Nakheel · Palm Jumeirah · Construction Update
Como Residences Construction Update - February 2023
February 2023 Inspection Records the 0% Baseline for Como Residences on Palm Jumeirah
No construction activity was found on the Como Residences plot at its RERA inspection on 22-02-2023, setting the 0% baseline for every later register reading.
Direct advisor access. Every message answered personally, never by a call center.
Verified DLD Inspection Data
Como Residences Construction Snapshot
No change to measure yet: 0% on 22-02-2023 is the first reading on record. It places Como Residences at the baseline before any enabling or foundation works, taken ahead of the project's 12-04-2023 registration and its 27-09-2023 construction start in the DLD register.
Como Residences by Nakheel
2565
Active
0%
22-02-2023
27-09-2023
81 residences
68,563.62 sq m
Q3 2027
Data source: the DLD project register reading of 0% for the inspection conducted on 22-02-2023, read with the Independent Progress Monitoring Report for that date, which prints no percentage and records its Progress Status as N/A; register fields are shown as the register records them. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. This reading was 1,311 days old when this page was prepared on 25-09-2026: re-verify on Dubai REST before publishing. The hero image is a project rendering, not a site photograph. Last updated: February 2023.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Como Residences Construction Progress Summary
There is no earlier inspection to compare against: the report for 22-02-2023 is the first entry for project 2565 on plot 2692, and its only note records that no construction activities were found at site. With nothing yet built, this report fixes the starting line from which every later Como Residences reading on this cluster is measured.
- First inspection report for project 2565 on plot 2692, Palm Jumeirah
- Report description: Ground + 3 podiums + 72 floors Residential
- Planned build: concrete structure and block with internal and external finishes
- No construction activities found at site on the inspection date
- Progress Status field printed as N/A on the report
- DLD register reading of 0%, the baseline for later cycles
- Registration in the DLD register, recorded on 12-04-2023
- Registered construction start, recorded as 27-09-2023
- Every construction stage of the 81 residence tower
- Handover expected Q3 2027; registered completion date 27-03-2027
Payment Linked Progress
What 0% Progress Means for Como Residences Buyers
Payments follow a dated schedule while construction follows the register, so a 0% baseline is where the two tracks first sit side by side. In Nakheel's launch schedule of record the first dated instalment is 10% on 30-10-2023, so none of the dated instalments fell on or before this 22-02-2023 reading. From this starting point, four actions matter most.
Verify the escrow account
Every payment toward a Como Residences unit belongs only in the DLD regulated escrow account registered for project 2565. Como Residences escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA milestone schedule
Check how your sale and purchase agreement dates each instalment against the Q3 2027 handover, and set those dates beside the register readings rather than the brochure. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the recorded register readings.
Confirm your Oqood registration
Off plan contracts in Dubai are registered with the DLD through Oqood, and Como Residences entered the register on 12-04-2023, after this inspection. Confirm that your own contract appears there under project 2565 before relying on it.
Track the readings from zero
The 0% recorded on 22-02-2023 is the reference point for every later reading of this tower. Como Residences construction updates lists each dated inspection in order, so movement is read against this baseline.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at the 0% Baseline?
Read in hindsight, an entry at this reading meant carrying the whole construction schedule ahead, with only the plan, the plot and the register record to judge it by, in exchange for the longest runway to handover. Every payment goes to the DLD-registered escrow account for project 2565, released against construction progress recorded in the DLD project register.
- No construction activities found at site on 22-02-2023
- Registration and the 27-09-2023 construction start still ahead
- First dated instalment in the launch schedule of record: 30-10-2023
- Structure largely built and inspected before the purchase
- A shorter wait between contract and handover
- Shorter installment runway, priced at later stage levels
Availability is confirmed unit by unit at the time you ask; availability shifts between cycles.
About the Development
Como Residences Project Details

At the 22-02-2023 reading the plot showed no construction activity, while the plan on record was one tower of 81 residences, 71 floors by Nakheel's count, from 2 bedroom apartments to a 7 bedroom duplex. Current starting prices: AED 27.00M ≈ USD 7.35M.
Measured from this baseline, the trade off was the longest wait for delivery against the earliest place in the payment schedule, with handover expected in Q3 2027 and every construction stage still ahead.
Como Residences by Nakheel Project GuideSite Context This Cycle
Explore Como Residences Location on Dubai Map
Como Residences is recorded on plot 2692 in the heart of Palm Jumeirah, a beachfront setting among low-rise villas where Nakheel positions the tower for views toward Burj Al Arab, Burj Khalifa and Ain Dubai. On 22-02-2023 that plot was still unbuilt: the photographs attached to the inspection report show cleared, level ground with villas beyond it.
Palm Jumeirah was already a lived-in island when this baseline was taken, with its roads, beaches, hotels and utilities in place, so the tower was planned to rise into a finished community rather than an emerging one; for buyers, the open question at this stage was construction delivery against the Q3 2027 handover, not district infrastructure. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Como Residences Before Construction Began
At a 0% baseline, the questions that count are the ones settled before money moves: where payments are held and whether the purchase supports residency. Each resource below is matched to that starting point for Como Residences.

Como Residences Construction Updates
This page: the February 2023 baseline for Como Residences, recorded at 0% before project registration.

Como Residences Golden Visa: 81 Residences on Palm Jumeirah
Como Residences, Nakheel's 81-residence tower on Palm Jumeirah, has each listed unit type clear the threshold individually, under Oqood during construction.
Read Como Residences Golden Visa Guide
Como Residences Escrow: Nakheel's Palm Jumeirah Account at Commercial Bank of Dubai
Nakheel's Como Residences on Palm Jumeirah is DLD project 2565, with 81 units and its escrow at Commercial Bank of Dubai.
Verify Como Residences Escrow AccountUpdate Timeline
Other Como Residences Construction Updates
This February 2023 page opens the Como Residences inspection record; each later update is read against the 0% baseline set here, one dated reading at a time.
All Como Residences Construction UpdatesWhere This Update Fits
Explore Como Residences Structure
The February 2023 baseline sits inside a wider record: the island Nakheel built around plot 2692, the developer's own portfolio, and the Palm Jumeirah homes a buyer would weigh against this tower.

Palm Jumeirah Dubai Properties for Sale
Browse beachfront apartments, penthouses, sky mansions and signature villas for sale across Palm Jumeirah.
See Palm Jumeirah Dubai Properties for Sale
Palm Jumeirah Dubai Community Overview
Read the Palm Jumeirah guide: Nakheel's island of signature villas, branded residences, private beaches and five-star resorts.
Explore the Palm Jumeirah Dubai Community
Nakheel: The Master Developer of Dubai's Island Living and Reclaimed Coastline
Founded in 2003, Nakheel created Palm Jumeirah and Dubai Islands, adding over 300 kilometers of coastline and building complete waterfront communities.
View the Nakheel Developer ProfileFAQs
Como Residences Construction Progress in February 2023: Frequently Asked Questions
The DLD project register records 0% for Como Residences at the inspection conducted on 22-02-2023, the first reading on record for project 2565. The Independent Progress Monitoring Report for that date prints no percentage of its own and shows N/A in its Progress Status field.
Nakheel's expected handover is Q3 2027, and the DLD register lists a registered completion date of 27-03-2027; both are stated here side by side, as recorded. Register dates can be revised between inspection cycles, so the current record is the one to check, and each later dated reading is listed on the Como Residences construction updates guide.
No. The inspection notes for 22-02-2023 read, as recorded: no construction activities found at site. The report describes the planned building as a concrete structure and block with internal and external finishes, so every one of those works still lay ahead of this reading.
The 22-02-2023 inspection came before both later register events: the DLD register records the project as registered on 12-04-2023, 49 days later, and construction as started on 27-09-2023, 217 days later. All three dates are printed as recorded, with the 0% reading treated as the baseline taken before the start.
It shows that the 22-02-2023 report assigned no stage label in its Progress Status field and printed no percentage; the 0% figure on this page is the DLD register reading for the same date. Later inspection reports for project 2565 carry named statuses, quoted as recorded on their own monthly pages.
No. In Nakheel's launch schedule of record, the first dated instalment is 10% on 30-10-2023, followed by five more 10% instalments every six months to 30-04-2026 and 20% on handover, after 20% upon booking. None of those dates falls on or before 22-02-2023; the terms for any unit bought today are set in its own sale and purchase agreement.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the February 2023 inspection record for Como Residences correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.