Binghatti · Al Jaddaf · Construction Update
Binghatti Wraith Construction Update - May 2026
May 2026 Inspection Records Binghatti Wraith at the 0% Pre-Construction Baseline in Al Jaddaf
No construction activity had started when the 20 May 2026 inspection recorded Binghatti Wraith at 0 percent, the pre-construction baseline for this Al Jaddaf tower.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Binghatti Wraith Construction Snapshot
A first reading of 0% on 20 May 2026 places Binghatti Wraith at the very start of the enabling and foundations band, where the register serves as a verification baseline for early payments rather than a measure of progress.
Binghatti Wraith
4482
Active
0%
20 May 2026
1 July 2026
847 residences
60,633.75 sq m
30 December 2027
Data source: Dubai Land Department project register (Dubai REST), inspection dated 20 May 2026; the Independent Progress Monitoring Report for that visit prints no percentage and lists the progress status as N/A. Construction start and registration are shown as recorded, both dated after this inspection. The hero image is Binghatti's project rendering of the planned tower, not a record of the site. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Last updated: May 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Binghatti Wraith Construction Progress Summary
The 20 May 2026 visit opens the Binghatti Wraith inspection record, and the report from it is plain: no construction activities had started on plot 355, where the building is described as a ground floor, four podium levels, 14 residential floors and a roof. The register lists construction as started on 1 July 2026 and the project as registered on 23 July 2026, both after this visit, so there is no earlier reading to compare against and no pace to calculate yet.
- First RERA inspection visit, dated 20 May 2026
- Trust account bank on the inspection record: United Arab Bank
- Building configuration on file: G + 4P + 14 residential floors + roof
- Pre-construction stage: no construction activities started at the visit
- Progress status listed as N/A on the inspection report
- Register entries dated after this visit: construction started 1 July 2026, project registered 23 July 2026
- Enabling and foundation works on plot 355
- Ground floor and four podium levels, then 14 residential floors and the roof
- Handover expected in Q4 2027, with a registered completion date of 30 December 2027
Payment Linked Progress
What 0% Progress Means for Binghatti Wraith Buyers
Binghatti Wraith is presented with an indicative 60/40 plan, 60% during construction and 40% on completion, with the booking amount and instalment dates set in the Binghatti SPA. With the register at 0% and no works started at the May 2026 visit, what protects an early payment is the paperwork around it rather than the building, and at this stage four actions matter most.
Verify the escrow account
Any payment toward Binghatti Wraith should go only to the DLD regulated escrow account registered for project 4482, held with United Arab Bank. Binghatti Wraith escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Read the SPA payment schedule
Check how your sale and purchase agreement sets the booking amount, the instalments inside the 60% and the 40% due on completion, and how it treats a change to the Q4 2027 handover. Not sure how your instalments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Confirm the Oqood registration
Off-plan units are registered with the Dubai Land Department under Oqood against the project number, here 4482. Ask for the Oqood record after signing and check that it names you and the correct unit before later instalments fall due.
Watch for the first movement
The readings after a 0% baseline show when enabling and foundation works reach the record. The Binghatti Wraith construction updates hub logs each dated reading as it is published.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 0%?
Entering at the pre-construction baseline trades certainty for runway: nothing is built yet, the whole construction period lies ahead, and the widest choice of floors and layouts is still open. Every payment goes to the DLD-registered escrow account for project 4482, released against recorded construction progress.
- No construction activities started at the 20 May 2026 inspection
- Handover expected in Q4 2027, registered completion 30 December 2027
- Indicative 60/40 plan, to be confirmed in the Binghatti SPA: 40% due on completion
- Most of the structure visible before you commit
- A shorter wait between purchase and handover
- Less payment runway and a narrower choice of remaining units
Limited Units Available is the status listed on the project page as of this update; availability shifts between cycles.
About the Development
Binghatti Wraith Project Details

With no construction activity recorded at the 20 May 2026 inspection, Binghatti Wraith is a pre-construction Al Jaddaf tower of 847 residences, planned as a ground floor, four podium levels and 14 residential floors of studio to three bedroom apartments. Starting prices: AED 1.10M ≈ USD 300K.
Committing at the pre-construction baseline means the longest wait to handover in exchange for the widest choice of floors and the full construction period of the indicative 60/40 plan, with handover expected in Q4 2027.
Binghatti Wraith Project GuideSite Context This Cycle
Explore Binghatti Wraith Location on Dubai Map
Binghatti Wraith sits on plot 355 inside a major roundabout in Al Jaddaf, which gives the future tower road exposure on every side; at the 20 May 2026 visit the inspection record showed a cleared plot with no construction activities started, so enabling works and foundations for the ground floor and four podium levels are the first packages this site has to show.
Al Jaddaf is not waiting on its infrastructure: by the developer's figures Al Jaddaf Metro Station on the Green Line is about two minutes away, and Al Khail Road, Sheikh Zayed Road and Oud Metha Road are around 90 seconds from the roundabout, so buyers entering at the 0% baseline carry construction risk on the building, not on the district around it. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Binghatti Wraith at the Pre-Construction Stage
Before the first floor rises, the decisions that count are residency eligibility and where each payment goes. Each resource below is matched to Binghatti Wraith at its May 2026 pre-construction reading.

Binghatti Wraith Construction Updates
This page: the May 2026 DLD register reading for Binghatti Wraith, recorded at the 0% baseline.

Binghatti Wraith at Al Jaddaf Golden Visa: Studios and 1 Bedrooms Below
Binghatti Wraith at Al Jaddaf, an 847-residence freehold apartment tower, qualifies at its 2 and 3 bedroom apartments only.
Read Binghatti Wraith Golden Visa Guide
Binghatti Wraith at Al Jaddaf Escrow, Held at United Arab Bank
Binghatti Wraith at Al Jaddaf is DLD project 4482, 881 units escrowed with United Arab Bank, certified 0% in May 2026.
Verify Binghatti Wraith Escrow AccountUpdate Timeline
Other Binghatti Wraith Construction Updates
May 2026 is the first reading in the Binghatti Wraith record. Each later inspection will be added to the hub as it is published, so the full history stays in one place.
Where This Update Fits
Explore Binghatti Wraith Structure
The May 2026 reading sits inside a wider picture: the Al Jaddaf listings a buyer can compare today, the district around plot 355, and the developer behind the tower.

Al Jaddaf: Binghatti Wraith and Amazonia Apartments on the Creek
Al Jaddaf, the creekside district on the Bur Dubai bank, lists apartments in Binghatti Wraith and Amazonia on 60/40 payment plans.
See Al Jaddaf Properties for Sale
Al Jaddaf: A Creek-Side District With Two Green Line Metro Stations
Al Jaddaf sits on the Bur Dubai bank of the Creek, home to Jaddaf Waterfront and a growing branded-residence pipeline.
Explore the Al Jaddaf Community
Binghatti: Record Construction Speed and Branded Towers With Bugatti and Mercedes-Benz
Binghatti has delivered more than 60 projects since 2008, with 27 under development and two master communities across Dubai.
View the Binghatti Developer ProfileFAQs
Binghatti Wraith Construction Progress in May 2026: Frequently Asked Questions
The Dubai Land Department project register records Binghatti Wraith at 0% construction progress at the inspection dated 20 May 2026, the first reading on file for project 4482. The Independent Progress Monitoring Report for that visit prints no percentage and lists its progress status as N/A, so the 0% figure is the register reading rather than a value taken from the report.
The inspector's note for the 20 May 2026 visit states that no construction activities had been started at the time of inspection. The same report describes the planned building as a ground floor, four podium levels, 14 residential floors and a roof on plot 355, and names United Arab Bank as the trust account bank for the project.
The register lists construction as started on 1 July 2026 and the project as registered on 23 July 2026, both dated after the 20 May 2026 inspection. The dates are shown here exactly as recorded; the register gives no reason for their order, and the same entries for project 4482 can be viewed on the Dubai REST app.
No register date is final. As of the May 2026 reading, the DLD record lists a registered completion date of 30 December 2027, which falls inside the Q4 2027 handover Binghatti indicates, and registered dates can be revised between inspection cycles. How readings and dates are followed over the life of the build is covered on the Binghatti Wraith construction updates hub.
It means that, at the time of this reading, a buyer was committing to a tower on which no construction had begun, so protection rested on the escrow account and the SPA rather than on visible progress. The checks that matter at this stage are that every payment goes to the United Arab Bank escrow account for project 4482, that the Oqood registration names the buyer and the unit, and that the SPA sets out how the indicative 60/40 plan is scheduled.
With no works started at the 20 May 2026 visit, the next stage in the record is enabling and foundation work on plot 355, followed by the four podium levels. No date for the next inspection was shown in the register as of this update, and the next reading will be added to the record once it is published.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the May 2026 inspection record for Binghatti Wraith at Al Jaddaf correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.