structure
The rendering comparison at the top of this page illustrates the design, not physical construction progress; the inspection data is the record. Around it sit the island community, the homes listed for sale there, and the developer behind the building.

Island A: Four Imtiaz Projects, From Furnished Apartments to Marina-Front Penthouses
Island A is the urban waterfront core of Dubai Islands, with furnished apartments, duplexes and penthouses across four Imtiaz projects.
See Island A Properties for Sale
Island A Community Overview
Read the full Island A guide: the island's role in the Dubai Islands masterplan, property types, connectivity and pricing.
Explore the Island A Community
Imtiaz Developments: Fully Furnished Residences in Dubai Islands, JVC and Meydan
Imtiaz Developments, founded in 2011, has completed and under-construction design led residential projects in Meydan, JVC and Dubai Islands.
View the Imtiaz Developments Developer ProfileFAQs
Beach Walk Residence 2 Construction Progress in August 2026: Frequently Asked Questions
As of the RERA inspection conducted on 6 August 2026, Beach Walk Residence 2 stands at 100% in the DLD project register, where project 3224 carries the status Finished. The inspection report itself prints no percentage: it records the Progress Status as Completed, so the 100% figure is a register reading rather than a number taken from the report.
The register shows a previous inspection reading of 97.15% beside the 6 August 2026 figure, but it does not show the date of that earlier inspection. Without a date no monthly pace can be measured between the two readings, so this page plots 97.15% as an undated point on the progress track rather than as a dated entry.
The inspector found all building construction activities substantially completed on the G+2P+8F+R residential building. The report lists the Dubai Civil Defence (DCD) certificate issued 27-04-2026, the DCD LPG approval issued 16-07-2026 and the Building Completion Certificate issued 9 July 2026, together with all DEWA water and electricity meters installed, air conditioning connected by DEWA, and deep cleaning plus the developer's snagging and de-snagging progressing at site.
Not on its own. The 6 August 2026 record shows a completed building with the developer's deep cleaning and snagging still in progress and a handover status of Ready, but no source on file records any unit as transferred to its buyer. Handover starts with the developer's completion notice under each sale and purchase agreement, and the status may have moved on since the inspection date.
The DLD register lists construction as started on 10 August 2024 and the project as registered on 28 August 2024, 18 days later. Both dates are printed here exactly as recorded. The register gives no reason for the order, and it does not change the 6 August 2026 reading of 100%.
No. It is a side-by-side pair of developer renderings showing two planned exterior views of the building, used to illustrate this update, and it does not show physical construction progress. The RERA inspection report carries inspection photographs, which are record documents and are not reproduced on this page.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the August 2026 inspection record for Beach Walk Residence 2 correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.