Ellington · Meydan Horizon
Eaton Square Construction Updates
Reading the Register for a Floor-by-Floor Office Tower Beside the Meydan Horizon Lagoon
Eaton Square's DLD register reading of 5.39%, recorded on 20 July 2026, opens an early record of enabling and foundation work on its Meydan Horizon office site.
Construction tracking against RERA inspection data, updated after every recorded inspection.
Direct advisor access. Every message answered personally, never by a call center.
Construction Snapshot
Eaton Square at a Glance
Eaton Square is Ellington's office tower of 24 commercial units in Meydan Horizon, entered in the Dubai Land Department register as project 4301. Its record is still short: a construction start on 01 December 2025, registration on 13 January 2026, and one dated register reading of 5.39%, recorded on 20 July 2026. Because the developer sells each office floor or duplex to a single owner, every reading below describes the one building all of those owners are waiting on, with handover expected in Q2 2028.
4301
Active
01 December 2025
24 commercial units
15,702.61 sq m
30-06-2028 (DLD)
Figures from Dubai Land Department registration records, updated after each recorded inspection. How every project on this site is tracked is explained once on the Dubai Construction Updates hub.
Inspection Record
Eaton Square Construction Update Timeline
The Eaton Square record holds one dated reading so far: 5.39% on the DLD register, recorded on 20 July 2026, the day RERA inspected the site and noted enabling and foundation work progressing. The register also lists a previous inspection at 0% with no date attached, drawn on the track as a plain dot without a month, so it adds no row to the table. The July 2026 row links its full update, and each later reading will be added above it as a new dated row.
| Inspection Month | Construction Progress | Inspection Date | Full Update |
|---|---|---|---|
| July 2026 | 5.39% | 20 July 2026 | View the July 2026 update |
Pace Analysis
How Fast Eaton Square Has Been Built
With a single dated reading on file, Eaton Square's pace can only be read as a whole-build average, measured from the construction start the register records on 01 December 2025:
- 01 Dec 2025 to 20 Jul 2026: recorded start to the July 2026 register reading of 5.39%, over 231 days of enabling and foundation workAbout 0.70 points per month
That figure is arithmetic, not a forecast. It spreads the 5.39% recorded on 20 July 2026 evenly across the 231 days since the recorded start, while RERA's notes for that same day place all of the work in the enabling and foundation stage, ahead of the two basements in the developer's design. The undated 0% reading cannot anchor a shorter interval, so whether Eaton Square's curve steepens or flattens will only show once a second dated reading joins the record. For an owner holding a whole office floor, and for an investor weighing an entry before the first construction-linked instalment, the practical step is the same: confirm the current construction timetable with the developer in writing and compare each new register reading against it.
Get the Next Inspection Figure First
Tell me you are tracking Eaton Square and I will send you the next recorded figure and site photos directly, ahead of the page update.
Get the Next Update on WhatsAppProject Profile
About Eaton Square at Meydan Horizon
A register reading only matters in the context of what the work is building toward. The full project guide covers the offices this record is tracking:

Eaton Square: Ellington's First Commercial Tower, Sold Floor by Floor
Eaton Square stacks full-floor offices and two double-height duplex offices from the 6th to 18th floor above a fifth-floor amenity level.
View the Eaton Square Project GuideConsidering an Early-Stage Entry?
Eaton Square is sold floor by floor, so every office level that changes hands narrows what remains, and availability shifts between inspection cycles. If the record on this page is what brought you here, ask me which floors are open before you plan around the next reading.
Ask About Remaining Availability on WhatsAppStage Record
Eaton Square Build Stages, Mapped to the Inspections
Each stage below is pinned to what the Eaton Square record shows: two register dates before any reading, one dated reading in July 2026, and the stages of the developer's design that the 20 July 2026 record does not yet reach.
Recorded Start and Registration
The DLD register records construction as started on 01 December 2025 and the project as registered on 13 January 2026; both dates appear here as recorded.
Enabling and Foundation Works
RERA's report of 20 July 2026 noted enabling and foundation work progressing, Progress Status Enabling Works, Progressing, as the register recorded 5.39%.
Basements and Podium Parking
The developer's design places two basements and four podium parking levels beneath the lobby and offices; the 20 July 2026 record does not reach this stage.
Construction-Linked Milestones
The 70/30 plan's four 5% instalments fall due at 20%, 30%, 40% and 50% construction of the project; the 5.39% recorded on 20 July 2026 had triggered none.
Office Fit-Out, Commissioning and Handover
Handover is expected in Q2 2028, against a registered completion date of 30-06-2028; the plan's final 30% falls due on completion.
What each construction stage involves in general is covered once in the guides on the Dubai Construction Updates hub, so this page stays focused on Eaton Square's own record.
Buyer Position
Tracking Your Position at Eaton Square
This page is one of four project resources that together cover a Eaton Square purchase from payment protection to residency to handover. You are on the construction record; the siblings sit one click away:

Eaton Square Construction Updates
This page: Eaton Square's dated DLD register readings and RERA notes, from the December 2025 start.

Eaton Square Golden Visa: Full-Floor Offices and the Residency Question
Every Eaton Square office sits above the Golden Visa threshold; whether a commercial purchase supports it is decided by the ICP.
Read the Eaton Square Golden Visa Guide
Eaton Square Escrow: Office Instalments at Al Ahli Bank of Kuwait
Eaton Square office payments go to an escrow at Al Ahli Bank of Kuwait, DLD project 4301, with 24 registered units.
Verify the Eaton Square Escrow AccountApproaching Handover
Between 5.39% and Handover: What Eaton Square Buyers Should Do Now
The 5.39% recorded on 20 July 2026 left all four construction-linked instalments of Ellington's 70/30 plan still ahead, the first of them at 20% construction. What does fall due in this period runs on each buyer's own reservation date rather than on the register, so the three checks below belong before your next dated instalment, not at the first construction milestone.
First, make sure every instalment goes only to the project's escrow account with Al Ahli Bank of Kuwait, Dubai Branch; the Eaton Square escrow account page shows how to match it to project 4301.
Second, if residency is part of the plan, read the Eaton Square Golden Visa guide before relying on it: every office tier is priced above AED 2M ≈ USD 545K, but whether a commercial office purchase supports the property-investor visa is decided under the ICP's current rules.
Third, with handover expected in Q2 2028 and a registered completion date of 30-06-2028, confirm the current construction timetable with the developer in writing, then check each new register reading against it, starting from the Eaton Square July 2026 inspection record.
Send me your unit number on WhatsApp and I will tell you what the latest inspection means for your handover and map the sequence for your specific unit.
The Wider Picture
Explore Meydan Horizon Structure
A register reading for one office tower reads best next to the community and developer around it. These three pages set the Eaton Square record in its Meydan Horizon and Ellington context:

Meydan Horizon: The Symphony Apartments in a Lagoon District
Meydan Horizon, the Dubai Holding lagoon district beside Ras Al Khor Wildlife Sanctuary, has The Symphony apartments for sale.
See Meydan Horizon Properties for Sale
Meydan Horizon: Four Crystal Lagoons Facing Ras Al Khor Wildlife Sanctuary
Meydan Horizon is a lagoon district planned for 72,000 residents, with towers by Ellington, Imtiaz and Dubai Investments.
Explore the Meydan Horizon Community
Ellington Properties: Design-Led Boutique Residences With Curated Interiors
Ellington Properties, founded in 2014, is a design-led developer of apartments, villas and waterfront homes, with 30 developments launched and delivered.
View the Ellington Developer ProfileConstruction tracking for other Dubai projects is indexed on the Dubai Construction Updates hub.
FAQs
Eaton Square Construction Updates Frequently Asked Questions
Eaton Square is an active project on the Dubai Land Department register, number 4301, last recorded at 5.39% on 20 July 2026, when the RERA report set its Progress Status to Enabling Works, Progressing. The dated record sits in the inspection timeline above, and a newer reading may since have been published on Dubai REST.
The latest dated entry for Eaton Square, recorded on 20 July 2026, is 5.39% on the DLD register, up 5.39 points from a previous inspection of 0% whose date the register does not show. The RERA report from that inspection prints no percentage of its own, and the July 2026 Eaton Square construction update covers it in full.
Eaton Square carries a registered completion date of 30-06-2028 in the DLD project register, the closing day of Q2 2028, the quarter in which handover is expected. Both dates stood alongside the 5.39% recorded on 20 July 2026; buyers should confirm the current construction timetable with the developer in writing, and this page's record is updated as new readings are published.
Eaton Square has 24 commercial units, the unit count the Dubai Land Department register shows for project 4301 alongside the 20 July 2026 reading. The register does not break that figure down by type; per the developer, the offices are sold as full-floor offices and Special Duplex Offices 01 and 02, one owner per floor or duplex.
Across the 231 days from the construction start recorded on 01 December 2025 to the 5.39% recorded on 20 July 2026, Eaton Square averaged about 0.70 points per month (arithmetic, not a forecast). With one dated reading on file, no pace between two inspections can be measured yet; the pace analysis above sets out the calculation.
The Dubai Land Department register records the Eaton Square construction start as 01 December 2025 and the project registration as 13 January 2026; both dates are shown here exactly as recorded. The earliest dated reading on file for project 4301 is 5.39%, recorded on 20 July 2026.

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is keeping the Eaton Square construction record accurate, inspection by inspection, until handover, walking the site personally each inspection period. Client identities and transactions are never published or referenced. Message or call me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.