DAMAC · DAMAC Hills 2 · Construction Update
Evergreens Construction Update - May 2026
May 2026 DLD Register Reading Places Evergreens at 26.43% Construction Progress in DAMAC Hills 2
Structure works at advanced stages and early MEP activity marked Evergreens at the 5 May 2026 inspection, read at 26.43 percent on the Dubai Land Department register.
Direct advisor access. Every message answered personally, never by a call center.
DLD Register Data
Evergreens Construction Snapshot
A 9.24 point difference over the undated previous field of 17.19% brings Evergreens to 26.43% on the Dubai Land Department register as of 5 May 2026, placing the project in the superstructure band, where construction-linked installments and a steady tracking cadence start to matter.
Evergreens at DAMAC Hills 2
3092
Active
26.43%
5 May 2026
3 July 2024
131 residential units
16,030.41 sq m
Q4 2026
Data source: Dubai Land Department project register reading for project 3092 on the inspection report dated 5 May 2026, with site notes from the RERA Independent Progress Monitoring Report of the same date. Construction tracking against RERA inspection data runs across the full tohidfetrat.com project portfolio and is reviewed after every published cycle. Figures are as of 5 May 2026 and a newer register reading may since have been posted. The hero image is a developer rendering of the planned pool and play area, not a record of construction progress. Last updated: October 2026.
Want each new reading the day it publishes? Message me on WhatsApp and I will send it to you directly: one message per inspection cycle, nothing else. Message me on WhatsApp
This Inspection Cycle
Evergreens Construction Progress Summary
The RERA report of 5 May 2026 found enabling and foundation works substantially completed, structure works at advanced stages, MEP at an early stage and site mobilization still ongoing, while the register moved Evergreens from its previous field of 17.19% to 26.43%. Put simply, the ground work was largely complete and the building frame carried most of the recorded effort.
- Project registration on the DLD register on 23 May 2024
- Construction start recorded on 3 July 2024
- Enabling and foundation works, reported substantially completed on 5 May 2026
- Structure works on the mid-rise building of ground, podium, seven upper floors and roof, reported at advanced stages
- MEP works, reported at an early stage
- Site mobilization, noted as ongoing in the RERA report
- Blockwork, MEP completion, and internal and external finishes across the 131 residential units
- The central pool deck between the Tower A and Tower B wings shown on the developer floor plans
- Handover targeted for Q4 2026
Payment Linked Progress
What 26.43% Progress Means for Evergreens Buyers
Evergreens runs on a 20/50/30 plan: 20% at booking, 50% across construction per the developer's schedule, and 30% on handover. With the register at 26.43%, the construction share is the live part of that plan, so the order of checks matters more than the headline figure. At this stage of Evergreens, four actions matter most.
Verify the escrow account
Construction installments should go only to the DLD regulated escrow account registered for project 3092, listed as DAMAC Hills (2) - Evergreens, with Emirates NBD named as the trust account bank on the RERA report. Evergreens escrow account verification is the step before any transfer; the lookup itself takes about two minutes against the official DLD project record.
Reread your SPA milestone schedule
The plan gives shares, not dates: check how your sale and purchase agreement schedules the 50% construction share, which installments are already called, and how the 30% handover payment ties to the Q4 2026 target. Not sure how your installments map to this reading? Send me your SPA schedule and I will map it against the recorded milestones.
Confirm your Oqood registration
Oqood is the Dubai Land Department's interim register for off plan sales. Check that your Evergreens apartment is recorded in your name against project 3092 before construction installments build up, since that record anchors your claim until title is issued at handover.
Track the remaining cycles
Each new RERA visit updates the register reading, and comparing successive readings against the Q4 2026 target is how the construction share is best timed. The Evergreens construction updates hub collects each reading as it posts.
General framework, not legal advice: milestone definitions, notice periods, and fee obligations are set by your individual SPA and the DLD record, and both should be read directly.
Buying at 26.43%?
Entering during the superstructure stage means buying with the foundations reported substantially complete and the frame advancing, while the 30% handover share is still ahead and the construction share runs on the developer's schedule. Every payment goes to the DLD-registered escrow account for project 3092, released against recorded construction progress.
- Enabling and foundation works reported substantially completed on 5 May 2026
- Structure works reported at advanced stages in the same RERA report
- 30% of the 20/50/30 plan due on handover, targeted for Q4 2026
- Construction risk carried from excavation onward
- The longest wait between booking and keys
- Full installment runway, priced at launch levels
Limited Units Available as of this update; availability shifts between cycles.
About the Development
Evergreens Project Details

With foundations reported substantially complete and the frame at advanced stages on 5 May 2026, Evergreens is an early-to-mid stage build of 131 one and two bedroom apartments, each with a balcony. Starting prices: AED 650K ≈ USD 177K.
For buyers entering now, the trade off is a construction share paid alongside the build against a 30% balance due at the Q4 2026 handover target, in park-view or pool-view homes set around a central pool deck on the developer floor plans.
Evergreens at DAMAC Hills 2 Project GuideSite Context This Cycle
Explore Evergreens Location on Dubai Map
Evergreens sits inside DAMAC Hills 2, where the developer floor plans set its residences in two wings around a central pool deck, one aspect facing parkland and the other the pool. With structure works at advanced stages and MEP at an early stage on 5 May 2026, the external finishes on both aspects and the landscaped pool deck shown in the developer renderings were still to come.
DAMAC Hills 2 is a self-contained master community reached via Al Qudra Road, and DAMAC's brochure organises its leisure offer across three themed towns, Water Town, Sports Town and Down Town, so the wider amenities do not hinge on this one building. For a buyer at 26.43%, that narrows the open question to the building itself: how its frame, services and finishes progress toward the Q4 2026 handover target. See the project's position on the interactive Dubai real estate map. See the project’s position on the interactive Dubai real estate map.

Buyer Resources for This Project
Investing in Evergreens During Superstructure Progress
The superstructure band is where payment protection and residency planning outweigh handover logistics. Each resource below is matched to where Evergreens stood at 26.43% on 5 May 2026.

Evergreens Construction Updates
This page: the 5 May 2026 DLD register reading for Evergreens, with RERA report notes explained.

Evergreens at DAMAC Hills 2 Golden Visa: A Clear Threshold Check
Neither the 1 nor 2 bedroom at Evergreens at DAMAC Hills 2, DAMAC's 131-residence project, qualifies alone, under Oqood now.
Read Evergreens Golden Visa Guide
Evergreens at DAMAC Hills 2 Escrow: DAMAC's Emirates NBD Account
Evergreens at DAMAC Hills 2 is DLD project 3092, its 131 units escrowed at Emirates NBD, 26.43% certified in May 2026.
Verify Evergreens Escrow AccountUpdate Timeline
Other Evergreens Construction Updates
May 2026 is the first monthly record for Evergreens on this site; later readings join the hub timeline as each one is published.
Where This Update Fits
Explore Evergreens Structure
The 5 May 2026 reading sits inside a wider picture: the competing listings across DAMAC Hills 2, the way the community around Evergreens is organised, and DAMAC's record as the developer marketing it.

DAMAC Hills 2 Properties for Sale
Browse villas, townhouses and selected apartments for sale in DAMAC Hills 2, with prices and payment plans.
See DAMAC Hills 2 Properties for Sale
DAMAC Hills 2 Community Overview
Read the DAMAC Hills 2 guide: a self-contained villa community with themed clusters, lifestyle zones and family amenities.
Explore the DAMAC Hills 2 Community
DAMAC Properties: Lagoon Communities, Golf Villas and Branded Collaborations
Founded in 2002, DAMAC has delivered 48,000 homes and is known for large-scale master communities, luxury residential projects and branded collaborations.
View the DAMAC Developer ProfileFAQs
Evergreens Construction Progress in May 2026: Frequently Asked Questions
The Dubai Land Department register shows Evergreens, project 3092, listed as DAMAC Hills (2) - Evergreens, at 26.43% construction progress on the inspection report dated 5 May 2026. The RERA progress report of the same date prints no percentage of its own; it records the progress status as Main Contract, Progressing.
It places Evergreens a little over a quarter of the way along the register's progress scale as of 5 May 2026, with 73.57 percentage points still to be recorded before 100%. A single reading does not confirm or move the Q4 2026 handover target; later readings show how the build advances toward it, and the full reading history is kept on the Evergreens construction updates hub.
On the DLD inspection card dated 5 May 2026, the Previous Inspection field reads 17.19% and the Current Progress field reads 26.43%. The previous field carries no date, so it shows where the register stood at an earlier inspection without saying when that visit took place, and no monthly pace can be worked out from the pair.
The RERA Independent Progress Monitoring Report dated 5 May 2026 found enabling and foundation works substantially completed, structure works progressing at advanced stages, MEP works at an early stage, and mobilization still ongoing. It describes a mid-rise residential building of ground, podium, seven upper floors and roof, built with a concrete structure and blockwork and finished internally and externally, and it carries inspection photographs.
The DLD record for project 3092 shows the project registered on 23 May 2024 and construction started on 3 July 2024, 41 days later. Off plan projects in Dubai are registered with the Dubai Land Department, together with their escrow arrangements, before off plan sales begin, so a registration date ahead of the recorded start of works is a normal sequence rather than a gap in the record.
It is a developer rendering of the planned outdoor swimming pool, children's play equipment and the adjoining residential building, used to illustrate the finished project. It is not a record of construction progress as of 5 May 2026; the RERA report of that date carries its own inspection photographs, which remain record documents and are not republished on this page.
A Question the FAQ Can Not Answer?

Your Advisor
Tohid Fetrat
Independent of the developer: I work for the buyer, and my only job on this page is helping you read the May 2026 inspection record for Evergreens at DAMAC Hills 2 correctly before your next payment decision. Client identities and transactions are never published or referenced. Message me directly: you will always reach me personally, never a call center or sales team.
Ask your question, get your answer. No obligation and no follow-up unless you ask for it.